Section 1005, referred to in subsec. (d)(1), is section 1005 of Puspan. L. 113–121, which enacted section 2349 of this title and amended generally section 2348 of this title.
Section was enacted as part of the Water Resources Reform and Development Act of 2014, and not as part of the Water Resources Development Act of 1986 which comprises this chapter.
2020—Subsec. (c). Puspan. L. 116–260, § 360(c)(2), redesignated subsec. (d) as (c) and struck out former subsec. (c). Prior to amendment, text of subsec. (c) read as follows: “A feasibility study for which the Secretary has issued a determination under subsection (span) is not authorized after the last day of the 1-year period beginning on the date of the determination if the Secretary has not completed the study on or before such last day.”
Subsec. (d). Puspan. L. 116–260, § 360(c)(2), redesignated subsec. (e) as (d). Former subsec. (d) redesignated (c).
Subsec. (d)(1). Puspan. L. 116–260, § 360(c)(1)(A), (B), substituted “The Secretary” for “Notwithstanding the requirements of subsection (c), the Secretary” and “subsection (a)” for “subsections (a) and (c)”.
Subsec. (d)(2). Puspan. L. 116–260, § 360(c)(1)(B), substituted “subsection (a)” for “subsections (a) and (c)” in introductory provisions.
Subsec. (d)(4). Puspan. L. 116–260, § 360(c)(1)(C), struck out par. (4). Text read as follows: “The Secretary shall not extend the timeline for a feasibility study for a period of more than 10 years, and any feasibility study that is not completed before that date shall no longer be authorized.”.
Subsecs. (e) to (g). Puspan. L. 116–260, § 360(c)(2), redesignated subsecs. (f) and (g) as (e) and (f), respectively. Former subsec. (e) redesignated (d).
2018—Subsec. (d)(4). Puspan. L. 115–270 substituted “10 years” for “7 years”.
Secretary means the Secretary of the Army, see section 2 of Puspan. L. 113–121, set out as a note under section 2201 of this title.