View all text of Subjgrp 167 [§ 285.705 - § 285.714]
§ 285.712 - What are the CVA's or project engineer's reporting requirements?
(a) The CVA or project engineer must prepare and submit to you and BSEE all reports and records required by this subpart. The CVA or project engineer must also submit interim reports to you and BSEE, as requested by BSEE. BSEE will review and respond within 30 days.
(b) For each report required by this subpart, the CVA or project engineer must submit the final report to BSEE pursuant to § 285.110. In each report, the CVA or project engineer must:
(1) Give details of how, by whom, and when the CVA or project engineer activities were conducted;
(2) Describe the CVA's or project engineer's activities during the verification process;
(3) Summarize the CVA's or project engineer's findings; and
(4) Provide any additional comments that the CVA or project engineer deems necessary.
(5) Summarize any issues with the design and any incidents during facility fabrication and installation, or Critical Safety System and Equipment commissioning, and how those issues were resolved.