Subpart G. Subpart G—Facility Design, Fabrication, and Installation
Reports
- SECTION § 285.700 - What reports must I submit to BSEE before installing facilities described in my approved SAP, COP, or GAP?
- SECTION § 285.701 - What must I include in my Facility Design Report?
- SECTION § 285.702 - What must I include in my Fabrication and Installation Report?
- SECTION § 285.703 - What reports must I submit for project modifications and repairs?
- SECTION § 285.704 - After receiving the FDR, FIR, or project verification reports, what will BSEE do?
Certified Verification Agent
- SECTION § 285.705 - When must I use a Certified Verification Agent (CVA)?
- SECTION § 285.706 - How do I nominate a CVA for BSEE approval?
- SECTION § 285.707 - What are the CVA's primary duties for facility design review?
- SECTION § 285.708 - What are the CVA's or project engineer's primary duties for fabrication and installation review?
- SECTION § 285.709 - When conducting onsite fabrication inspections, what must the CVA or project engineer verify?
- SECTION § 285.710 - When conducting onsite installation inspections, what must the CVA or project engineer do?
- SECTION § 285.711 - [Reserved]
- SECTION § 285.712 - What are the CVA's or project engineer's reporting requirements?
- SECTION § 285.713 - [Reserved]
- SECTION § 285.714 - What records relating to FDRs, FIRs, and Project Modification and Repair Reports must I keep?