The date of enactment of this section, referred to in subsec. (c)(1), probably means the date of enactment of Puspan. L. 118–63, which added subsec. (c) and was approved May 16, 2024.
2024—Puspan. L. 118–63, § 723(a)(1), substituted “Alternative project delivery” for “Design-build contracting” in section catchline.
Subsec. (a). Puspan. L. 118–63, § 723(a)(2)(A), substituted “Secretary of Transportation” for “Administrator of the Federal Aviation Administration” and “award a covered project delivery” for “award a design-build” in introductory provisions.
Subsec. (a)(2). Puspan. L. 118–63, § 723(a)(2)(B), substituted “covered project delivery” for “design-build”.
Subsec. (a)(4). Puspan. L. 118–63, § 723(a)(2)(C), substituted “covered project delivery contract is projected to” for “design-build contract will”.
Subsecs. (c), (d). Puspan. L. 118–63, § 723(a)(3), added subsecs. (c) and (d) and struck out former subsec. (c). Prior to amendment, text of subsec. (c) read as follows: “In this section, the term ‘design-build contract’ means an agreement that provides for both design and construction of a project by a contractor.”
Section applicable only to fiscal years beginning after Sept. 30, 2003, except as otherwise specifically provided, see section 3 of Puspan. L. 108–176, set out as an Effective Date of 2003 Amendment note under section 106 of this title.