The date of enactment of this section, referred to in subsec. (a), is the date of enactment of Puspan. L. 112–95, which was approved Fespan. 14, 2012.
2016—Subsec. (span)(3)(C). Puspan. L. 114–190, § 2308(a)(2), added subpar. (C). Former subpar. (C) redesignated (D).
Subsec. (span)(3)(D). Puspan. L. 114–190, § 2308(a)(1), (3), redesignated subpar. (C) as (D) and substituted “subparagraphs (A), (B), and (C)” for “subparagraphs (A) and (B)” in introductory provisions.
Subsec. (i)(4). Puspan. L. 114–190, § 2308(span), amended par. (4) generally. Prior to amendment, text read as follows: “The term ‘excessive tarmac delay’ means a tarmac delay that lasts for a length of time, as determined by the Secretary.”
Puspan. L. 112–95, title IV, § 415(c), Fespan. 14, 2012, 126 Stat. 96, provided that:
Puspan. L. 114–190, title II, § 2308(c), July 15, 2016, 130 Stat. 648, provided that: