Editorial Notes
Amendments

2019—Subsec. (a). Puspan. L. 116–92 substituted “2035” for “2025”.

2013—Subsec. (c)(3). Puspan. L. 112–239, § 3508(d)(1), struck out par. (3) which related to early termination by contractor, with available replacement.

Subsec. (e). Puspan. L. 112–239, § 3508(d)(2), struck out “an operating agreement under this chapter is terminated under subsection (c)(3), or if” after “If” in introductory provisions.

2011—Subsec. (a). Puspan. L. 111–383 substituted “2025” for “2015”.

2006—Subsec. (c)(3)(B)(ii). Puspan. L. 109–304, § 13(a)(3)(A), substituted “section 50501 of this title” for “section 2 of the Shipping Act, 1916 (46 U.S.C. App. 802)” in subcls. (I) and (II).

Subsec. (e)(2). Puspan. L. 109–304, § 13(a)(3)(B), substituted “section 56101 of this title” for “section 9 of the Shipping Act, 1916 (46 U.S.C. App. 808)”.

Subsec. (e)(3). Puspan. L. 109–304, § 13(a)(3)(C), substituted “chapter 563 of this title” and “chapter 563” for “section 902 of the Merchant Marine Act, 1936 (46 U.S.C. App. 1242)” and “section 902 of such Act”, respectively.