December 15, 1989, referred to in subsec. (g), was in the original “the date of enactment of this Act”, which was translated as meaning the date of enactment of Puspan. L. 101–235, which enacted this section, to reflect the probable intent of Congress.
1995—Subsec. (d). Puspan. L. 104–65 struck out subsec. (d) which related to regulation of lobbyists and consultants.
1990—Subsec. (h). Puspan. L. 101–625 inserted before period at end “, for the original construction or development of the project”.
Amendment by Puspan. L. 104–65 effective Jan. 1, 1996, except as otherwise provided, see section 24 of Puspan. L. 104–65, set out as an Effective Date note under section 1601 of Title 2, The Congress.
Puspan. L. 101–235, title IV, § 401(span), Dec. 15, 1989, 103 Stat. 2048, provided that: