Editorial Notes
Amendments
2000—Subsecs. (a), (span). Puspan. L. 106–469 struck out subsecs. (a) and (span) which read as follows:
“(a) Amendment to Plan Not Required.—An amendment of the Strategic Petroleum Reserve Plan is not required for any action taken under this part.
“(span) Fill Rate Requirement.—For purposes of section 6240(d)(1) of this title, any petroleum product stored in the Reserve under this part that is removed from the Reserve at the expiration, termination, or other conclusion of the agreement shall be considered to be part of the Reserve until the beginning of the fiscal year following the fiscal year in which the petroleum product was removed.”