View all text of Subchapter III [§ 2251 - § 2255a]
§ 2255. Inland waterways riverbank stabilization
(a) In generalNot later than 1 year after June 10, 2014, and biennially thereafter, the Secretary shall conduct a study to determine the feasibility of—
(1) carrying out projects for the inland and intracoastal waterways for purposes of—
(A) flood damage reduction;
(B) emergency streambank and shoreline protection; and
(C) prevention and mitigation of shore damages attributable to navigation improvements; and
(2) modifying projects for the inland and intracoastal waterways for the purpose of improving the quality of the environment.
(b) RecommendationsIn conducting the study, the Secretary shall develop specific project recommendations and prioritize those recommendations based on—
(1) the extent of damage and land loss resulting from riverbank erosion;
(2) the rate of erosion;
(3) the significant threat of future flood risk to public property, public infrastructure, or public safety;
(4) the destruction of natural resources or habitats; and
(5) the potential cost savings for maintenance of the channel.
(c) DispositionThe Secretary may carry out any project identified in the study conducted pursuant to subsection (a) in accordance with the criteria for projects carried out under one of the following authorities:
(1)Section 701r of this title.
(2)Section 701s of this title.
(3)Section 426i of this title.
(4)Section 2309a of this title.
(d) Annual report
(Pub. L. 113–121, title II, § 2009, June 10, 2014, 128 Stat. 1269.)