1 So in original. Probably should be followed by “in”.
this subsection, the permit shall not be issued until the applicant submits proof that such violation has been corrected or is in the process of being corrected to the satisfaction of the regulatory authority, department, or agency which has jurisdiction over such violation and no permit shall be issued to an applicant after a finding by the regulatory authority, after opportunity for hearing, that the applicant, or the operator specified in the application, controls or has controlled mining operations with a demonstrated pattern of willful violations of this chapter of such nature and duration with such resulting irreparable damage to the environment as to indicate an intent not to comply with the provisions of this chapter.
2 So in original. Probably should be “of the”.
Interior with the concurrence of the Secretary of Agriculture, grant a permit to mine on prime farmland if the regulatory authority finds in writing that the operator has the technological capability to restore such mined area, within a reasonable time, to equivalent or higher levels of yield as non-mined prime farmland in the surrounding area under equivalent levels of management and can meet the soil reconstruction standards in
Editorial Notes
Amendments

2006—Subsec. (e). Puspan. L. 109–432 struck out at end “The authority of this subsection and section 1265(span)(20)(B) of this title shall terminate on September 30, 2004.”

1992—Subsec. (e). Puspan. L. 102–486 added subsec. (e).