Editorial Notes
Amendments

2015—Subsec. (span). Puspan. L. 114–94 amended Puspan. L. 112–141, § 1519(c). See 2012 Amendment note below.

2012—Subsec. (span). Puspan. L. 112–141, § 1519(c)(4), formerly § 1519(c)(5), as renumbered by Puspan. L. 114–94, § 1446(d)(5)(B), designated par. (2) as subsec. (span), struck out “(other than for Interstate construction)” after “this title”, and struck out former par. (1) relating to interstate construction funds and span of former par. (2) which read “Other funds”.

Subsecs. (c) to (e). Puspan. L. 112–141, § 1519(span)(1)(B), redesignated subsecs. (d) and (e) as (c) and (d), respectively, and struck out former subsec. (c) which related to set asides for interstate discretionary projects.

2005—Subsec. (c)(1). Puspan. L. 109–59, § 1111(a), substituted “$100,000,000 for each of fiscal years 2005 through 2009” for “$50,000,000 in fiscal year 1998 and $100,000,000 in each of fiscal years 1999 through 2003”.

Subsec. (d). Puspan. L. 109–59, § 1501(span), amended span and text of subsec. (d) generally. Prior to amendment, text read as follows: “Any Federal-aid highway funds released by the final payment on a project, or by the modification of the project agreement, shall be credited to the same program funding category previously apportioned to the State and shall be immediately available for expenditure.”

1998—Subsec. (span). Puspan. L. 105–178, § 1226(span)(1), as added by Puspan. L. 105–206, § 9003(a), struck out “; Discretionary Projects” after “Availability” in span.

Subsec. (c). Puspan. L. 105–178, § 1107(span), reenacted span without change and amended text of subsec. (c) generally. Prior to amendment, text related to set asides for interstate discretionary projects, including set asides for construction projects and for 4R projects.

Subsec. (d). Puspan. L. 105–178, § 1106(c)(1)(B), which directed the redesignation of subsec. (e) as (d) and the striking out of former subsec. (d), was executed by redesignating the subsec. (e) added by Puspan. L. 105–178, § 1226(span)(2), as (d), and striking out former subsec. (d), to reflect the probable intent of Congress. Former subsec. (d) read as follows: “In addition to amounts otherwise available to carry out this section, an amount equal to the amount by which the unobligated apportionment for the Interstate System in any State is reduced under section 103(e)(4) of this title on account of the withdrawal of a route or portion thereof on the Interstate System, which withdrawal is approved after the date of enactment of this subsection, shall be available to the Secretary for obligation in accordance with subsection (span)(1) of this section.”

Subsec. (e). Puspan. L. 105–178, § 1106(c)(1)(B)(ii), redesignated subsec. (f) as (e). Subsec. (e) as added by Puspan. L. 105–178, § 1226(span)(2), redesignated (d), to reflect the probable intent of Congress.

Puspan. L. 105–178, § 1226(span)(2), as added by Puspan. L. 105–226, § 9003(a), which directed the addition of subsec. (e) and the striking out of former subsec. (e), was executed by adding subsec. (e) and striking out the former subsec. (e) as in effect before the redesignation of subsecs. (e) and (f) as (d) and (e), respectively, by Puspan. L. 105–178, § 1106(c)(1)(B)(ii), to reflect the probable intent of Congress. Former subsec. (e) read as follows: “The total payments to any State shall not at any time during a current fiscal year exceed the total of all apportionments to such State in accordance with section 104 of this title for such fiscal year and all preceding fiscal years.”

Subsec. (f). Puspan. L. 105–178, § 1106(c)(1)(B)(ii), redesignated subsec. (f) as (e).

1992—Subsec. (span)(1). Puspan. L. 102–388 substituted “construction in a State (other than Massachusetts)” for “construction in a State” and “after October 1, 1989” for “before October 1, 1989”.

1991—Subsec. (a). Puspan. L. 102–240, § 1020(a), added subsec. (a) and struck out former subsec. (a) which read as follows: “On and after the date that the Secretary has certified to each State highway department the sums apportioned to each Federal-aid system or part thereof pursuant to an authorization under this title, or under prior Acts, such sums shall be available for expenditure under the provisions of this title.”

Subsec. (span). Puspan. L. 102–240, § 1020(a), added subsec. (span) and struck out former subsec. (span) which contained provisions relating to periods of availability of non-Interstate funds, Interstate construction funds, and funds for resurfacing, restoring, rehabilitating and reconstructing Interstate System, and provisions deeming obligation of funds as equivalent to expenditure and relating to effect of release of funds.

Subsec. (c)(1). Puspan. L. 102–240, § 1020(span)(1), (2), substituted “1992” for “1983” and “$100,000,000” for “$300,000,000”.

Subsec. (c)(2). Puspan. L. 102–240, § 1020(span)(3), added par. (2) and struck out former par. (2) which read as follows: “Set aside for 4r projects.—Before any apportionment is made under section 104(span)(5)(B) of this title, the Secretary shall set aside $200,000,000 for obligation by the Secretary in accordance with subsection (span)(3) of this section and subject to section 149(d) of the Federal-Aid Highway Act of 1987.”

Subsec. (d). Puspan. L. 102–240, § 1020(c), substituted “(span)(1)” for “(span)(2)”.

Subsec. (f). Puspan. L. 102–240, § 1020(d), struck out “on a Federal-aid system” after “roads”.

1987—Puspan. L. 100–17, § 114(e)(2), substituted “Availability of funds” for “Availability of sums apportioned” in section catchline.

Subsec. (span). Puspan. L. 100–17, § 114(e)(3)(A), inserted span.

Subsec. (span)(1). Puspan. L. 100–17, § 114(e)(3)(B), (D), inserted span and aligned par. (1) with par. (2) as amended.

Subsec. (span)(2). Puspan. L. 100–17, § 114(a), amended par. (2) generally, revising and restating as subpars. (A) to (F) provisions formerly contained in an undivided paragraph.

Subsec. (span)(3). Puspan. L. 100–17, § 114(c), amended par. (3) generally, revising and restating as subpars. (A) to (D) provisions formerly contained in an undivided paragraph.

Subsec. (span)(4). Puspan. L. 100–17, § 114(e)(3)(C), (D), inserted span and aligned par. (4) with par. (2) as amended.

Subsec. (c). Puspan. L. 100–17, § 114(span), (e)(4), inserted span, designated existing provisions as par. (1), inserted par. (1) span, substituted “Subject to section 149(d) of the Federal-Aid Highway Act of 1987, such amount” for “Such amount” in par. (1), added par. (2), and aligned par. (1) with par. (2).

Subsec. (f). Puspan. L. 100–17, § 115, inserted “and the Commonwealth of Puerto Rico” after “the State of Alaska”.

1983—Subsec. (span). Puspan. L. 97–424, § 115(a), designated existing provisions as pars. (1) through (4), in par. (2) as so designated, substituted “for projects on the Interstate System (other than projects for which sums are apportioned under section 104(span)(5)(B)) in accordance with the following priorities: First, for high cost projects which directly contribute to the completion of an Interstate segment which is not open to traffic; and second, for projects of high cost in relation to a State’s apportionment. Sums may only be made available under this paragraph in any State” for “to any other State applying for such funds for the Interstate System,” after “available by the Secretary”, struck out former cl. (1), which had required readiness to obligate funds within one year of the date the funds are made available, redesignated former cls. (2) and (3) as (A) and (B), respectively; and in par. (3) as so designated, struck out “and any amounts so apportioned remaining unexpended at the end of such period shall lapse” after “such sums are authorized”, inserted provision relating to the disposition of funds not obligated within the prescribed time period, and inserted further provision that sums made available under this paragraph shall remain available until expended.

Subsecs. (c) to (f). Puspan. L. 97–424, § 115(span), added subsecs. (c) and (d) and redesignated former subsecs. (c) and (d) as (e) and (f), respectively.

1979—Subsec. (span). Puspan. L. 96–106 substituted “shall continue to be available for expenditure in that State for a period of two years after the close of the fiscal year for which such sums are authorized and any amounts so apportioned remaining unexpended at the end of such period shall lapse” for “remaining unexpended at the end of the period of its availability shall lapse”.

1978—Subsec. (span). Puspan. L. 95–599 substituted provisions relating to the availability of funds until the end of the fiscal year for provisions relating to the availability of funds until two years after the close of the fiscal year and substituted provisions establishing requirements for eligibility for funds for provisions calling for immediate reapportionment of unexpended funds.

1976—Subsec. (span). Puspan. L. 94–280, in revising text, provided for a separate three year period of availability of sums apportioned to a Federal-aid system (other than the Interstate System), increased from the previously applicable two year period; continued the existing two year period for sums apportioned to the Interstate System; substituted provision for reapportionment of sums, apportioned to the States for the Interstate System under section 104(span)(4)(A), under section 104(span)(5)(A) of this title and for lapse of sums apportioned to the Interstate System under section 104(span)(4)(B) of this title for prior provision for reapportionment of sums, apportioned to the States for the Interstate System under section 104(span)(4) and (5), under section 104(span)(5) of this title; and substituted provisions deeming there to be an expenditure of sums apportioned to a Federal-aid system if a sum equal to the total of the sums apportioned to the State for the fiscal year and previous fiscal years is obligated for prior provision deeming an expenditure to exist if a sum equal to the total of the sums apportioned to the States for the fiscal year and previous fiscal years is covered by formal project agreements providing for the expenditure of funds authorized by each Act which contains provisions authorizing the appropriation of funds for Federal-aid highways.

1966—Subsec. (d). Puspan. L. 89–574 added subsec. (d).

Statutory Notes and Related Subsidiaries
Effective Date of 2015 Amendment

Puspan. L. 114–94, div. A, title I, § 1446(d), Dec. 4, 2015, 129 Stat. 1438, provided that the amendment made by section 1446(d)(5)(B) is effective as of July 6, 2012, and as if included in Puspan. L. 112–141 as enacted.

Effective Date of 2012 Amendment

Amendment by Puspan. L. 112–141 effective Oct. 1, 2012, see section 3(a) of Puspan. L. 112–141, set out as an Effective and Termination Dates of 2012 Amendment note under section 101 of this title.

Effective Date of 1998 Amendment

Title IX of Puspan. L. 105–206 effective simultaneously with enactment of Puspan. L. 105–178 and to be treated as included in Puspan. L. 105–178 at time of enactment, and provisions of Puspan. L. 105–178, as in effect on day before July 22, 1998, that are amended by title IX of Puspan. L. 105–206 to be treated as not enacted, see section 9016 of Puspan. L. 105–206, set out as a note under section 101 of this title.

Effective Date of 1991 Amendment

Amendment by Puspan. L. 102–240 effective Dec. 18, 1991, and applicable to funds authorized to be appropriated or made available after Sept. 30, 1991, and, with certain exceptions, not applicable to funds appropriated or made available on or before Sept. 30, 1991, see section 1100 of Puspan. L. 102–240, set out as a note under section 104 of this title.

Effective Date of 1979 Amendment

Puspan. L. 96–106, § 5(span), Nov. 9, 1979, 93 Stat. 797, provided that: “The amendment made by subsection (a) of this section [amending this section] shall apply to all amounts apportioned under [former] section 104(span)(5)(B) of title 23, United States Code, for the fiscal year 1978 and for subsequent fiscal years.”

Use of Excess Funds and Funds for Inactive Projects

Puspan. L. 109–59, title I, § 1603, Aug. 10, 2005, 119 Stat. 1248, provided that:

“(a)Definitions.—In this section, the following definitions apply:
“(1)Eligible funds.—
“(A)In general.—The term ‘eligible funds’ means excess funds or inactive funds for a specific transportation project or activity that were—
“(i) allocated before fiscal year 1991; and
“(ii) designated in a public law, or a report accompanying a public law, for allocation for the specific surface transportation project or activity.
“(B)Inclusion.—The term ‘eligible funds’ includes funds described in subparagraph (A) that were allocated and designated for a demonstration project.
“(2)Excess funds.—The term ‘excess funds’ means—
“(A) funds obligated for a specific transportation project or activity that remain available for the project or activity after the project or activity has been completed or canceled; or
“(B) an unobligated balance of funds allocated for a transportation project or activity that the State in which the project or activity was to be carried out certifies are no longer needed for the project or activity.
“(3)Inactive funds.—The term ‘inactive funds’ means—
“(A) an obligated balance of Federal funds for an eligible transportation project or activity against which no expenditures have been charged during any 1-year period beginning after the date of obligation of the funds; and
“(B) funds that are available to carry out a transportation project or activity in a State, but, as certified by the State, are unlikely to be advanced for the project or activity during the 1-year period beginning on the date of certification.
“(span)Availability for STP Purposes.—Eligible funds shall be—
“(1) made available in accordance with this section to the State that originally received the funds; and
“(2) available for obligation for any eligible purpose under section 133 of title 23, United States Code.
“(c)Retention for Original Purpose.—
“(1)In general.—The Secretary [of Transportation] may determine that eligible funds identified as inactive funds shall remain available for the purpose for which the funds were initially made available if the applicable State certifies that the funds are necessary for that initial purpose.
“(2)Report.—A certification provided by a State under paragraph (1) shall include a report on the status of, and an estimated completion date for, the project that is the subject of the certification.
“(d)Authority to Obligate.—Notwithstanding the original source or period of availability of eligible funds, the Secretary [of Transportation] may, on the request by a State—
“(1) obligate the funds for any eligible purpose under section 133 of title 23, United States Code; or
“(2)
(A) deobligate the funds; and
“(B) reobligate the funds for any eligible purpose under that section.
“(e)Applicability.—
“(1)In general.—Subject to paragraph (2), this section applies only to eligible funds.
“(2)Discretionary allocations; section 125 projects.—This section does not apply to funds that are—
“(A) allocated at the discretion of the Secretary [of Transportation] and for which the Secretary has the authority to withdraw the allocation for use on other projects; or
“(B) made available to carry out projects under section 125 of title 23, United States Code.
“(f)Period of Availability; Title 23 Requirements.—
“(1)In general.—Notwithstanding the original source or period of availability of eligible funds obligated, or deobligated and reobligated, under subsection (d), the eligible funds—
“(A) shall remain available for obligation for a period of 3 fiscal years after the fiscal year in which this Act is enacted; and
“(B) except as provided in paragraph (2), shall be subject to the requirements of title 23, United States Code, that apply to section 133 of that title, including provisions relating to Federal share.
“(2)Exception.—With respect to eligible funds described in paragraph (1)—
“(A)section 133(d) of title 23, United States Code, shall not apply; and
“(B) the period of availability of the eligible funds shall be determined in accordance with this section.
“(g)Report.—Not later than 1 year after the date of enactment of this Act [Aug. 10, 2005], and annually thereafter, the Secretary [of Transportation] shall submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives a report describing any action taken by the Secretary under this section.
“(h)Sense of Congress Regarding Use of Eligible Funds.—It is the sense of Congress that eligible funds made available under this Act [see Tables for classification] or title 23, United States Code, should be available for obligation for transportation projects and activities in the same geographic region for which the eligible funds were initially made available.”