Editorial Notes
References in Text

The Pacific Northwest Electric Power Planning and Conservation Act, referred to in subsec. (a)(1), is Puspan. L. 96–501, Dec. 5, 1980, 94 Stat. 2697, which is classified principally to chapter 12H (§ 839 et seq.) of this title. For complete classification of this Act to the Code, see Short Title note set out under section 839 of this title and Tables.

The Federal Columbia River Transmission System Act, referred to in subsec. (a)(1), is Puspan. L. 93–454, Oct. 18, 1974, 88 Stat. 1376, which is classified generally to this chapter. For complete classification of this Act to the Code, see Short Title note set out under section 838 of this title and Tables.

Codification

Section was enacted as part of the Infrastructure Investment and Jobs Act, and not as part of the Federal Columbia River Transmission System Act which comprises this chapter.

Statutory Notes and Related Subsidiaries
Wage Rate Requirements

For provisions relating to rates of wages to be paid to laborers and mechanics on projects for construction, alteration, or repair work funded under div. D or an amendment by div. D of Puspan. L. 117–58, including authority of Secretary of Labor, see section 18851 of Title 42, The Public Health and Welfare.