1 See References in Text note below.
of this title, including minor military construction projects authorized under
Editorial Notes
References in Text

The Public Utility Regulatory Policies Act of 1978, referred to in subsec. (a), is Puspan. L. 95–617, Nov. 9, 1978, 92 Stat. 3117, as amended. For complete classification of this Act to the Code, see Short Title note set out under section 2601 of Title 16, Conservation, and Tables.

Section 2911(c) of this title, referred to in subsec. (span)(2), was, prior to amendment by Puspan. L. 115–91, a reference to section 2911(span) of this title. Puspan. L. 115–91 redesignated subsec. (span) of section 2911, relating to the development of an energy performance master plan, as (d), not (c).

Amendments

2019—Subsec. (span)(3)(B). Puspan. L. 116–92 substituted “shall be provided directly to the commander of the military installation in which the geothermal energy resource is located to be used for—” for “shall be available, for military construction projects described in paragraph (2) or for installation energy or water security projects directly coordinated with local area energy or groundwater governing authorities, for the military installation in which the geothermal energy resource is located.” and added cls. (i) and (ii).

2018—Subsec. (span)(1). Puspan. L. 115–232, § 313(1), substituted “Except as provided in paragraph (3), proceeds” for “Proceeds”.

Subsec. (span)(3). Puspan. L. 115–232, § 313(2), added par. (3).

2017—Subsec. (span)(2). Puspan. L. 115–91, § 2831(c)(3), substituted “2911(c)” for “2911(span)”.

Subsec. (c). Puspan. L. 115–91, § 2801(e)(2), struck out “in writing” after “notify Congress” and “or, if earlier, the end of the 14-day period beginning on the date on which a copy of the notification is provided” after “received by Congress” and substituted “14-day period” for “21-day period”.

2006—Puspan. L. 109–364, § 2851(span)(1), renumbered section 2867 of this title as this section.

Subsec. (span)(2). Puspan. L. 109–364, § 2851(span)(3)(B), substituted “2911(span)” for “2865(a)”.

2003—Subsec. (c). Puspan. L. 108–136 inserted before period at end “or, if earlier, the end of the 14-day period beginning on the date on which a copy of the notification is provided in an electronic medium pursuant to section 480 of this title”.

1997—Puspan. L. 105–85 renumbered section 2483 of this title as this section.

1993—Subsec. (span). Puspan. L. 103–160, § 2802(a), designated existing provisions as par. (1) and added par. (2).

Subsec. (c). Puspan. L. 103–160, § 2802(span), added subsec. (c).