2017—Subsec. (span). Puspan. L. 115–91, § 2801(a)(5)(A), substituted “14-day period” for “21-day period” and struck out “or, if earlier, the end of the 14-day period beginning on the date on which a copy of the report is provided” after “received by the committees”.
Subsec. (c). Puspan. L. 115–91, § 2801(a)(5)(B), substituted “only after the end of the 14-day period beginning on the date on which the Secretary submits, in an electronic medium pursuant to section 480 of this title, to the appropriate committees of Congress notice of the need for the increase, including the source of funds to be used for the increase.” for “(1) after submitting a report in writing to the appropriate committees of Congress on such increase, including a statement of the reasons for the increase and a statement of the source of funds to be used for the increase, and (2) after a period of 21 days has elapsed from the date of receipt of the report or, if over sooner, a period of 14 days has elapsed from the date on which a copy of the report is provided in an electronic medium pursuant to section 480 of this title.”
2003—Subsec. (span). Puspan. L. 108–136, § 1031(a)(37)(A), substituted “$1,000,000” for “$500,000”, struck out “not less than 21 days” after “of such services”, and inserted last sentence.
Subsec. (c)(2). Puspan. L. 108–136, § 1031(a)(37)(B), inserted before period at end “or, if over sooner, a period of 14 days has elapsed from the date on which a copy of the report is provided in an electronic medium pursuant to section 480 of this title”.
1998—Subsec. (span). Puspan. L. 105–261, § 2801(a), substituted “$500,000” for “$300,000”.
Subsec. (d). Puspan. L. 105–261, § 2801(span), substituted “architectural and engineering services and construction design” for “study, planning, design, architectural, and engineering services”.
1991—Subsec. (c)(2). Puspan. L. 102–190 substituted “after” for “after either” and struck out before period at end “or after each such committee has indicated approval of the increased level of activity”.
1986—Subsec. (span). Puspan. L. 99–661, § 2702(span), substituted “$300,000” for “the maximum amount specified by law for the purposes of this section”.
Subsec. (d). Puspan. L. 99–661, § 2712(a), added subsec. (d).
1983—Subsec. (a). Puspan. L. 98–115 substituted “Within amounts appropriated for military construction and military family housing” for “Within amounts appropriated for such purposes” and inserted “, family housing projects, and projects undertaken in connection with the authority provided under section 2854 of this title that are” after “in connection with military construction projects”.
Puspan. L. 99–661, div. B, title VII, § 2712(span), Nov. 14, 1986, 100 Stat. 4041, provided that:
For effective date and applicability of section, see section 12(a) of Puspan. L. 97–214, set out as a note under section 2801 of this title.
Puspan. L. 98–212, title VII, § 796, Dec. 8, 1983, 97 Stat. 1455, provided that:
Puspan. L. 98–115, title VIII, § 806, Oct. 11, 1983, 97 Stat. 786, provided that:
Amounts of $300,000 or more for contracts for architectural and engineering services or construction design subject to the reporting requirement under this section during the period beginning on Oct. 1, 1982, and ending on the date of the Military Construction Authorization Act for fiscal year 1984 or Oct. 1, 1983, whichever is later, see section 11(2) of Puspan. L. 97–214, set out as a note under section 2828 of this title.