Subpart L. Subpart L—Operations
- § 192.601 - Scope.
- § 192.603 - General provisions.
- § 192.605 - Procedural manual for operations, maintenance, and emergencies.
- § 192.607 - Verification of Pipeline Material Properties and Attributes: Onshore steel transmission pipelines.
- § 192.609 - Change in class location: Required study.
- § 192.610 - Change in class location: Change in valve spacing.
- § 192.611 - Change in class location: Confirmation or revision of maximum allowable operating pressure.
- § 192.612 - Underwater inspection and reburial of pipelines in the Gulf of Mexico and its inlets.
- § 192.613 - Continuing surveillance.
- § 192.614 - Damage prevention program.
- § 192.615 - Emergency plans.
- § 192.616 - Public awareness.
- § 192.617 - Investigation of failures and incidents.
- § 192.619 - Maximum allowable operating pressure: Steel or plastic pipelines.
- § 192.620 - Alternative maximum allowable operating pressure for certain steel pipelines.
- § 192.621 - Maximum allowable operating pressure: High-pressure distribution systems.
- § 192.623 - Maximum and minimum allowable operating pressure; Low-pressure distribution systems.
- § 192.624 - Maximum allowable operating pressure reconfirmation: Onshore steel transmission pipelines.
- § 192.625 - Odorization of gas.
- § 192.627 - Tapping pipelines under pressure.
- § 192.629 - Purging of pipelines.
- § 192.631 - Control room management.
- § 192.632 - Engineering Critical Assessment for Maximum Allowable Operating Pressure Reconfirmation: Onshore steel transmission pipelines.
- § 192.634 - Transmission lines: Onshore valve shut-off for rupture mitigation.
- § 192.635 - Notification of potential rupture.
- § 192.636 - Transmission lines: Response to a rupture; capabilities of rupture-mitigation valves (RMVs) or alternative equivalent technologies.