View all text of Subpart 4.10 [4.1000 - 4.1008]

4.1006 - 4.1006 Modifications.

(a) When a new item (such as an increased quantity) is added to the procurement instrument, assign a new line item number.

(b) If the modification relates to existing line items, the modification shall refer to those items.