View all text of Subpart 1342.7 [1342.703 - 1342.703-2]
1342.703-2 - 1342.703-2 Certificate of indirect costs.
The designee authorized to waive the requirement for contractor certification of proposed final indirect cost rates is set forth in CAM 1301.70.