View all text of Subpart 112.30 [§ 112.30-1 - § 112.30-10]
§ 112.30-5 - Transfer of emergency loads.
If there is a reduction of potential of the normal source by 15 to 40 percent, the emergency loads under § 112.15-5 must transfer automatically from the normal source to the emergency power source.