Subpart MMMM. Subpart MMMM—Emission Guidelines and Compliance Times for Existing Sewage Sludge Incineration Units
Introduction
- SECTION § 60.5000 - What is the purpose of this subpart?
- SECTION § 60.5005 - Am I affected by this subpart?
- SECTION § 60.5010 - Is a state plan required for all states?
- SECTION § 60.5015 - What must I include in my state plan?
- SECTION § 60.5020 - Is there an approval process for my state plan?
- SECTION § 60.5025 - What if my state plan is not approvable?
- SECTION § 60.5030 - Is there an approval process for a negative declaration letter?
- SECTION § 60.5035 - What compliance schedule must I include in my state plan?
- SECTION § 60.5040 - Are there any state plan requirements for this subpart that apply instead of the requirements specified in subpart B?
- SECTION § 60.5045 - In lieu of a state plan submittal, are there other acceptable option(s) for a state to meet its section 111(d)/129 (b)(2) obligations?
- SECTION § 60.5050 - What authorities will not be delegated to state, local, or tribal agencies?
- SECTION § 60.5055 - Does this subpart directly affect SSI unit owners and operators in my state?
Applicability of State Plans
Use of Model Rule
Model Rule—Increments of Progress
- SECTION § 60.5085 - What are my requirements for meeting increments of progress and achieving final compliance?
- SECTION § 60.5090 - When must I complete each increment of progress?
- SECTION § 60.5095 - What must I include in the notifications of achievement of increments of progress?
- SECTION § 60.5100 - When must I submit the notifications of achievement of increments of progress?
- SECTION § 60.5105 - What if I do not meet an increment of progress?
- SECTION § 60.5110 - How do I comply with the increment of progress for submittal of a control plan?
- SECTION § 60.5115 - How do I comply with the increment of progress for achieving final compliance?
- SECTION § 60.5120 - What must I do if I close my SSI unit and then restart it?
- SECTION § 60.5125 - What must I do if I plan to permanently close my SSI unit and not restart it?
Model Rule—Operator Training and Qualification
- SECTION § 60.5130 - What are the operator training and qualification requirements?
- SECTION § 60.5135 - When must the operator training course be completed?
- SECTION § 60.5140 - How do I obtain my operator qualification?
- SECTION § 60.5145 - How do I maintain my operator qualification?
- SECTION § 60.5150 - How do I renew my lapsed operator qualification?
- SECTION § 60.5155 - What if all the qualified operators are temporarily not accessible?
- SECTION § 60.5160 - What site-specific documentation is required and how often must it be reviewed by qualified operators and plant personnel?
Model Rule—Emission Limits, Emission Standards, and Operating Limits and Requirements
- SECTION § 60.5165 - What emission limits and standards must I meet and by when?
- SECTION § 60.5170 - What operating limits and requirements must I meet and by when?
- SECTION § 60.5175 - How do I establish operating limits if I do not use a wet scrubber, fabric filter, electrostatic precipitator, activated carbon injection, or afterburner, or if I limit emissions in some other manner, to comply with the emission limits?
- SECTION § 60.5180 - Do the emission limits, emission standards, and operating limits apply during periods of startup, shutdown, and malfunction?
- SECTION § 60.5181 - How do I establish an affirmative defense for exceedance of an emission limit or standard during malfunction?
Model Rule—Initial Compliance Requirements
- SECTION § 60.5185 - How and when do I demonstrate initial compliance with the emission limits and standards?
- SECTION § 60.5190 - How do I establish my operating limits?
- SECTION § 60.5195 - By what date must I conduct the initial air pollution control device inspection and make any necessary repairs?
- SECTION § 60.5200 - How do I develop a site-specific monitoring plan for my continuous monitoring, bag leak detection, and ash handling systems, and by what date must I conduct an initial performance evaluation?
Model Rule—Continuous Compliance Requirements
- SECTION § 60.5205 - How and when do I demonstrate continuous compliance with the emission limits and standards?
- SECTION § 60.5210 - How do I demonstrate continuous compliance with my operating limits?
- SECTION § 60.5215 - By what date must I conduct annual air pollution control device inspections and make any necessary repairs?
Model Rule—Performance Testing, Monitoring, and Calibration Requirements
Model Rule—Recordkeeping and Reporting
Model Rule—Title V Operating Permits
Model Rule-Definitions
APPENDIX
- Table 1 to Subpart MMMM of Part 60—Model Rule—Increments of Progress and Compliance Schedules for Existing Sewage Sludge Incineration Units
- Table 2 to Subpart MMMM of Part 60—Model Rule—Emission Limits and Standards for Existing Fluidized Bed Sewage Sludge Incineration Units
- Table 3 to Subpart MMMM of Part 60—Model Rule—Emission Limits and Standards for Existing Multiple Hearth Sewage Sludge Incineration Units
- Table 4 to Subpart MMMM of Part 60—Model Rule—Operating Parameters for Existing Sewage Sludge Incineration Units a
- Table 5 to Subpart MMMM of Part 60—Model Rule—Toxic Equivalency Factors
- Table 6 to Subpart MMMM of Part 60—Model Rule—Summary of Reporting Requirements for Existing Sewage Sludge Incineration Units a