§ 60.4405 - How do I perform the initial performance test if I have chosen to install a NOX-diluent CEMS?
If you elect to install and certify a NO
(a) Perform a minimum of nine RATA reference method runs, with a minimum time per run of 21 minutes, at a single load level, within plus or minus 25 percent of 100 percent of peak load. The ambient temperature must be greater than 0 °F during the RATA runs.
(b) For each RATA run, concurrently measure the heat input to the unit using a fuel flow meter (or flow meters) and measure the electrical and thermal output from the unit.
(c) Use the test data both to demonstrate compliance with the applicable NO
(d) Compliance with the applicable emission limit in § 60.4320 is achieved if the arithmetic average of all of the NO