- Table 5 to Subpart DDDD of Part 60—Model Rule—Summary of Reporting Requirements 1
Report | Due date | Contents | Reference | Waste Management Plan | No later than the date specified in table 1 for submittal of the final control plan | • Waste management plan | § 60.2755. | Initial Test Report | No later than 60 days following the initial performance test | • Complete test report for the initial performance test
• The values for the site-specific operating limits • Installation of bag leak detection systems for fabric filters | § 60.2760. | Annual report | No later than 12 months following the submission of the initial test report. Subsequent reports are to be submitted no more than 12 months following the previous report | • Name and address
• Statement and signature by responsible official • Date of report • Values for the operating limits • Highest recorded 3-hour average and the lowest 3-hour average, as applicable, (or 30-day average, if applicable) for each operating parameter recorded for the calendar year being reported • If a performance test was conducted during the reporting period, the results of the test • If a performance test was not conducted during the reporting period, a statement that the requirements of § 60.2720(a) were met • Documentation of periods when all qualified CISWI operators were unavailable for more than 8 hours but less than 2 weeks • If you are conducting performance tests once every 3 years consistent with § 60.2720(a), the date of the last 2 performance tests, a comparison of the emission level you achieved in the last 2 performance tests to the 75 percent emission limit threshold required in § 60.2720(a) and a statement as to whether there have been any operational changes since the last performance test that could increase emissions • Any malfunction, deviation, or continuous monitoring system out of control periods information as specified in § 60.2770(k) through (o) • Fuel input information for energy recovery unit subcategory verification as specified in § 60.2770(p) | §§ 60.2765 and 60.2770. | Emission limitation or operating limit deviation report | By August 1 of that year for data collected during the first half of the calendar year. By February 1 of the following year for data collected during the second half of the calendar year | • Dates and times of deviation
• Averaged and recorded data for those dates • Duration and causes of each deviation and the corrective actions taken • Copy of operating limit monitoring data and any test reports • Dates, times and causes for monitor downtime incidents | § 60.2775 and 60.2780. | Qualified Operator Deviation Notification | Within 10 days of deviation | • Statement of cause of deviation
• Description of efforts to have an accessible qualified operator • The date a qualified operator will be accessible | § 60.2785(a)(1). | Qualified Operator Deviation Status Report | Every 4 weeks following deviation | • Description of efforts to have an accessible qualified operator
• The date a qualified operator will be accessible • Request for approval to continue operation | § 60.2785(a)(2). | Qualified Operator Deviation Notification of Resumed Operation | Prior to resuming operation | • Notification that you are resuming operation | § 60.2785(b). |
---|
1 This table is only a summary, see the referenced sections of the rule for the complete requirements.