- Figure F-1 to Subpart F of Part 53—Designation Testing Checklist
DESIGNATION TESTING CHECKLIST FOR CLASS II
__________ __________ __________
Auditee Auditor signature Date
Compliance Status: Y = Yes N = No NA = Not applicable/Not available | Verification Comments (Includes documentation of who, what, where, when, why) (Doc. #, Rev. #, Rev. Date) | Verification | Verified by Direct Observation of Process or of Documented Evidence: Performance, Design or Application Spec. Corresponding to Sections of 40 CFR Part 53, Subparts E and F | Y | N | NA | Evaluation completed according to Subpart E § 53.50 to § 53.56 | Class II samplers that are also Class I (sequentialized) have passed the tests in § 53.57 | Evaluation of Physical Characteristics of Clean Sampler - One of these tests must be performed:
§ 53.62 - Full Wind Tunnel § 53.63 - Inlet Aspiration § 53.64 - Static Fractionator | Evaluation of Physical Characteristics of Loaded Sampler
§ 53.65 Loading Test One of the following tests must be performed for evaluation after loading: § 53.62, § 53.63, § 53.64 | Evaluation of the Volatile Characteristics of the Class II Sampler § 53.66 |
---|