View all text of Subpart CCC [§ 52.2770 - § 52.2782]
§ 52.2781 - Visibility protection.
(a) The requirements of section 169A of the Clean Air Act are not met, because the plan does not include approvable procedures for protection of visibility in mandatory Class I Federal areas.
(b)-(c) [Reserved]
(d) Regional Haze Plan for Virgin Islands National Park. The regional haze plan for the Virgin Islands consists of a Federal Implementation Plan entitled: “FEDERAL IMPLEMENTATION PLAN FOR REGIONAL HAZE FOR THE UNITED STATES VIRGIN ISLANDS.” The applicable requirements consist of:
(1) Applicability. This section addresses Clean Air Act requirements and EPA's rules to prevent and remedy future and existing man-made impairment of visibility in the mandatory Class I area of the Virgin Islands National Park through a Regional Haze Program. This section applies to the owner and operator of HOVENSA L.L.C. (HOVENSA), a petroleum refinery located on St. Croix, U.S. Virgin Islands.
(2) Definitions. Terms not defined below shall have the meaning given them in the Clean Air Act or EPA's regulations implementing the Clean Air Act. For purposes of this section: NO
Owner/operator means any person who owns, leases, operates, controls, or supervises a facility or source identified in paragraph (d)(1) of this section.
PM means particulate matter.
Process unit means any collection of structures and/or equipment that processes, assembles, applies, blends, or otherwise uses material inputs to produce or store an intermediate or a completed product. A single stationary source may contain more than one process unit, and a process unit may contain more than one emissions unit. For a petroleum refinery, there are several categories of process units that could include: Those that separate and/or distill petroleum feedstocks; those that change molecular structures; petroleum treating processes; auxiliary facilities, such as steam generators and hydrogen production units; and those that load, unload, blend or store intermediate or completed products.
SO
Startup means the setting in operation of an affected facility for any purpose.
(3) Reasonable Progress Measures. On June 7, 2011, EPA and HOVENSA entered into a Consent Decree (CD) in the U.S. District Court for the Virgin Islands to resolve alleged Clean Air Act violations at its St. Croix, Virgin Islands facility. The CD requires HOVENSA, among other things, to achieve emission limits and install new pollution controls pursuant to a schedule for compliance. The measures required by the CD reduce emissions of NO
(4) HOVENSA requirement for notification. HOVENSA must notify EPA 60 days in advance of startup and resumption of operation of refinery process units at the HOVENSA, St. Croix, Virgin Islands facility. HOVENSA shall submit such notice to the Director of the Clean Air and Sustainability Division, U.S. Environmental Protection Agency Region 2, 290 Broadway, 25th Floor, New York, New York, 10007-1866. HOVENSA's notification to EPA that it intends to startup refinery process units must include information regarding those emission units that will be operating, including unit design parameters such as heat input and hourly emissions, information on potential to emit limitations, pollution controls and control efficiencies, and schedules for compliance. EPA will revise the FIP as necessary, after public notice and comment, in accordance with regional haze requirements including the “reasonable progress” provisions in 40 CFR 51.308(d)(1). HOVENSA will be required to install any controls that are required by the revised FIP as expeditiously as practicable, but no later than 5 years after the effective date of the revised FIP.
(5) Best Available Retrofit Technology (BART) measures. Emissions limitations, the owners/operators subject to this section shall not emit or cause to be emitted SO
Table 1 to Paragraph (
Facility | BART unit | BART controls/limits | Control | SO (tons/year) | NO (tons/year) | PM
(tons/year) | HOVENSA | Boilers: | 1 (B-1151) | 330.1 | 450.6 | 40.6. | 3 (B-1153) | 330.1 | 450.6 | 40.6. | 4 (B-1154) | 322.5 | 443.5 | 39.7. | 5 (B-1155) | 484.9 | 676.9 | 60.7. | 6 (B-3301) | 330.8 | 435.3 | 40.6. | 7 (B-3302) | 330.8 | 435.3 | 40.6. | 8 (B-3303) | 640.1 | 559.8 | 78.6. | 9 (B-3304) | 640.1 | 559.8 | 78.6. | Turbines: | GT1 (G-1101E) | 135.5 | 805.7 | 12.2. | GT2 (G-1101F) | 135.5 | 805.7 | 12.2. | GT3 (G-1101G) | 135.5 | 805.7 | 12.2. | GT4 (G-3404) | 161.0 | 809.5 | 12.9. | GT5 (G-3405) | 161.0 | 766.5 | 12.9. | GT6 (G-3406) | 161.0 | 766.5 | 12.9. | GT7 (G-3407) | 161.0 | 766.5 | 12.9. | GT8 (G-3408) | 167.6 | 1002.1 | 15.1. | GT9 (G-3409) | Steam Injection for NO | 52.2 | 150.2 | 14.0. | Process Heaters: | H-101 | 155.5 | 232.5 | 19.3. | H-104 | 115.5 | 172.8 | 17.2. | H-200 | 8.1 | 16.0 | 1.2. | H-201 | 8.2 | 16.1 | 1.2. | H-202 | 26.6 | 146.5 | 4.0. | H-401A | 197.6 | 279.1 | 24.4. | H-401B | 197.6 | 279.1 | 24.4. | H-401C | 197.6 | 279.1 | 24.4. | H-1401A | 163.1 | 388.7 | 21.1. | H-1401B | 155.4 | 370.2 | 20.1. | H-1500 | 13.0 | 25.5 | 2.0. | H-1501 | 13.7 | 26.8 | 2.0. | H-160 | 29.6 | 163.0 | 4.4. | H-600 | 11.5 | 22.5 | 1.7. | H-601 | 7.8 | 15.2 | 1.2. | H-602 | 62.6 | 344.4 | 9.4. | H-603 | 17.2 | 33.7 | 2.6. | H-604 | 8.1 | 15.9 | 1.2. | H-605 | 3.4 | 6.6 | 0.5. | H-606 | 11.8 | 23.1 | 1.8. | H-800A | 9.4 | 18.4 | 1.4. | H-800B | 9.4 | 18.4 | 1.4. | H-801 | 22.0 | 121.1 | 3.3. | H-2101 | 116.4 | 283.2 | 15.1. | H-2102 | 112.7 | 274.1 | 14.6. | H-2201A | 13.4 | 26.3 | 2.0. | H-2201B | 13.4 | 26.3 | 2.0. | H-2202 | 26.1 | 143.7 | 3.9. | H-2400 | 7.2 | 14.2 | 1.1. | H-2401 | 24.1 | 132.5 | 3.6. | H-2501 | 44.5 | 244.5 | 6.7. | H-4502 | 32.5 | 178.9 | 4.9. | H-4503 | 30.8 | 169.6 | 4.6. | H-4504 | 27.6 | 151.9 | 4.1. | H-4505 | 23.9 | 131.3 | 3.6. | H-3101A | 356.7 | 507.1 | 48.1. | H-3101B | 356.7 | 507.1 | 48.1. | H-4101A | 356.7 | 507.1 | 48.1. | H-4101B | 356.7 | 507.1 | 48.1. | H-4401 | 29.4 | 161.5 | 4.4. | H-4402 | 28.0 | 153.8 | 4.2. | H-4451 | 83.4 | 458.7 | 12.5. | H-4452 | 54.3 | 298.6 | 8.1. | H-4453 | 54.3 | 298.6 | 8.1. | H-4454 | 16.9 | 33.1 | 2.5. | H-4455 | 30.3 | 166.6 | 4.5. | H-4201 | 367.7 | 448.1 | 44.9. | H-4202 | 355.7 | 433.6 | 43.4. | H-5401 | 29.4 | 161.5 | 4.4. | H-5402 | 28 | 153.8 | 4.2. | H-5451 | 83.4 | 458.7 | 12.5. | H-5452 | 54.3 | 298.6 | 8.1. | H-5453 | 54.3 | 298.6 | 8.1. | H-5454 | 16.9 | 33.1 | 2.5. | H-5455 | 30.3 | 166.6 | 4.5. | H-4601A | 13.4 | 26.3 | 2. | H-4601B | 13.4 | 26.3 | 2. | H-4602 | 26.1 | 143.7 | 3.9. | H-4301A | 14.6 | 28.7 | 2.2. | H-4301B | 14.6 | 28.7 | 2.2. | H-4302 | 26.7 | 147.1 | 4. | H-5301A | 14.6 | 28.7 | 2.2. | H-5301B | 14.6 | 28.7 | 2.2. | H-5302 | 26.7 | 147.1 | 4. | TGT unit No. 2 Beavo: | H-4761 & T-4761 | 2.0 | 4.0 | 1.0. | TGI units: | H-1032 | 1.6 | 3.1 | 0.2. | H-1042 | 3.3 | 6.5 | 0.5. | H-4745 | 900.0 | 28.0 | 3.0. | Compressors: | C-200A | Catalytic Converters for NO | 0.0 | 33.1 | 0.2. | C-200B | Catalytic Converters for NO | 0.0 | 33.1 | 0.2. | C-200C | Catalytic Converters for NO | 0.0 | 33.1 | 0.2. | C-1500A | 0.0 | 40.0 | 0.1. | C-1500B | 0.0 | 40.0 | 0.1. | C-1500C | 0.0 | 40.0 | 0.1. | C-2400A | Catalytic Converters for NOx and CO control | 0.0 | 19.4 | 0.3. | C-2400B | Catalytic Converters for NO | 0.0 | 19.4 | 0.3. | C-4601A | 0.0 | 380.6 | 0.9. | C-4601B | 0.0 | 380.6 | 0.9. | C-4601C | 0.0 | 380.6 | 0.9. | Flares: | #2 Flare (H-1105) | 150.0 | 237.0 | negligible. | #3 Flare (H-1104) | 150.0 | 237.0 | negligible. | #5 Flare (H-3351) | 150.0 | 237.0 | negligible. | #6 Flare (H-3352) | 150.0 | 237.0 | negligible. | #7 Flare (H-3301) | 150.0 | 237.0 | negligible. | Water Pumps: | PD-1602 | 1.9 | 40.6 | 2.9. | PD-1603 | 1.9 | 40.6 | 2.9. | PD-1604 | 1.9 | 40.6 | 2.9. | PD-1605 | 1.9 | 40.6 | 2.9. | PD-1620 | 1.3 | 27.0 | 1.9. |
---|