Appendix II - Appendix II to Part 1039—Steady-State Duty Cycles

(a) The following duty cycles apply for constant-speed engines:

(1) The following duty cycle applies for discrete-mode testing:

D2 mode number Engine speed Torque
(percent) 1
Weighting
factors
1Engine governed1000.05 2Engine governed750.25 3Engine governed500.30 4Engine governed250.30 5Engine governed100.10

1 The percent torque is relative to maximum test torque.

(2) The following duty cycle applies for ramped-modal testing:

RMC mode Time in mode
(seconds)
Engine speed Torque
(percent) 1 2
1a Steady-state53Engine governed100. 1b Transition20Engine governedLinear transition. 2a Steady-state101Engine governed10. 2b Transition20Engine governedLinear transition. 3a Steady-state277Engine governed75. 3b Transition20Engine governedLinear transition. 4a Steady-state339Engine governed25. 4b Transition20Engine governedLinear transition. 5 Steady-state350Engine governed50.

1 The percent torque is relative to maximum test torque.

2 Advance from one mode to the next within a 20-second transition phase. During the transition phase, command a linear progression from the torque setting of the current mode to the torque setting of the next mode.

(b) The following duty cycles apply for variable-speed engines with maximum engine power below 19 kW:

(1) The following duty cycle applies for discrete-mode testing:

G2 mode number Engine speed 1Torque
(percent) 2
Weighting
factors
1Maximum test speed1000.09 2Maximum test speed750.20 3Maximum test speed500.29 4Maximum test speed250.30 5Maximum test speed100.07 6Warm idle00.05

1 Speed terms are defined in 40 CFR part 1065.

2 The percent torque is relative to the maximum torque at the commanded test speed.

(2) The following duty cycle applies for ramped-modal testing:

RMC mode Time in mode
(seconds)
Engine speed 1 3Torque
(percent) 2 3
1a Steady-state41Warm idle0. 1b Transition20Linear transitionLinear transition. 2a Steady-state135Maximum test speed100. 2b Transition20Maximum test speedLinear transition. 3a Steady-state112Maximum test speed10. 3b Transition20Maximum test speedLinear transition. 4a Steady-state337Maximum test speed75. 4b Transition20Maximum test speedLinear transition. 5a Steady-state518Maximum test speed25. 5b Transition20Maximum test speedLinear transition. 6a Steady-state494Maximum test speed50. 6b Transition20Linear transitionLinear transition. 7 Steady-state43Warm idle0.

1 Speed terms are defined in 40 CFR part 1065.

2 The percent torque is relative to the maximum torque at the commanded engine speed.

3 Advance from one mode to the next within a 20-second transition phase. During the transition phase, command a linear progression from the torque setting of the current mode to the torque setting of the next mode, and simultaneously command a similar linear progression for engine speed if there is a change in speed setting.

(c) The following duty cycles apply for variable-speed engines with maximum engine power at or above 19 kW:

(1) The following duty cycle applies for discrete-mode testing:

C1 mode number Engine speed 1Torque
(percent) 2
Weighting
factors
1Maximum test speed1000.15 2Maximum test speed750.15 3Maximum test speed500.15 4Maximum test speed100.10 5Intermediate test speed1000.10 6Intermediate test speed750.10 7Intermediate test speed500.10 8Warm idle00.15

1 Speed terms are defined in 40 CFR part 1065.

2 The percent torque is relative to the maximum torque at the commanded test speed.

(2) The following duty cycle applies for ramped-modal testing:

RMC mode Time in mode
(seconds)
Engine speed 1 3Torque
(percent) 2 3
1a Steady-state126Warm Idle0. 1b Transition20Linear TransitionLinear Transition. 2a Steady-state159Intermediate Speed100. 2b Transition20Intermediate SpeedLinear Transition. 3a Steady-state160Intermediate Speed50. 3b Transition20Intermediate SpeedLinear Transition. 4a Steady-state162Intermediate Speed75. 4b Transition20Linear TransitionLinear Transition. 5a Steady-state246Maximum Test Speed100. 5b Transition20Maximum Test SpeedLinear Transition. 6a Steady-state164Maximum Test Speed10. 6b Transition20Maximum Test SpeedLinear Transition. 7a Steady-state248Maximum Test Speed75. 7b Transition20Maximum Test SpeedLinear Transition. 8a Steady-state247Maximum Test Speed50. 8b Transition20Linear TransitionLinear Transition. 9 Steady-state128Warm Idle0.

1 Speed terms are defined in 40 CFR part 1065.

2 The percent torque is relative to the maximum torque at the commanded engine speed.

3 Advance from one mode to the next within a 20-second transition phase. During the transition phase, command a linear progression from the torque setting of the current mode to the torque setting of the next mode, and simultaneously command a similar linear progression for engine speed if there is a change in speed setting.

[69 FR 39213, June 29, 2004, as amended at 73 FR 37241, June 30, 2008]