- Table 3 to Subpart PPPPPP of Part 63—Applicability of General Provisions to This Subpart

As required in § 63.11425, you must comply with the requirements of the NESHAP General Provisions (subpart A of this part) as shown in the following table.

Citation Subject Applies to this subpart? Explanation 63.1ApplicabilityYes 63.2DefinitionsYes 63.3Units and Abbreviations 63.4Prohibited Activities and CircumventionYes 63.5Preconstruction Review and Notification RequirementsNo 63.6(a) through (d)Compliance with Standards and Maintenance RequirementsYes 63.6(e)(1)(i)General Duty to Minimize EmissionsNoSection 63.11423(a)(3) specifies general duty requirements. 63.6(e)(1)(ii)Requirement to correct malfunctions as soon as possibleNo 63.6(e)(1)(iii)Enforceability of requirements independent of other regulationsYes 63.6(e)(3)SSM PlansNoThis subpart does not require a startup, shutdown, and malfunction plan. 63.6(f)(1)Compliance Except During SSMNo 63.6(f)(2) and (3)Methods for determining complianceYes 63.6(g)Use of an alternative nonopacity emission standardYes 63.6(h)(1)SSM ExemptionNo 63.6(h)(2) through (9), (i) through (j)Compliance with opacity/visible emission standards, compliance extensions and exemptionsYes 63.7(a) through (d), (e)(2) and (3), (f) through (h)Performance Testing RequirementsYes 63.7(e)(1)Conditions for conducting performance testsNoRequirements for performance test conditions are found in § 63.11423(c)(7). 63.8(a), (b), (c)(1)(ii), (d)(1) and (2), (e) through (g)Monitoring RequirementsYes 63.8(c)(1)(i)General duty to minimize emissions and CMS operationNoSection 63.11423(a)(3) specifies general duty requirements. 63.8(c)(1)(iii)Requirement to develop SSM Plan for CMSNo 63.8(d)(3)Written procedures for CMSNo 63.9Notification RequirementsYes 63.10(a), (b)(1), (b)(2)(iii), (b)(2)(vi) through (ix), (b)(3), (c)(1) through (14), (d)(1) through (4), (e), (f)Recordkeeping and Reporting RequirementsYes 63.10(b)(2)(i)Recordkeeping of occurrence and duration of startups and shutdownsNo 63.10(b)(2)(ii)Recordkeeping of failures to meet a standardNoSection 63.11424(a)(5) specifies these requirements. 63.10(b)(2)(iv) and (v)Actions taken to minimize emissions during SSMNo 63.10(c)(15)Use of SSM PlanNo 63.10(d)(5)NoThis subpart does not require a startup, shutdown, and malfunction plan. See § 63.11424(c) for excess emissions reporting requirements. 63.11Control Device RequirementsNoThis subpart does not require flares. 63.12State Authorities and DelegationsYes 63.13AddressesYes 63.14Incorporations by ReferenceYes 63.15Availability of Information and ConfidentialityYes 63.16Performance Track ProvisionsYes 63.1(a)(5), (a)(7) through (9), (b)(2), (c)(3), (d), 63.6(b)(6), (c)(3) and (4), (d), (e)(2), (e)(3)(ii), (h)(3), (h)(5)(iv), 63.8(a)(3), 63.9(b)(3), (h)(4), 63.10(c)(2) through (4), (c)(9)ReservedNo
[88 FR 11596, Feb. 23, 2023]