- Table 3 to Subpart PPPPPP of Part 63—Applicability of General Provisions to This Subpart
As required in § 63.11425, you must comply with the requirements of the NESHAP General Provisions (subpart A of this part) as shown in the following table.
Citation | Subject | Applies to this subpart? | Explanation | 63.1 | Applicability | Yes | 63.2 | Definitions | Yes | 63.3 | Units and Abbreviations | 63.4 | Prohibited Activities and Circumvention | Yes | 63.5 | Preconstruction Review and Notification Requirements | No | 63.6(a) through (d) | Compliance with Standards and Maintenance Requirements | Yes | 63.6(e)(1)(i) | General Duty to Minimize Emissions | No | Section 63.11423(a)(3) specifies general duty requirements. | 63.6(e)(1)(ii) | Requirement to correct malfunctions as soon as possible | No | 63.6(e)(1)(iii) | Enforceability of requirements independent of other regulations | Yes | 63.6(e)(3) | SSM Plans | No | This subpart does not require a startup, shutdown, and malfunction plan. | 63.6(f)(1) | Compliance Except During SSM | No | 63.6(f)(2) and (3) | Methods for determining compliance | Yes | 63.6(g) | Use of an alternative nonopacity emission standard | Yes | 63.6(h)(1) | SSM Exemption | No | 63.6(h)(2) through (9), (i) through (j) | Compliance with opacity/visible emission standards, compliance extensions and exemptions | Yes | 63.7(a) through (d), (e)(2) and (3), (f) through (h) | Performance Testing Requirements | Yes | 63.7(e)(1) | Conditions for conducting performance tests | No | Requirements for performance test conditions are found in § 63.11423(c)(7). | 63.8(a), (b), (c)(1)(ii), (d)(1) and (2), (e) through (g) | Monitoring Requirements | Yes | 63.8(c)(1)(i) | General duty to minimize emissions and CMS operation | No | Section 63.11423(a)(3) specifies general duty requirements. | 63.8(c)(1)(iii) | Requirement to develop SSM Plan for CMS | No | 63.8(d)(3) | Written procedures for CMS | No | 63.9 | Notification Requirements | Yes | 63.10(a), (b)(1), (b)(2)(iii), (b)(2)(vi) through (ix), (b)(3), (c)(1) through (14), (d)(1) through (4), (e), (f) | Recordkeeping and Reporting Requirements | Yes | 63.10(b)(2)(i) | Recordkeeping of occurrence and duration of startups and shutdowns | No | 63.10(b)(2)(ii) | Recordkeeping of failures to meet a standard | No | Section 63.11424(a)(5) specifies these requirements. | 63.10(b)(2)(iv) and (v) | Actions taken to minimize emissions during SSM | No | 63.10(c)(15) | Use of SSM Plan | No | 63.10(d)(5) | No | This subpart does not require a startup, shutdown, and malfunction plan. See § 63.11424(c) for excess emissions reporting requirements. | 63.11 | Control Device Requirements | No | This subpart does not require flares. | 63.12 | State Authorities and Delegations | Yes | 63.13 | Addresses | Yes | 63.14 | Incorporations by Reference | Yes | 63.15 | Availability of Information and Confidentiality | Yes | 63.16 | Performance Track Provisions | Yes | 63.1(a)(5), (a)(7) through (9), (b)(2), (c)(3), (d), 63.6(b)(6), (c)(3) and (4), (d), (e)(2), (e)(3)(ii), (h)(3), (h)(5)(iv), 63.8(a)(3), 63.9(b)(3), (h)(4), 63.10(c)(2) through (4), (c)(9) | Reserved | No |
---|