- Table 2 to Subpart NNNNNN of Part 63—Applicability of General Provisions to Subpart NNNNNN

Citation Subject Applies Explanation 63.1(a)(1), (a)(2), (a)(3), (a)(4), (a)(6), (a)(10)-(a)(12), (b)(1), (b)(3), (c)(1), (c)(2), (c)(5), (e)ApplicabilityYes. 63.1(a)(5), (a)(7)-(a)(9), (b)(2), (c)(3), (c)(4), (d)ReservedNo. 63.2DefinitionsYes. 63.3Units and AbbreviationsYes. 63.4Prohibited Activities and CircumventionYes. 63.5Preconstruction Review and Notification RequirementsNo. 63.6(a), (b)(1)-(b)(5), (b)(7), (c)(1), (c)(2), (c)(5), (e)(1), (e)(3)(i), (e)(3)(iii)-(e)(3)(ix), (f), (g), (i), (j)Compliance with Standards and Maintenance RequirementsYesThe startup, shutdown, and malfunction requirements in § 63.6(e)(3) apply at new and existing area sources that choose to comply with § 63.11410(k)(2) instead of the requirements in § 63.11410(k)(1). 63.6(b)(6), (c)(3), (c)(4), (d), (e)(2), (e)(3)(ii), (h)(3), (h)(5)(iv)ReservedNo. 63.6(h)(1)-(h)(4), (h)(5)(i)-(h)(5)(iii), (h)(6)-(h)(9)NoSubpart NNNNNN does not include opacity or visible emissions standards or require a continuous opacity monitoring system. 63.7(a), (e), (f), (g), (h)Performance Testing RequirementsYesSubpart NNNNNN requires a performance test for a new source; a test for an existing source is not required under the conditions specified in § 63.11410(i). 63.7(b), (c)Yes/NoRequirements for notification of performance test and for quality assurance program apply to new area sources but not existing area sources. 63.8(a)(1), (a)(2), (b), (c)(1)-(c)(3), (f)(1)-(5)Monitoring RequirementsYes. 63.8(a)(3)ReservedNo. 63.8(a)(4)NoSubpart NNNNNN does not require flares. 63.8(c)(4)-(c)(8), (d), (e), (f)(6), (g)NoSubpart NNNNNN establishes requirements for continuous parameter monitoring systems. 63.9(a), (b)(1), (b)(5), (c), (d), (i), (j)Notification RequirementsYes. 63.9(e)Yes/NoNotification of performance test is required only for new area sources. 63.9(b)(2)Yes. 63.9(b)(3), (h)(4)ReservedNo. 63.9(b)(4), (h)(5)No. 63.9(f), (g)NoSubpart NNNNNN does not include opacity or visible emissions standards or require a continuous opacity monitoring system or continuous emissions monitoring system. 63.9(h)(1)-(h)(3), (h)(6)Yes. 63.10(a), (b)(1), (b)(2)(xii), (b)(2)(xiv), (b)(3)Recordkeeping RequirementsYes. 63.10(b)(2)(i)-(b)(2)(v)Yes.Recordkeeping requirements for startups, shutdowns, and malfunctions apply to new and existing area sources that choose to comply with § 63.11410(k)(2). 63.10(b)(2)(vi)-(b)(2)(ix), (c)(1), (c)(5)-(c)(14)Yes/NoRequirements apply to continuous parameter monitoring systems at new area sources but not existing area sources. 63.10(b)(2)(vii)(A)-(B), (b)(2)(x), (b)(2)(xiii)No. 63.10(c)(2)-(c)(4), (c)(9)ReservedNo. 63.10(d)(1), (d)(4), (f)Reporting RequirementsYes. 63.10(d)(2)YesReport of performance test results applies to new area sources; the results of a previous test may be submitted for an existing area source under the conditions specified in § 63.11410(i). 63.10(d)(3)NoSubpart NNNNNN does not include opacity or visible emissions limits. 63.10(d)(5)YesRequirements for startup, shutdown, and malfunction reports apply to new and existing area sources that choose to comply with § 63.11410(k)(2). 63.10(e)(1)-(e)(2), (e)(4)NoSubpart NNNNNN does not require a continuous emissions monitoring system or continuous opacity monitoring system. 63.10(e)(3)Yes/NoSemiannual reporting requirements apply to new area sources but not existing area sources. 63.11Control Device RequirementsNoSubpart NNNNNN does not require flares. 63.12State Authorities and DelegationsYes. 63.13AddressesYes. 63.14Incorporations by ReferenceYes. 63.15Availability of Information and ConfidentialityYes. 63.16Performance Track ProvisionsYes.