- Table 1 to Subpart GGGGGG of Part 63—Applicability of General Provisions to Primary Zinc Production Area Sources
As required in § 63.11164(a) and (b), you must comply with the requirements of the NESHAP General Provisions (40 CFR part 63, subpart A) as shown in the following table.
Citation | Subject | Applies to subpart GGGGGG | Explanation | 63.1(a)(1), (a)(2), (a)(3), (a)(4), (a)(6), (a)(10)-(a)(12), (b)(1), (b)(3), (c)(1), (c)(2), (c)(5), (e) | Applicability | Yes. | 63.1(a)(5), (a)(7)-(a)(9), (b)(2), (c)(3), (c)(4), (d) | Reserved | No. | 63.2 | Definitions | Yes. | 63.3 | Units and Abbreviations | Yes. | 63.4 | Prohibited Activities and Circumvention | Yes. | 63.5 | Preconstruction Review and Notification Requirements | No. | 63.6(a), (b)(1)-(b)(5), (b)(7), (c)(1), (c)(2), (c)(5) | Compliance with Standards and Maintenance Requirements—Applicability Compliance Dates | Yes. | 63.6(e) | Operation and Maintenance Requirements | Yes/No | Operation and maintenance requirements do not apply to existing sources except that the startup, shutdown, and malfunction requirements in § 63.6(e)(3) are allowed as an alternative to the rule requirements for emergency situations. Operation and maintenance requirements apply to new sources except that the rule requirements for emergency situations are allowed as an alternative to the startup, shutdown, and malfunction requirements in § 63.6(e)(3). | 63.6(f), (g), (i), (j) | Compliance with Nonopacity Emission Standards | Yes. | 63.6(b)(6), (c)(3), (c)(4), (d), (e)(2), (e)(3)(ii), (h)(3), (h)(5)(iv) | Reserved | No. | 63.6(h)(1)-(h)(4), (h)(5)(i)-(h)(5)(iii), (h)(6)-(h)(9) | Yes. | 63.7(a), (e), (f), (g), (h) | Performance Testing Requirements | Yes. | 63.7(b), (c) | Yes/No | Notification of performance tests and quality assurance program apply to new sources but not existing sources. | 63.8(a)(1), (a)(2), (b), (c), (f), (g) | Monitoring Requirements | Yes | Requirements in § 63.6(c)(4)(i)-(ii), (c)(5), (c)(6), (d), (e), (f)(6), and (g) apply if a COMS is used. | 63.8(a)(3) | Reserved | No. | 63.8(a)(4) | No | Subpart GGGGGG does not require flares. | 63.8(d), (e) | Yes/No | Requirements for quality control program and performance evaluations apply to new sources but not existing sources. | 63.9(a), (b)(1), (b)(2), (b)(5), (c), (d), (f), (g), (h)(1)-(h)(3), (h)(5), (h)(6), (i), (j) | Notification Requirements | Yes/No | Notification of performance tests and opacity or visible emissions observations apply to new sources but not existing sources. | 63.9(b)(3), (h)(4) | Reserved | No. | 63.9(b)(4) | No. | 63.10(a), (b)(1), (b)(2)(i)-(v), (d)(4), (d)(5)(i), (f) | Recordkeeping and Reporting Requirements | Yes. | 63.10(b)(2), (b)(3), (c)(1), (c)(5)-(c)(8), (c)(10)-(c)(15), (d)(1)-(d)(3), (d)(5)(ii), (e)(1), (e)(2), (e)(4) | Yes/No | Recordkeeping and reporting requirements apply to new sources but not existing sources. | 63.10(c)(2)-(c)(4), (c)(9) | Reserved | No. | 63.10(e)(3) | Yes/No | Reporting requirements apply to new sources but not existing sources. | 63.11 | Control Device Requirements | No | Subpart GGGGGG does not require flares. | 63.12 | State Authorities and Delegations | Yes. | 63.13 | Addresses | Yes. | 63.14 | Incorporations by Reference | Yes. | 63.15 | Availability of Information and Confidentiality | Yes. | 63.16 | Performance Track Provisions | Yes. |
---|