- Table 1 to Subpart BBBBBBB of Part 63—Emission Reduction and PM Concentration Requirements
For each * * * | You must * * * | Using * * * | 1. Process Vent Stream from equipment in target HAP service | Route the process vent stream to a PM control device with:
a. A PM percent reduction efficiency of 95 percent (98 percent for new sources), or b. An outlet concentration of 0.03 gr/dscf or less | Vent collection system and PM control device, such as a wet scrubber or fabric filter, that are maintained and operated per manufacturer's recommendations. |
---|