Subjgrp 113. Testing and Initial Compliance Requirements
- § 63.6610 - By what date must I conduct the initial performance tests or other initial compliance demonstrations if I own or operate a stationary RICE with a site rating of more than 500 brake HP located at a major source of HAP emissions?
- § 63.6611 - By what date must I conduct the initial performance tests or other initial compliance demonstrations if I own or operate a new or reconstructed 4SLB SI stationary RICE with a site rating of greater than or equal to 250 and less than or equal to 500 brake HP located at a major source of HAP emissions?
- § 63.6612 - By what date must I conduct the initial performance tests or other initial compliance demonstrations if I own or operate an existing stationary RICE with a site rating of less than or equal to 500 brake HP located at a major source of HAP emissions or an existing stationary RICE located at an area source of HAP emissions?
- § 63.6615 - When must I conduct subsequent performance tests?
- § 63.6620 -
- § 63.6625 - What are my monitoring, installation, collection, operation, and maintenance requirements?
- § 63.6630 - How do I demonstrate initial compliance with the emission limitations, operating limitations, and other requirements?