- Table 10 to Subpart JJJJJ of Part 63—Applicability of General Provisions to Subpart JJJJJ
As stated in § 63.8505, you must comply with the General Provisions in §§ 63.1 through 63.16 that apply to you according to the following table:
Citation | Subject | Brief description | Applies to subpart JJJJJ? | § 63.1 | Applicability | Initial applicability determination; applicability after standard established; permit requirements; extensions, notifications | Yes. | § 63.2 | Definitions | Definitions for part 63 standards | Yes. | § 63.3 | Units and Abbreviations | Units and abbreviations for part 63 standards | Yes. | § 63.4 | Prohibited Activities | Compliance date; circumvention; severability | Yes. | § 63.5 | Construction/Reconstruction | Applicability; applications; approvals | Yes. | § 63.6(a) | Applicability | General Provisions (GP) apply unless compliance extension; GP apply to area sources that become major | Yes. | § 63.6(b)(1)-(4) | Compliance Dates for New and Reconstructed sources | Standards apply at effective date; 3 years after effective date; upon startup; 10 years after construction or reconstruction commences for section 112(f) | Yes. | § 63.6(b)(5) | Notification | Must notify if commenced construction or reconstruction after proposal | Yes. | § 63.6(b)(6) | [Reserved] | No. | § 63.6(b)(7) | Compliance Dates for New and Reconstructed Area Sources That Become Major | Area sources that become major must comply with major source standards immediately upon becoming major, regardless of whether required to comply when they were area sources | Yes. | § 63.6(c)(1)-(2) | Compliance Dates for Existing Sources | Comply according to date in subpart, which must be no later than 3 years after effective date; for section 112(f) standards, comply within 90 calendar days of effective date unless compliance extension | Yes. | § 63.6(c)(3)-(4) | [Reserved] | No. | § 63.6(c)(5) | Compliance Dates for Existing Area Sources That Become Major | Area sources that become major must comply with major source standards by date indicated in subpart or by equivalent time period (for example, 3 years) | Yes. | § 63.6(d) | [Reserved] | No. | § 63.6(e)(1)(i) | Operation & Maintenance | General Duty to minimize emissions | No. See § 63.8420(b) for general duty requirement. | § 63.6(e)(1)(ii) | Operation & Maintenance | Requirement to correct malfunctions ASAP | No. | § 63.6(e)(1)(iii) | Operation & Maintenance | Operation and maintenance requirements enforceable independent of emissions limitations | Yes. | § 63.6(e)(2) | [Reserved] | No. | § 63.6(e)(3) | Startup, Shutdown, and Malfunction Plan (SSMP) | Requirement for startup, shutdown, and malfunction (SSM) and SSMP; content of SSMP | No. | § 63.6(f)(1) | Compliance Except During SSM | You must comply with emission standards at all times except during SSM | No. | § 63.6(f)(2)-(3) | Methods for Determining Compliance | Compliance based on performance test, operation and maintenance plans, records, inspection | Yes. | § 63.6(g) | Alternative Standard | Procedures for getting an alternative standard | Yes. | § 63.6(h) | Opacity/VE Standards | Requirements for opacity and VE standards | No, not applicable. | § 63.6(i) | Compliance Extension | Procedures and criteria for Administrator to grant compliance extension | Yes. | § 63.6(j) | Presidential Compliance Exemption | President may exempt source category | Yes. | § 63.7(a)(1)-(2) | Performance Test Dates | Dates for conducting initial performance testing and other compliance demonstrations for emission limits and work practice standards; must conduct 180 calendar days after first subject to rule | Yes. | § 63.7(a)(3) | Section 114 Authority | Administrator may require a performance test under CAA section 114 at any time | Yes. | § 63.7(a)(4) | Notification of Delay in Performance Testing Due To Force Majeure | Must notify Administrator of delay in performance testing due to force majeure | Yes. | § 63.7(b)(1) | Notification of Performance Test | Must notify Administrator 60 calendar days before the test | Yes. | § 63.7(b)(2) | Notification of Rescheduling | Must notify Administrator 5 calendar days before scheduled date of rescheduled date | Yes. | § 63.7(c) | Quality Assurance(QA)/Test Plan | Requirements; test plan approval procedures; performance audit requirements; internal and external QA procedures for testing | Yes. | § 63.7(d) | Testing Facilities | Requirements for testing facilities | Yes. | § 63.7(e)(1) | Conditions for Conducting Performance Tests | Cannot conduct performance tests during SSM; not a violation to exceed standard during SSM | No, § 63.8445 specifies requirements. | § 63.7(e)(2)-(3) | Conditions for Conducting Performance Tests | Must conduct according to subpart and EPA test methods unless Administrator approves alternative; must have at least three test runs of at least 1 hour each; compliance is based on arithmetic mean of three runs; conditions when data from an additional test run can be used | Yes. | § 63.7(e)(4) | Testing under Section 114 | Administrator's authority to require testing under section 114 of the Act | Yes. | § 63.7(f) | Alternative Test Method | Procedures by which Administrator can grant approval to use an alternative test method | Yes. | § 63.7(g) | Performance Test Data Analysis | Must include raw data in performance test report; must submit performance test data 60 calendar days after end of test with the notification of compliance status | Yes. | § 63.7(h) | Waiver of Tests | Procedures for Administrator to waive performance test | Yes. | § 63.8(a)(1) | Applicability of Monitoring Requirements | Subject to all monitoring requirements in subpart | Yes. | § 63.8(a)(2) | Performance Specifications | Performance Specifications in appendix B of 40 CFR part 60 apply | Yes. | § 63.8(a)(3) | [Reserved] | No. | § 63.8(a)(4) | Monitoring with Flares | Requirements for flares in § 63.11 apply | No, not applicable. | § 63.8(b)(1) | Monitoring | Must conduct monitoring according to standard unless Administrator approves alternative | Yes. | § 63.8(b)(2)-(3) | Multiple Effluents and Multiple Monitoring Systems | Specific requirements for installing and reporting on monitoring systems | Yes. | § 63.8(c)(1) | Monitoring System Operation and Maintenance | Maintenance consistent with good air pollution control practices | Yes. | § 63.8(c)(1)(i) | Routine and Predictable SSM | Reporting requirements for SSM when action is described in SSMP | No. | § 63.8(c)(1)(ii) | SSM not in SSMP | Reporting requirements for SSM when action is not described in SSMP | Yes. | § 63.8(c)(1)(iii) | Compliance with Operation and Maintenance Requirements | How Administrator determines if source complying with operation and maintenance requirements | No. | § 63.8(c)(2)-(3) | Monitoring System Installation | Must install to get representative emission and parameter measurements | Yes. | § 63.8(c)(4) | CMS Requirements | Requirements for CMS | No, § 63.8450 specifies requirements. | § 63.8(c)(5) | Continuous Opacity Monitoring System (COMS) Minimum Procedures | COMS minimum procedures | No, not applicable. | § 63.8(c)(6) | CMS Requirements | Zero and high level calibration check requirements | Yes. | § 63.8(c)(7)-(8) | CMS Requirements | Out-of-control periods | Yes. | § 63.8(d)(1) and (2) | CMS Quality Control | Requirements for CMS quality control | Yes. | § 63.8(d)(3) | CMS Quality Control | Written procedures for CMS | No, § 63.8425(b)(9) specifies requirements | § 63.8(e) | CMS Performance Evaluation | Requirements for CMS performance evaluation | Yes. | § 63.8(f)(1)-(5) | Alternative Monitoring Method | Procedures for Administrator to approve alternative monitoring | Yes. | § 63.8(f)(6) | Alternative to Relative Accuracy Test | Procedures for Administrator to approve alternative relative accuracy test for continuous emissions monitoring systems (CEMS) | No, not applicable. | § 63.8(g) | Data Reduction | COMS and CEMS data reduction requirements | No, not applicable. | § 63.9(a) | Notification Requirements | Applicability; State delegation | Yes. | § 63.9(b) | Initial Notifications | Requirements for initial notifications | § 63.9(c) | Request for Compliance Extension | Can request if cannot comply by date or if installed BACT/LAER | Yes. | § 63.9(d) | Notification of Special Compliance Requirements for New Source | For sources that commence construction between proposal and promulgation and want to comply 3 years after effective date | Yes. | § 63.9(e) | Notification of Performance Test | Notify Administrator 60 calendar days prior | Yes. | § 63.9(f) | Notification of VE/Opacity Test | Notify Administrator 30 calendar days prior | No, not applicable. | § 63.9(g)(1) | Additional Notifications When Using CMS | Notification of performance evaluation | Yes. | § 63.9(g)(2)-(3) | Additional Notifications When Using CMS | Notification of COMS data use; notification that relative accuracy alternative criterion were exceeded | No, not applicable. | § 63.9(h) | Notification of Compliance Status | Contents; submittal requirements | Yes. | § 63.9(i) | Adjustment of Submittal Deadlines | Procedures for Administrator to approve change in when notifications must be submitted | Yes. | § 63.9(j) | Change in Previous Information | Must submit within 15 calendar days after the change | Yes. | § 63.9(k) | Electronic reporting procedures | Electronic reporting procedures for notifications per § 63.9(j) | Yes. | § 63.10(a) | Recordkeeping/Reporting | Applicability; general information | Yes. | § 63.10(b)(1) | General Recordkeeping Requirements | General requirements | Yes. | § 63.10(b)(2)(i) | Records Related to SSM | Recordkeeping of occurrence and duration of startups and shutdowns | No. | § 63.10(b)(2)(ii) | Records Related to SSM | Recordkeeping of failures to meet a standard | No. See § 63.8490(c)(2) for recordkeeping of (1) date, time and duration; (2) listing of affected source or equipment, and an estimate of the volume of each regulated pollutant emitted over the standard; and (3) actions to minimize emissions and correct the failure. | § 63.10(b)(2)(iii) | Records Related to SSM | Maintenance records | § 63.10(b)(2)(iv)-(v) | Records Related to SSM | Actions taken to minimize emissions during SSM | No. | § 63.10(b)(2)(vi)-(xii) and (xiv) | CMS Records | Records when CMS is malfunctioning, inoperative or out-of-control | Yes. | § 63.10(b)(2)(xiii) | Records | Records when using alternative to relative accuracy test | § 63.10(b)(3) | Records | Applicability Determinations | Yes. | § 63.10(c)(1)-(15) | Records | Additional records for CMS | No, §§ 63.8425 and 63.8490 specify requirements | § 63.10(d)(1) and (2) | General Reporting Requirements | Requirements for reporting; performance test results reporting | Yes. | § 63.10(d)(3) | Reporting Opacity or VE Observations | Requirements for reporting opacity and VE | No, not applicable. | § 63.10(d)(4) | Progress Reports | Must submit progress reports on schedule if under compliance extension | Yes. | § 63.10(d)(5) | SSM Reports | Contents and submission. | No. See § 63.8485(c)(9) for malfunction reporting requirements. | § 63.10(e)(1)-(3) | Additional CMS Reports | Requirements for CMS reporting | No, §§ 63.8425 and 63.8485 specify requirements. | § 63.10(e)(4) | Reporting COMS data | Requirements for reporting COMS data with performance test data | No, not applicable. | § 63.10(f) | Waiver for Recordkeeping/Reporting | Procedures for Administrator to waive | Yes. | § 63.11 | Flares | Requirement for flares | No, not applicable. | § 63.12 | Delegation | State authority to enforce standards | § 63.13 | Addresses | Addresses for reports, notifications, requests | Yes. | § 63.14 | Incorporation by Reference | Materials incorporated by reference | Yes. | § 63.15 | Availability of Information | Information availability; confidential information | Yes. | § 63.16 | Performance Track Provisions | Requirements for Performance Track member facilities | Yes. |
---|