- Table 10 to Subpart HHHHH of Part 63—Applicability of General Provisions to This Subpart
As specified in § 63.8095, the parts of the general provisions that apply to you are shown in the following table:
Table 10 to Subpart HHHHH of Part 63—Applicability of General Provisions to This Subpart
Citation | Subject | Explanation | § 63.1 | Applicability | Yes. | § 63.2 | Definitions | Yes. | § 63.3 | Units and Abbreviations | Yes. | § 63.4 | Prohibited Activities | Yes. | § 63.5 | Construction/Reconstruction | Yes. | § 63.6(a) | Applicability | Yes. | § 63.6(b)(1)-(4) | Compliance Dates for New and Reconstructed sources | Yes. | § 63.6(b)(5) | Notification | Yes. | § 63.6(b)(6) | [Reserved] | § 63.6(b)(7) | Compliance Dates for New and Reconstructed Area Sources That Become Major | Yes. | § 63.6(c)(1)-(2) | Compliance Dates for Existing Sources | Yes. | § 63.6(c)(3)-(4) | [Reserved] | § 63.6(c)(5) | Compliance Dates for Existing Area Sources That Become Major | Yes. | § 63.6(d) | [Reserved] | § 63.6(e)(1)(i) | General Duty to Minimize Emissions | Yes, before the compliance date specified in § 63.7995(e). No, on and after the compliance date specified in § 63.7995(e). See § 63.8000(e) for the general duty requirement. | § 63.6(e)(1)(ii) | Requirement to Correct Malfunctions as Soon as Possible | Yes, before the compliance date specified in § 63.7995(e). No, on and after the compliance date specified in § 63.7995(e). | § 63.6(e)(1)(iii)-(2) | Operation and Maintenance | Yes. | § 63.6(e)(3) | SSM Plan | Yes, before the compliance date specified in § 63.7995(e). No, on and after the compliance date specified in § 63.7995(e). | § 63.6(f)(1) | Compliance with Non-Opacity Standards Except During SSM | No. See § 63.8000(a). | § 63.6(f)(2)-(3) | Methods for Determining Compliance | Yes. | § 63.6(g)(1)-(3) | Alternative Standard | Yes. | § 63.6(h)(1) | Compliance with Opacity/Visible Emission (VE) Standards Except During SSM | No. See § 63.8000(a). | § 63.6(h)(2)-(9) | Opacity/VE Standards | Only for flares for which Method 22 of 40 CFR part 60, appendix A-7, observations are required as part of a flare compliance assessment. | § 63.6(i)(1)-(14) | Compliance Extension | Yes. | § 63.6(j) | Presidential Compliance Exemption | Yes. | § 63.7(a)(1)-(2) | Performance Test Dates | Yes, except substitute 150 days for 180 days. | § 63.7(a)(3)-(4) | CAA Section 114 Authority, Force Majeure | Yes, and these paragraphs also apply to flare compliance assessments as specified under § 63.997(b)(2). | § 63.7(b)(1) | Notification of Performance Test | Yes. | § 63.7(b)(2) | Notification of Rescheduling | Yes. | § 63.7(c) | Quality Assurance/Test Plan | Yes, except the test plan must be submitted with the notification of the performance test if the control device controls process vessels. | § 63.7(d) | Testing Facilities | Yes. | § 63.7(e)(1) | Conditions for Conducting Performance Tests | Yes, before the compliance date specified in § 63.7995(e), except that performance tests for process vessels must be conducted under worst-case conditions as specified in § 63.8005. No, on and after the compliance date specified in § 63.7995(e). See § 63.8005(d). | § 63.7(e)(2) | Conditions for Conducting Performance Tests | Yes. | § 63.7(e)(3) | Test Run Duration | Yes. | § 63.7(f) | Alternative Test Method | Yes. | § 63.7(g) | Performance Test Data Analysis | Yes. | § 63.7(h) | Waiver of Tests | Yes. | § 63.8(a)(1) | Applicability of Monitoring Requirements | Yes. | § 63.8(a)(2) | Performance Specifications | Yes. | § 63.8(a)(3) | [Reserved] | § 63.8(a)(4) | Monitoring with Flares | Yes. | § 63.8(b)(1) | Monitoring | Yes. | § 63.8(b)(2)-(3) | Multiple Effluents and Multiple Monitoring Systems | Yes. | § 63.8(c)(1) | Monitoring System Operation and Maintenance | Yes. | § 63.8(c)(1)(i) | Maintain and operate CMS | Yes, before the compliance date specified in § 63.7995(e). No, on and after the compliance date specified in § 63.7995(e). See § 63.8000(e) for the general duty to maintain and operate each CMS. | § 63.8(c)(1)(ii) | Routine repairs | Yes. | § 63.8(c)(1)(iii) | Requirement to develop SSM plan for CMS | Yes, before the compliance date specified in § 63.7995(e). No, on and after the compliance date specified in § 63.7995(e). | § 63.8(c)(2)-(3) | Monitoring System Installation | Yes. | § 63.8(c)(4) | Requirements | Only for CEMS; requirements for CPMS are specified in referenced subpart SS of this part. This subpart does not contain requirements for continuous opacity monitoring systems (COMS). | § 63.8(c)(4)(i) | CMS Requirements | No. This subpart does not require COMS. | § 63.8(c)(4)(ii) | CMS requirements | Yes. | § 63.8(c)(5) | COMS Minimum Procedures | No. This subpart does not contain opacity or VE limits. | § 63.8(c)(6) | CMS Requirements | Only for CEMS; requirements for CPMS are specified in referenced subpart SS of this part. | § 63.8(c)(7)-(8) | CMS Requirements | Only for CEMS. Requirements for CPMS are specified in referenced subpart SS of this part. | § 63.8(d)(1)-(2) | CMS Quality Control | Only for CEMS; requirements for CPMS are specified in referenced subpart SS of this part. | § 63.8(d)(3) | Written procedures for CMS | Yes, before the compliance date specified in § 63.7995(e). No, on and after the compliance date specified in § 63.7995(e). See § 63.8000(d)(8). | § 63.8(e) | CMS Performance Evaluation | Section 63.8(e)(6)(ii) does not apply because this subpart does not require COMS. Other sections apply only for CEMS; requirements for CPMS are specified in referenced subpart SS of this part. | § 63.8(f)(1)-(5) | Alternative Monitoring Method | Yes, except you may also request approval using the precompliance report. | § 63.8(f)(6) | Alternative to Relative Accuracy Test | Only for CEMS. | § 63.8(g)(1)-(4) | Data Reduction | Only when using CEMS, except § 63.8(g)(2) does not apply because data reduction requirements for CEMS are specified in § 63.8000(d)(4)(iv).
The requirements for COMS do not apply because this subpart has no opacity or VE limits. | § 63.8(g)(5) | Data Reduction | No. Requirements for CEMS are specified in § 63.8000(d)(4). Requirements for CPMS are specified in referenced subpart SS of this part. | § 63.9(a) | Notification Requirements | Yes. | § 63.9(b)(1)-(5) | Initial Notifications | Yes. | § 63.9(c) | Request for Compliance Extension | Yes. | § 63.9(d) | Notification of Special Compliance Requirements for New Source | Yes. | § 63.9(e) | Notification of Performance Test | Yes. | § 63.9(f) | Notification of VE/Opacity Test | No. This subpart does not contain opacity or VE limits. | § 63.9(g) | Additional Notifications When Using CMS | Only for CEMS; requirements for CPMS are specified in referenced subpart SS of this part. | § 63.9(h)(1)-(6) | Notification of Compliance Status | Yes, except this subpart has no opacity or VE limits, and § 63.9(h)(2) does not apply because § 63.8075(d) specifies the required contents and due date of the notification of compliance status report. | § 63.9(i) | Adjustment of Submittal Deadlines | Yes. | § 63.9(j) | Change in previous information | Yes, for change in major source status, otherwise § 63.8075(e)(8) specifies reporting requirements for process changes. | § 63.9(k) | Electronic reporting procedures | Yes, as specified in § 63.9(j). | § 63.10(a) | Recordkeeping/Reporting | Yes. | § 63.10(b)(1) | Recordkeeping/Reporting | Yes. | § 63.10(b)(2)(i)-(ii) | Records related to SSM | No. Before the compliance date specified in § 63.7995(e), see § 63.998(c)(1)(ii)(D) through (G) and (d)(3) for recordkeeping requirements for periods of SSM. On and after the compliance date specified in § 63.7995(e), see § 63.8080(i). | § 63.10(b)(2)(iii) | Records related to maintenance of air pollution control equipment | Yes. | § 63.10(b)(2)(iv)-(v) | Records related to SSM | Yes, before the compliance date specified in § 63.7995(e). No, on and after the compliance date specified in § 63.7995(e). | § 63.10(b)(2)(vi), (x), and (xi) | CMS Records | Only for CEMS; requirements for CPMS are specified in referenced subpart SS of this part. | § 63.10(b)(2)(vii)-(ix) | Records | Yes. | § 63.10(b)(2)(xii) | Records | Yes. | § 63.10(b)(2)(xiii) | Records | Yes. | § 63.10(b)(2)(xiv) | Records | Yes. | § 63.10(b)(3) | Records | Yes. | § 63.10(c)(1)-(6), (9)-(14) | Records | Only for CEMS; requirements for CPMS are specified in referenced subpart SS of this part. | § 63.10(c)(7)-(8), (15) | Records | No. Recordkeeping requirements are specified in § 63.8080. | § 63.10(d)(1) | General Reporting Requirements | Yes. | § 63.10(d)(2) | Report of Performance Test Results | Yes. | § 63.10(d)(3) | Reporting Opacity or VE Observations | No. This subpart does not contain opacity or VE limits. | § 63.10(d)(4) | Progress Reports | Yes. | § 63.10(d)(5)(i) | SSM Reports | No. Before the compliance date specified in § 63.7995(e), see § 63.8075(e)(5) and (6) for the SSM reporting requirements. On and after the compliance date specified in § 63.7995(e), these requirements no longer apply. | § 63.10(d)(5)(ii) | Immediate SSM reports | No. | § 63.10(e)(1)-(2) | Additional CMS Reports | Only for CEMS, but § 63.10(e)(2)(ii) does not apply because this subpart does not require COMS. | § 63.10(e)(3) | Reports | No. Reporting requirements are specified in § 63.8075. | § 63.10(e)(3)(i)-(iii) | Reports | No. Reporting requirements are specified in § 63.8075. | § 63.10(e)(3)(iv)-(v) | Excess Emissions Reports | No. Reporting requirements are specified in § 63.8075. | § 63.10(e)(3)(vi-viii) | Excess Emissions Report and Summary Report | No. Reporting requirements are specified in § 63.8075. | § 63.10(e)(4) | Reporting COMS data | No. This subpart does not contain opacity or VE limits. | § 63.10(f) | Waiver for Recordkeeping/Reporting | Yes. | § 63.11 | Control and work practice requirements | Yes. | § 63.12 | Delegation | Yes. | § 63.13 | Addresses | Yes. | § 63.14 | Incorporation by Reference | Yes. | § 63.15 | Availability of Information | Yes. |
---|