- Table 6 to Subpart AAAAA of Part 63—Continuous Compliance With Operating Limits

As required in § 63.7121, you must demonstrate continuous compliance with each operating limit listed in Table 3 to subpart AAAAA that applies to you, according to the following table.

For . . . For the following operating limit . . . You must demonstrate continuous compliance by . . . 1. Each lime kiln controlled by a wet scrubberMaintain the 3-hour block average exhaust gas stream pressure drop across the wet scrubber greater than or equal to the pressure drop operating limit established during the performance test; and maintain the 3-hour block average scrubbing liquid flow rate greater than or equal to the flow rate operating limit established during the performance testCollecting the wet scrubber operating data according to all applicable requirements in § 63.7113 and reducing the data according to § 63.7113(a); maintaining the 3-hour block average exhaust gas stream pressure drop across the wet scrubber greater than or equal to the pressure drop operating limit established during the performance test; and maintaining the 3-hour block average scrubbing liquid flow rate greater than or equal to the flow rate operating limit established during the performance test (the continuous scrubbing liquid flow rate measuring device must be accurate within ±1% and the continuous pressure drop measurement device must be accurate within ±1%). 2. Each lime kiln or lime cooler equipped with a FF and using a BLDS, and each lime kiln equipped with an ESP or FF using a PM detectora. Maintain and operate the FF or ESP such that the bag leak or PM detector alarm, is not activated and alarm condition does not exist for more than 5 percent of the total operating time in each 6-month periodi. Operating the FF or ESP so that the alarm on the bag leak or PM detection system is not activated and an alarm condition does not exist for more than 5 percent of the total operating time in each 6-month reporting period; and continuously recording the output from the BLD or PM detection system; and
ii. Each time the alarm sounds and the owner or operator initiates corrective actions within 1 hour of the alarm, 1 hour of alarm time will be counted (if the owner or operator takes longer than 1 hour to initiate corrective actions, alarm time will be counted as the actual amount of time taken by the owner or operator to initiate corrective actions); if inspection of the FF or ESP system demonstrates that no corrective actions are necessary, no alarm time will be counted.
3. Each stack emissions source from a PSH operation subject to an opacity limit, which is controlled by a wet scrubberMaintain the 3-hour block average exhaust gas stream pressure drop across the wet scrubber greater than or equal to the pressure drop operating limit established during the performance test; and maintain the 3-hour block average scrubbing liquid flow rate greater than or equal to the flow rate operating limit established during the performance testCollecting the wet scrubber operating data according to all applicable requirements in § 63.7113 and reducing the data according to § 63.7113(a); maintaining the 3-hour block average exhaust gas stream pressure drop across the wet scrubber greater than or equal to the pressure drop operating limit established during the performance test; and maintaining the 3-hour block average scrubbing liquid flow rate greater than or equal to the flow rate operating limit established during the performance test (the continuous scrubbing liquid flow rate measuring device must be accurate within ±1% and the continuous pressure drop measurement device must be accurate within ±1%). 4. For each lime kiln or lime cooler equipped with a FF or an ESP that uses a COMS as the monitoring devicea. Maintain and operate the FF or ESP such that the average opacity for any 6-minute block period does not exceed 15 percenti. Installing, maintaining, calibrating and operating a COMS as required by the general provisions of subpart A of this part and according to PS-1 of appendix B to 40 CFR part 60, except as specified in § 63.7113(g)(2); and
ii. Collecting the COMS data at a frequency of at least once every 15 seconds, determining block averages for each 6-minute period and demonstrating for each 6-minute block period the average opacity does not exceed 15 percent.
7. Each lime kiln equipped with dry sorbent and/or activated carbon injectionMaintain the 3-hour block dry sorbent and/or activated carbon flow rate greater than or equal to the stack flow rate operating limit established during the most recent performance test.Collecting the dry sorbent and/or activated carbon injection operating data according to all applicable requirements in § 63.7113 and reducing the data according to § 63.7113(a); maintaining the 3-hour block average injection flow rate greater than or equal to the injection flow rate operating limit established during the performance test. 8. Each lime kiln equipped with a thermal oxidizerMaintain the 3-hour block average combustion chamber temperature greater or equal to the combustion chamber operating limit established in the most recent performance testCollecting the thermal oxidizer operating data according to all applicable requirements in § 63.7113 and reducing the data according to § 63.7113(a); maintaining the 3-hour block average combustion chamber temperature greater than or equal to the combustion chamber operating limit established during the performance test.
[89 FR 57757, July 16, 2024]