- Table 8 to Subpart VVVV of Part 63—Applicability of General Provisions (40 CFR Part 63, Subpart A) to Subpart VVVV
As specified in § 63.5773, you must comply with the applicable requirements of the General Provisions according to the following table:
Citation | Requirement | Applies to
subpart VVVV | Explanation | § 63.1(a) | General Applicability | Yes. | § 63.1(b) | Initial Applicability Determination | Yes. | § 63.1(c)(1) | Applicability After Standard Established | Yes. | § 63.1(c)(2) | Yes | Area sources are not regulated by subpart VVVV. | § 63.1(c)(3) | No | [Reserved]. | § 63.1(c)(4)-(5) | Yes. | § 63.1(d) | No | [Reserved]. | § 63.1(e) | Applicability of Permit Program | Yes. | § 63.2 | Definitions | Yes | Additional definitions are found in § 63.5779. | § 63.3 | Units and Abbreviations | Yes. | § 63.4(a) | Prohibited Activities | Yes. | § 63.4(b)-(c) | Circumvention/Severability | Yes. | § 63.5(a) | Construction/Reconstruction | Yes. | § 63.5(b) | Requirements for Existing, Newly Constructed, and Reconstructed Sources | Yes. | § 63.5(c) | No | [Reserved]. | § 63.5(d) | Application for Approval of Construction/Reconstruction | Yes. | § 63.5(e) | Approval of Construction/Reconstruction | Yes. | § 63.5(f) | Approval of Construction/Reconstruction Based on prior State Review | Yes. | § 63.6(a) | Compliance with Standards and Maintenance Requirements—Applicability | Yes. | § 63.6(b) | Compliance Dates for New and Reconstructed Sources | Yes | § 63.695 specifies compliance dates, including the compliance date for new area sources that become major sources after the effective date of the rule. | § 63.6(c) | Compliance Dates for Existing Sources | Yes | § 63.5695 specifies compliance dates, including the compliance date for existing area sources that become major sources after the effective date of the rule. | § 63.6(d) | No | [Reserved]. | § 63.6(e)(1)-(2) | Operation and Maintenance Requirements | No | Operating requirements for open molding operations with add-on controls are specified in § 63.5725. | § 63.6(e)(3) | Startup, Shut Down, and Malfunction Plans | No | Only sources with add-on controls must complete startup, shutdown, and malfunction plans. | § 63.6(f)(1) | No. | § 63.6(f)(2)-(3) | Compliance with Nonopacity Emission Standards | Yes. | § 63.6(g) | Use of an Alternative Nonopacity Emission Standard | Yes. | § 63.6(h) | Compliance with Opacity/Visible Emissions Standards | No | Subpart VVVV does not specify opacity or visible emission standards. | § 63.6(i) | Extension of Compliance with Emission Standards | Yes. | § 63.6(j) | Exemption from Compliance with Emission Standards | Yes. | § 63.7(a)(1) | Performance Test Requirements | Yes. | § 63.7(a)(2) | Dates for performance tests | No | § 63.5716 specifies performance test dates. | § 63.7(a)(3) | Performance testing at other times | Yes. | § 63.7(b)-(h) | Other performance testing requirements | Yes. | § 63.8(a)(1)-(2) | Monitoring Requirements—Applicability | Yes | All of § 63.8 applies only to sources with add-on controls. Additional monitoring requirements for sources with add-on controls are found in § 63.5725. | § 63.8(a)(3) | No | [Reserved]. | § 63.8(a)(4) | No | Subpart VVVV does not refer directly or indirectly to § 63.11. | § 63.8(b)(1) | Conduct of Monitoring | Yes. | § 63.8(b)(2)-(3) | Multiple Effluents and CMS | Yes | Applies to sources that use a CMS on the control device stack. | § 63.8(c)(1)(i) and (iii) | CMS Operation and Maintenance | No | References to startup, shutdown, malfunction are not applicable. | § 63.8(c)(1)-(4) | CMS Operation and Maintenance | Yes | Except those provisions in § 63.8(c)(1)(i) and (iii) as noted above. | § 63.8(c)(5) | Continuous Opacity Monitoring Systems (COMS) | No | Subpart VVVV does not have opacity or visible emission standards. | § 63.8(c)(6)-(8) | CMS Calibration Checks and Out-of-Control Periods | Yes. | § 63.8(d) | Quality Control Program | Yes | Except those provisions of § 63.8(d)(3) regarding a startup, shutdown, malfunction plan as noted below. | § 63.8(d)(3) | Quality Control Program | No | No requirement for a startup, shutdown, malfunction plan. | § 63.8(e) | CMS Performance Evaluation | Yes. | § 63.8(f)(1)-(5) | Use of an Alternative Monitoring Method | Yes. | § 63.8(f)(6) | Alternative to Relative Accuracy Test | Yes | Applies only to sources that use continuous emission monitoring systems (CEMS). | § 63.8(g) | Data Reduction | Yes. | § 63.9(a) | Notification Requirements—Applicability | Yes. | § 63.9(b) | Initial Notifications | Yes. | § 63.9(c) | Request for Compliance Extension | Yes. | § 63.9(d) | Notification That a New Source Is Subject to Special Compliance Requirements | Yes. | § 63.9(e) | Notification of Performance Test | Yes | Applies only to sources with add-on controls. | § 63.9(f) | Notification of Visible Emissions/Opacity Test | No | Subpart VVVV does not have opacity or visible emission standards. | § 63.9(g)(1) | Additional CMS Notifications—Date of CMS Performance Evaluation | Yes | Applies only to sources with add-on controls. | § 63.9(g)(2) | Use of COMS Data | No | Subpart VVVV does not require the use of COMS. | § 63.9(g)(3) | Alternative to Relative Accuracy Testing | Yes | Applies only to sources with CEMS. | § 63.9(h) | Notification of Compliance Status | Yes. | § 63.9(i) | Adjustment of Deadlines | Yes. | § 63.9(j) | Change in Previous Information | Yes. | § 63.10(a) | Recordkeeping/Reporting—Applicability | Yes. | § 63.10(b)(1) | General Recordkeeping Requirements | Yes | §§ 63.567 and 63.5770 specify additional recordkeeping requirements. | § 63.10(b)(2)(i), (iii), (vi)-(xiv) | General Recordkeeping Requirements | Yes. | § 63.10(b)(2)(ii), (iv), (v) | Recordkeeping Relevant to Startup, Shutdown, and Malfunction Periods | No. | § 63.10(b)(3) | Recordkeeping Requirements for Applicability Determinations | Yes | § 63.5686 specifies applicability determinations for non-major sources. | § 63.10(c)(1)-(14) | Additional Recordkeeping for Sources with CMS | Yes | Applies only to sources with add-on controls. | § 63.10(c)(15) | Additional Recordkeeping for Sources with CMS | No | No requirement for a startup, shutdown, malfunction plan. | § 63.10(d)(1) | General Reporting Requirements | Yes | § 63.5764 specifies additional reporting requirements. | § 63.10(d)(2) | Performance Test Results | Yes | § 63.5764 specifies additional requirements for reporting performance test results. | § 63.10(d)(3) | Opacity or Visible Emissions Observations | No | Subpart VVVV does not specify opacity or visible emission standards. | § 63.10(d)(4) | Progress Reports for Sources with Compliance Extensions | Yes. | § 63.10(d)(5) | Startup, Shutdown, and Malfunction Reports | No | Applies only to sources with add-on controls. | § 63.10(e)(1) | Additional CMS Reports—General | Yes | Applies only to sources with add-on controls. | § 63.10(e)(2) | Reporting Results of CMS Performance Evaluations | Yes | Applies only to sources with add-on controls. | § 63.10(e)(3) | Excess Emissions/CMS Performance Reports | Yes | Applies only to sources with add-on controls. | § 63.10(e)(4) | COMS Data Reports | No | Subpart VVVV does not specify opacity or visible emission standards. | § 63.10(f) | Recordkeeping/Reporting Waiver | Yes. | § 63.11 | Control Device Requirements—Applicability | No | Facilities subject to subpart VVVV do not use flares as control devices. | § 63.12 | State Authority and Delegations | Yes | § 63.5776 lists those sections of subpart A that are not delegated. | § 63.13 | Addresses | Yes. | § 63.14 | Incorporation by Reference | Yes. | § 63.15 | Availability of Information/Confidentiality | Yes. |
---|