- Table 3 to Subpart OOOO of Part 63—Applicability of General Provisions to Subpart OOOO
[You must comply with the applicable General Provisions requirements according to the following table:]
Citation | Subject | Applicable to subpart OOOO | Explanation | § 63.1(a)(1)-(12) | General Applicability | Yes | § 63.1(b)(1)-(3) | Initial Applicability Determination | Yes | Applicability to subpart OOOO is also specified in § 63.4281. | § 63.1(c)(1) | Applicability After Standard Established | Yes | § 63.1(c)(2)-(3) | Applicability of Permit Program for Area Sources | No | Area sources are not subject to subpart OOOO. | § 63.1(c)(4)-(5) | Extensions and Notifications | Yes | § 63.1(c)(6) | Reclassification | Yes | § 63.1(e) | Applicability of Permit Program Before Relevant Standard is Set | Yes | § 63.2 | Definitions | Yes | Additional definitions are specified in § 63.4371. | § 63.3(a)-(c) | Units and Abbreviations | Yes | § 63.4(a)(1)-(5) | Prohibited Activities | Yes | § 63.4(b)-(c) | Circumvention/Severability | Yes | § 63.5(a) | Construction/Reconstruction | Yes | § 63.5(b)(1)-(6) | Requirements for Existing, Newly Constructed, and Reconstructed Sources | Yes | § 63.5(d) | Application for Approval of Construction/Reconstruction | Yes | § 63.5(e) | Approval of Construction/Reconstruction | Yes | § 63.5(f) | Approval of Construction/Reconstruction Based on Prior State Review | Yes | § 63.6(a) | Compliance With Standards and Maintenance Requirements—Applicability | Yes | § 63.6(b)(1)-(7) | Compliance Dates for New and Reconstructed Sources | Yes | Section 63.4283 specifies the compliance dates. | § 63.6(c)(1)-(5) | Compliance Dates for Existing Sources | Yes | Section 63.4283 specifies the compliance dates. | § 63.6(e)(1)(i) | Operation and Maintenance | Yes, before September 12, 2019.
No, on and after September 12, 2019 | § 63.6(e)(1)(ii) | Operation and Maintenance | Yes, before September 12, 2019.
No, on and after September 12, 2019 | § 63.6(e)(1)(iii) | Operation and Maintenance | Yes | § 63.6(e)(3) | Startup, Shutdown, and Malfunction Plan | Yes, before September 12, 2019.
No, on and after September 12, 2019 | § 63.6(f)(1) | Compliance Except During Startup, Shutdown, and Malfunction | Yes, before September 12, 2019.
No, on and after September 12, 2019 | § 63.6(f)(2)-(3) | Methods for Determining Compliance | Yes | § 63.6(g)(1)-(3) | Use of an Alternative Standard | Yes | § 63.6(h) | Compliance With Opacity/Visible Emission Standards | No | Subpart OOOO does not establish opacity standards and does not require continuous opacity monitoring systems (COMS). | § 63.6(i)(1)-(16) | Extension of Compliance | Yes | § 63.6(j) | Presidential Compliance Exemption | Yes | § 63.7(a)(1) | Performance Test Requirements—Applicability | Yes | Applies to all affected sources. Additional requirements for performance testing are specified in §§ 63.4360, 63.4361, and 63.4362. | § 63.7(a)(2) | Performance Test Requirements—Dates | Yes | Applies only to performance tests for capture system and control device efficiency at sources using these to comply with the standard. | § 63.7(a)(3) | Performance Tests Required by the Administrator | Yes | § 63.7(b)-(d) | Performance Test Requirements—Notification, Quality Assurance, Facilities Necessary for Safe Testing, Conditions During Test | Yes | Applies only to performance tests for capture system and control device efficiency at sources using these to comply with the standard. | § 63.7(e)(1) | Conduct of performance tests | Yes, before September 12, 2019.
No, on and after September 12, 2019 | § 63.7(e)(2)-(4) | Conduct of performance tests | Yes | § 63.7(f) | Performance Test Requirements—Use of Alternative Test Method | Yes | Applies to all test methods except those used to determine capture system efficiency. | § 63.7(g)-(h) | Performance Test Requirements—Data Analysis, Recordkeeping, Waiver of Test | Yes | Applies only to performance tests for capture system and add-on control device efficiency at sources using these to comply with the standards. | § 63.8(a)(1)-(3) | Monitoring Requirements—Applicability | Yes | Applies only to monitoring of capture system and add-on control device efficiency at sources using these to comply with the standards. Additional requirements for monitoring are specified in § 63.4364. | § 63.8(a)(4) | Additional Monitoring Requirements | No | Subpart OOOO does not have monitoring requirements for flares. | § 63.8(b) | Conduct of Monitoring | Yes | § 63.8(c)(1) | Continuous Monitoring Systems (CMS) Operation and Maintenance | Yes, before September 12, 2019. No, on and after September 12, 2019 | Section 63.4364 specifies the requirements for the operation of CMS for capture systems and add-on control devices at sources using these to comply. | § 63.8(c)(2)-(3) | CMS Operation and Maintenance | Yes | Applies only to monitoring of capture system and add-on control device efficiency at sources using these to comply with the standards. Additional requirements for CMS operations and maintenance are specified in § 63.4364. | § 63.8(c)(4) | CMS | No | Section 63.4364 specifies the requirements for the operation of CMS for capture systems and add-on control devices at sources using these to comply. | § 63.8(c)(5) | COMS | No | Subpart OOOO does not have opacity or visible emission standards. | § 63.8(c)(6) | CMS Requirements | No | Section 63.4364 specifies the requirements for monitoring systems for capture systems and add-on control devices at sources using these to comply. | § 63.8(c)(7) | CMS Out of Control Periods | Yes | § 63.8(c)(8) | CMS Out of Control Periods and Reporting | No | Section 63.4311 requires reporting of CMS out-of-control periods. | § 63.8(d)-(e) | Quality Control Program and CMS Performance Evaluation | No | Subpart OOOO does not require the use of CEMS. | § 63.8(f)(1)-(5) | Use of an Alternative Monitoring Method | Yes | § 63.8(f)(6) | Alternative to Relative Accuracy Test | No | Subpart OOOO does not require the use of CEMS. | § 63.8(g)(1)-(5) | Data Reduction | No | Sections 63.4363 and 63.4364 specify monitoring data reduction. | § 63.9(a) | Applicability and General Information | Yes | § 63.9(b) | Initial Notifications | No | Subpart OOOO provides 1 year for an existing source to submit an initial notification. | § 63.9(c) | Request for Extension of Compliance | Yes | § 63.9(d) | Notification that Source is Subject to Special Compliance Requirements | Yes | § 63.9(e) | Notification of Performance Test | Yes | Applies only to capture system and add-on control device performance tests at sources using these to comply with the standards. | § 63.9(f) | Notification of Visible Emissions/Opacity Test | No | Subpart OOOO does not have opacity or visible emission standards. | § 63.9(g)(1)-(3) | Additional Notifications When Using CMS | No | Subpart OOOO does not require the use of CEMS. | § 63.9(h) | Notification of Compliance Status | Yes | Section 63.4310 specifies the dates for submitting the notification of compliance status. | § 63.9(i) | Adjustment of Submittal Deadlines | Yes | § 63.9(j) | Change in Previous Information | Yes | § 63.9(k) | Electronic reporting procedures | Yes | Only as specified in § 63.9(j). | § 63.10(a) | Recordkeeping/Reporting—Applicability and General Information | Yes | § 63.10(b)(1) | General Recordkeeping Requirements | Yes | Additional Requirements are specified in §§ 63.4312 and 63.4313. | § 63.10(b)(2)(i) | Recordkeeping of Occurrence and Duration of Startups and Shutdowns | Yes, before September 12, 2019. No, on and after September 12, 2019 | § 63.10(b)(2)(ii) | Recordkeeping of Failures to Meet Standards | Yes, before September 12, 2019. No, on and after September 12, 2019 | § 63.10(b)(2)(iii) | Recordkeeping Relevant to Maintenance of Air Pollution Control and Monitoring Equipment | Yes | § 63.10(b)(2)(iv)-(v) | Actions Taken to Minimize Emissions During Startup, Shutdown, and Malfunction | Yes, before September 12, 2019. No, on and after September 12, 2019 | § 63.10(b)(2)(vi) | Recordkeeping for CMS malfunctions | Yes, before September 12, 2019. No, on and after September 12, 2019. | § 63.10(b)(2)(vii)-(xi) | Records | Yes | § 63.10(b)(2)(xii) | Records | Yes | § 63.10(b)(2)(xiii) | No | Subpart OOOO does not require the use of CEMS. | § 63.10(b)(2)(xiv) | Yes | § 63.10(b)(3) | Recordkeeping Requirements for Applicability Determinations | Yes | § 63.10(c)(1)-(6) | Additional Recordkeeping Requirements for Sources with CMS | Yes | § 63.10(c)(7)-(8) | Additional Recordkeeping Requirements for Sources with CMS | No | § 63.10(c)(10)-(14) | Additional Recordkeeping Requirements for Sources with CMS | Yes | § 63.10(c)(15) | Records Regarding the Startup, Shutdown, and Malfunction Plan | Yes, before September 12, 2019. No, on and after September 12, 2019 | § 63.10(d)(1) | General Reporting Requirements | Yes | Additional requirements are specified in § 63.4311. | § 63.10(d)(2) | Report of Performance Test Results | Yes | Additional requirements are specified in § 63.4311(b). | § 63.10(d)(3) | Reporting Opacity or Visible Emissions Observations | No | Subpart OOOO does not require opacity or visible emissions observations. | § 63.10(d)(4) | Progress Reports for Sources With Compliance Extensions | Yes | § 63.10(d)(5) | Startup, Shutdown, and Malfunction Reports | Yes, before September 12, 2019. No, on and after September 12, 2019 | § 63.10(e)(1)-(2) | Additional CMS Reports | No | Subpart OOOO does not require the use of CEMS. | § 63.10(e)(3) | Excess Emissions/CMS Performance Reports | No | Section 63.4311(a) specifies the contents of periodic compliance reports. | § 63.10(e)(4) | COMS Data Reports | No | Subpart OOOO does not specify requirements for opacity or COMS. | § 63.10(f) | Recordkeeping/Reporting Waiver | Yes | § 63.11 | Control Device Requirements/Flares | No | Subpart OOOO does not specify use of flares for compliance. | § 63.12 | State Authority and Delegations | Yes | § 63.13 | Addresses | Yes | § 63.14 | Incorporation by Reference | Yes | ASNI/ASME PTC 19.10-1981, part 10. | § 63.15 | Availability of Information/Confidentiality | Yes |
---|