- Table 2 to Subpart IIII of Part 63—Applicability of General Provisions to Subpart IIII of Part 63
You must comply with the applicable General Provisions requirements according to the following table:
Citation | Subject | Applicable to subpart IIII | Explanation | § 63.1(a)(1)-(12) | General Applicability | Yes | § 63.1(b)(1)-(3) | Initial Applicability Determination | Yes | Applicability to subpart IIII is also specified in § 63.3081. | § 63.1(c)(1) | Applicability After Standard Established | Yes | § 63.1(c)(2) | Applicability of Permit Program for Area Sources | No | Area sources are not subject to subpart IIII. | § 63.1(c)(5) | Extensions and Notifications | Yes | § 63.1(c)(6) | Reclassification | Yes | § 63.1(e) | Applicability of Permit Program Before Relevant Standard is Set | Yes | § 63.2 | Definitions | Yes | Additional definitions are specified in § 63.3176. | § 63.3 | Units and Abbreviations | Yes | § 63.4(a)(1)-(2) | Prohibited Activities | Yes | § 63.4(b)-(c) | Circumvention/Fragmentation | Yes | § 63.5(a) | Preconstruction Review Applicability | Yes | § 63.5(b)(1), (3), (4), (6) | Requirements for Existing, Newly Constructed, and Reconstructed Sources | Yes | § 63.5(d)(1)(i)-(ii)(F), (d)(1)(ii)(H), (d)(1)(ii)(J), (d)(1)(iii), (d)(2)-(4) | Application for Approval of Construction/Reconstruction | Yes | § 63.5(e) | Approval of Construction/Reconstruction | Yes | § 63.5(f) | Approval of Construction/Reconstruction Based on Prior State Review | Yes | § 63.6(a) | Compliance With Standards and Maintenance Requirements—Applicability | Yes | § 63.6(b)(1)-(5), (b)(7) | Compliance Dates for New and Reconstructed Sources | Yes | Section 63.3083 specifies the compliance dates. | § 63.6(c)(1), (2), (5) | Compliance Dates for Existing Sources | Yes | Section 63.3083 specifies the compliance dates. | § 63.6(e)(1)(i)-(ii) | Operation and Maintenance | Yes before January 5, 2021. No on and after January 5, 2021 | § 63.6(e)(1)(iii) | Operation and Maintenance | Yes | § 63.6(e)(3)(i), (e)(3)(iii)-(ix) | SSMP | Yes before January 5, 2021. No on and after January 5, 2021 | § 63.6(f)(1) | Compliance Except During SSM | Yes before January 5, 2021. No on and after January 5, 2021 | § 63.6(f)(2)-(3) | Methods for Determining Compliance | Yes | § 63.6(g) | Use of an Alternative Standard | Yes | § 63.6(h) | Compliance With Opacity/Visible Emission Standards | No | Subpart IIII does not establish opacity standards and does not require continuous opacity monitoring systems (COMS). | § 63.6(i)(1)-(14), (16) | Extension of Compliance | Yes | 63.6(j) | Presidential Compliance Exemption | Yes | § 63.7(a)(1) | Performance Test Requirements—Applicability | Yes | Applies to all affected sources. Additional requirements for performance testing are specified in §§ 63.3164 and 63.3166. | § 63.7(a)(2) except (a)(2)(i)-(viii) | Performance Test Requirements—Dates | Yes | Applies only to performance tests for capture system and control device efficiency at sources using these to comply with the standards. Section 63.3160 specifies the schedule for performance test requirements that are earlier than those specified in § 63.7(a)(2). | § 63.7(a)(3)-(4) | Performance Tests Required By the Administrator, Force Majeure | Yes | § 63.7(b)-(d) | Performance Test Requirements—Notification, Quality Assurance, Facilities Necessary for Safe Testing Conditions During Test | Yes | Applies only to performance tests for capture system and add-on control device efficiency at sources using these to comply with the standards. | § 63.7(e)(1) | Conduct of performance tests | Yes before January 5, 2021. No on and after January 5, 2021 | § 63.7(e)(2)-(4) | Conduct of performance tests | Yes | § 63.7(f) | Performance Test Requirements—Use of Alternative Test Method | Yes | Applies to all test methods except those used to determine capture system efficiency. | § 63.7(g)-(h) | Performance Test Requirements—Data Analysis, Recordkeeping, Reporting, Waiver of Test | Yes | Applies only to performance tests for capture system and add-on control device efficiency at sources using these to comply with the standards. | § 63.8(a)(1)-(2) | Monitoring Requirements—Applicability | Yes | Applies only to monitoring of capture system and add-on control device efficiency at sources using these to comply with the standards. Additional requirements for monitoring are specified in § 63.3168. | § 63.8(a)(4) | Additional Monitoring Requirements | No | Subpart IIII does not have monitoring requirements for flares. | § 63.8(b) | Conduct of Monitoring | Yes | § 63.8(c)(1) | Continuous Monitoring Systems (CMS) Operation and Maintenance | Yes before January 5, 2021. No on and after January 5, 2021 | Section 63.3168 specifies the requirements for the operation of CMS for capture systems and add-on control devices at sources using these to comply. | 63.8(c)(2)-(3) | CMS Operation and Maintenance | Yes | Applies only to monitoring of capture system and add-on control device efficiency at sources using these to comply with the standards. Additional requirements for CMS operations and maintenance are specified in § 63.3168. | § 63.8(c)(4) | CMS | No | Section 63.3168 specifies the requirements for the operation of CMS for capture systems and add-on control devices at sources using these to comply with the standards. | § 63.8(c)(5) | COMS | No | Subpart IIII does not have opacity or visible emission standards. | § 63.8(c)(6) | CMS Requirements | No | Section 63.3168 specifies the requirements for monitoring systems for capture systems and add-on control devices at sources using these to comply with the standards. | § 63.8(c)(7) | CMS Out-of-Control Periods | Yes | § 63.8(c)(8) | CMS Out-of-Control Periods Reporting | No | Section 63.3120 requires reporting of CMS out-of-control periods. | § 63.8(d)-(e) | Quality Control Program and CMS Performance Evaluation | No | Subpart IIII does not require the use of continuous emissions monitoring systems. | § 63.8(f)(1)-(5) | Use of an Alternative Monitoring Method | Yes | § 63.8(f)(6) | Alternative to Relative Accuracy Test | No | Subpart IIII does not require the use of CEMS. | § 63.8(g) | Data Reduction | No | Sections 63.3167 and 63.3168 specify monitoring data reduction. | § 63.9(a) | Notification Requirements | Yes | § 63.9(b)(1)-(2) | Initial Notifications | Yes | § 63.9(b)(4)(i), (b)(4)(v), (b)(5) | Application for Approval of Construction or Reconstruction | Yes | § 63.9(c) | Request for Extension of Compliance | Yes | § 63.9(d) | Special Compliance Requirement Notification | Yes | § 63.9(e) | Notification of Performance Test | Yes | Applies only to capture system and add-on control device performance tests at sources using these to comply with the standards. | § 63.9(f) | Notification of Visible Emissions/Opacity Test | No | Subpart IIII does not have opacity or visible emission standards. | § 63.9(g) | Additional Notifications When Using CMS | No | Subpart IIII does not require the use of CEMS. | § 63.9(h)(1)-(3), (5)-(6) | Notification of Compliance Status | Yes | Section 63.3110 specifies the dates for submitting the notification of compliance status. | § 63.9(i) | Adjustment of Submittal Deadlines | Yes | § 63.9(j) | Change in Previous Information | Yes | § 63.9(k) | Electronic reporting procedures | Yes | Only as specified in § 63.9(j). | § 63.10(a) | Recordkeeping/Reporting—Applicability and General Information | Yes | § 63.10(b)(1) | General Recordkeeping Requirements | Yes | Additional requirements are specified in §§ 63.3130 and 63.3131. | § 63.10(b)(2)(i)-(ii) | Recordkeeping of Occurrence and Duration of Startups and Shutdowns and of Failures to Meet Standards | Yes before January 5, 2021. No on and after January 5, 2021 | § 63.10(b)(2)(iii) | Recordkeeping Relevant to Maintenance of Air Pollution Control and Monitoring Equipment | Yes | § 63.10(b)(2)(iv)-(v) | Actions Taken to Minimize Emissions During SSM | Yes before January 5, 2021. No on and after January 5, 2021 | § 63.10(b)(2)(vi) | Recordkeeping for CMS Malfunctions | Yes before January 5, 2021. No on and after January 5, 2021 | § 63.10(b)(2)(vii)-(xi) | Records | Yes | § 63.10(b)(2)(xii) | Records | Yes | § 63.10(b)(2)(xiii) | No | Subpart IIII does not require the use of CEMS. | § 63.10(b)(2)(xiv) | Yes | § 63.10(b)(3) | Recordkeeping Requirements for Applicability Determinations | Yes | § 63.10(c)(1)-(6) | Additional Recordkeeping Requirements for Sources with CMS | Yes | § 63.10(c)(7)-(8) | Additional Recordkeeping Requirements for Sources with CMS | No | § 63.10(c)(10)-(14) | Yes | § 63.10(c)(15) | Records Regarding the SSM Plan | Yes before January 5, 2021. No on and after January 5, 2021 | § 63.10(d)(1) | General Reporting Requirements | Yes | Additional requirements are specified in § 63.3120. | § 63.10(d)(2) | Report of Performance Test Results | Yes | Additional requirements are specified in § 63.3120(b). | § 63.10(d)(3) | Reporting Opacity or Visible Emissions Observations | No | Subpart IIII does not require opacity or visible emissions observations. | § 63.10(d)(4) | Progress Reports for Sources With Compliance Extensions | Yes | § 63.10(d)(5) | SSM Reports | Yes before January 5, 2021. No on and after January 5, 2021 | § 63.10(e)(1)-(2) | Additional CMS Reports | No | Subpart IIII does not require the use of CEMS. | § 63.10(e)(3) | Excess Emissions/CMS Performance Reports | No | Section 63.3120(b) specifies the contents of periodic compliance reports. | § 63.10(e)(4) | COMS Data Reports | No | Subpart IIII does not specify requirements for opacity or COMS. | § 63.10(f) | Recordkeeping/Reporting Waiver | Yes | § 63.11 | Control Device Requirements/Flares | No | Subpart IIII does not specify use of flares for compliance. | § 63.12 | State Authority and Delegations | Yes | § 63.13 | Addresses | Yes | § 63.14 | IBR | Yes | § 63.15 | Availability of Information/Confidentiality | Yes |
---|