- Appendix: Table 2 to Subpart HHH of Part 63—Applicability of 40 CFR Part 63 General Provisions to Subpart HHH

General provisions
reference
Applicable to subpart HHH Explanation § 63.1(a)(1)Yes. § 63.1(a)(2)Yes. § 63.1(a)(3)Yes. § 63.1(a)(4)Yes. § 63.1(a)(5)NoSection reserved. § 63.1(a)(6) through (a)(8)Yes. § 63.1(a)(9)NoSection reserved. § 63.1(a)(10)Yes. § 63.1(a)(11)Yes. § 63.1(a)(12)Yes. § 63.1(b)(1)NoSubpart HHH specifies applicability. § 63.1(b)(2)Yes. § 63.1(b)(3)No. § 63.1(c)(1)NoSubpart HHH specifies applicability. § 63.1(c)(2)No. § 63.1(c)(3)NoSection reserved. § 63.1(c)(4)Yes. § 63.1(c)(5)Yes. § 63.1(c)(6)Yes § 63.1(d)NoSection reserved. § 63.1(e)Yes. § 63.2YesExcept definition of major source is unique for this source category and there are additional definitions in subpart HHH. § 63.3(a) through (c)Yes. § 63.4(a)(1)Yes § 63.4(a)(2)Yes § 63.4(a)(3)NoSection reserved. § 63.4(a)(4)NoSection reserved. § 63.4(a)(5)NoSection reserved. § 63.4(b)Yes. § 63.4(c)Yes. § 63.5(a)(1)Yes. § 63.5(a)(2)NoPreconstruction review required only for major sources that commence construction after promulgation of the standard. § 63.5(b)(1)Yes. § 63.5(b)(2)NoSection reserved. § 63.5(b)(3)Yes. § 63.5(b)(4)Yes. § 63.5(b)(5)NoSection reserved. § 63.5(b)(6)Yes. § 63.5(c)NoSection reserved. § 63.5(d)(1)Yes. § 63.5(d)(2)Yes. § 63.5(d)(3)Yes. § 63.5(d)(4)Yes. § 63.5(e)Yes. § 63.5(f)(1)Yes. § 63.5(f)(2)Yes. § 63.6(a)Yes. § 63.6(b)(1)Yes. § 63.6(b)(2)Yes. § 63.6(b)(3)Yes. § 63.6(b)(4)Yes. § 63.6(b)(5)Yes. § 63.6(b)(6)NoSection reserved. § 63.6(b)(7)Yes. § 63.6(c)(1)Yes. § 63.6(c)(2)Yes. § 63.6(c)(3) and (c)(4)NoSection reserved. § 63.6(c)(5)Yes. § 63.6(d)NoSection reserved. § 63.6(e)Yes. § 63.6(e)YesExcept as otherwise specified. § 63.6(e)(1)(i)NoSee § 63.1274(h) for general duty requirement. § 63.6(e)(1)(ii)No. § 63.6(e)(1)(iii)Yes. § 63.6(e)(2)NoSection reserved. § 63.6(e)(3)No. § 63.6(f)(1)No. § 63.6(f)(2)Yes. § 63.6(f)(3)Yes. § 63.6(g)Yes. § 63.6(h)(1)No. § 63.6(h)(2)Yes. § 63.6(h)(3)NoSection reserved. § 63.6(h)(4) through (h)(9)Yes. § 63.6(i)(1) through (i)(14)Yes. § 63.6(i)(15)NoSection reserved. § 63.6(i)(16)Yes. § 63.6(j)Yes. § 63.7(a)(1)Yes. § 63.7(a)(2)YesBut the performance test results must be submitted within 180 days after the compliance date. § 63.7(a)(3)Yes. § 63.7(a)(4)Yes. § 63.7(b)Yes. § 63.7(c)Yes. § 63.7(d)Yes. § 63.7(e)(1)No. § 63.7(e)(2)Yes. § 63.7(e)(3)Yes. § 63.7(e)(4)Yes. § 63.7(f)Yes. § 63.7(g)Yes. § 63.7(h)Yes. § 63.8(a)(1)Yes. § 63.8(a)(2)Yes. § 63.8(a)(3)NoSection reserved. § 63.8(a)(4)Yes. § 63.8(b)(1)Yes. § 63.8(b)(2)Yes. § 63.8(b)(3)Yes. § 63.8(c)(1)Yes. § 63.8(c)(1)(i)No. § 63.8(c)(1)(ii)Yes. § 63.8(c)(1)(iii)No. § 63.8(c)(2)Yes. § 63.8(c)(3)Yes. § 63.8(c)(4)No. § 63.8(c)(5) through (c)(8)Yes. § 63.8(d)(1)Yes. § 63.8(d)(2)Yes. § 63.8(d)(3)YesExcept for last sentence, which refers to an SSM plan. SSM plans are not required. § 63.8(e)YesSubpart HHH does not specifically require continuous emissions monitor performance evaluations, however, the Administrator can request that one be conducted. § 63.8(f)(1) through (f)(5)Yes. § 63.8(f)(6)NoSubpart HHH does not require continuous emissions monitoring. § 63.8(g)NoSubpart HHH specifies continuous monitoring system data reduction requirements. § 63.9(a)Yes. § 63.9(b)(1)Yes. § 63.9(b)(2)YesExisting sources are given 1 year (rather than 120 days) to submit this notification. § 63.9(b)(3)NoSection reserved. § 63.9(b)(4)Yes. § 63.9(b)(5)Yes. § 63.9(c)Yes. § 63.9(d)Yes. § 63.9(e)Yes. § 63.9(f)Yes. § 63.9(g)Yes. § 63.9(h)(1) through (h)(3)Yes. § 63.9(h)(4)NoSection reserved. § 63.9(h)(5) and (h)(6)Yes. § 63.9(i)Yes. § 63.9(j)Yes. § 63.9(k)YesOnly as specified in § 63.9(j). § 63.10(a)Yes. § 63.10(b)(1)YesSection 63.1284(b)(1) requires sources to maintain the most recent 12 months of data on-site and allows offsite storage for the remaining 4 years of data. § 63.10(b)(2)Yes. § 63.10(b)(2)(i)No. § 63.10(b)(2)(ii)NoSee § 63.1284(f) for recordkeeping of (1) occurrence and duration and (2) actions taken during malfunction. § 63.10(b)(2)(iii)Yes. § 63.10(b)(2)(iv) through (b)(2)(v)No. § 63.10(b)(2)(vi) through (b)(2)(xiv)Yes. § 63.10(b)(3)No. § 63.10(c)(1)Yes. § 63.10(c)(2) through (c)(4)NoSections reserved. § 63.10(c)(5) through (c)(8)Yes. § 63.10(c)(9)NoSection reserved. § 63.10(c)(10) through (c)(11)NoSee § 63.1284(f) for recordkeeping of malfunctions. § 63.10(c)(12) through (c)(14)Yes. § 63.10(c)(15)No. § 63.10(d)(1)Yes. § 63.10(d)(2)Yes. § 63.10(d)(3)Yes. § 63.10(d)(4)Yes. § 63.10(d)(5)NoSee § 63.1285(b)(6) for reporting of malfunctions. § 63.10(e)(1)Yes. § 63.10(e)(2)Yes. § 63.10(e)(3)(i)YesSubpart HHH requires major sources to submit Periodic Reports semi-annually. § 63.10(e)(3)(i)(A)Yes. § 63.10(e)(3)(i)(B)Yes. § 63.10(e)(3)(i)(C)NoSection reserved. § 63.10(e)(3)(i)(D)Yes. § 63.10(e)(3)(ii) through (e)(3)(viii)Yes. § 63.10(f)Yes. § 63.11(a) through (e)Yes. § 63.12(a) through (c)Yes. § 63.13(a) through (c)Yes. § 63.14(a) through (q)Yes. § 63.15(a) and (b)Yes.
[77 FR 49597, Aug. 16, 2012, as amended at 85 FR 73898, Nov. 19, 2020]