- Table 1 to Subpart MM of Part 63—General Provisions Applicability to Subpart MM

General provisions
reference
Summary of requirements Applies to
subpart MM
Explanation 63.1(a)(1)General applicability of the General ProvisionsYesAdditional terms defined in § 63.861; when overlap between subparts A and MM of this part, subpart MM takes precedence. 63.1(a)(2)-(14)General applicability of the General ProvisionsYes 63.1(b)(1)Initial applicability determinationNoSubpart MM specifies the applicability in § 63.860. 63.1(b)(2)Title V operating permit—see 40 CFR part 70YesAll major affected sources are required to obtain a title V permit. 63.1(b)(3)Record of the applicability determinationNoAll affected sources are subject to subpart MM according to the applicability definition of subpart MM. 63.1(c)(1)Applicability of subpart A of this part after a relevant standard has been setYesSubpart MM clarifies the applicability of each paragraph of subpart A of this part to sources subject to subpart MM. 63.1(c)(2)Title V permit requirementYesAll major affected sources are required to obtain a title V permit. There are no area sources in the pulp and paper mill source category. 63.1(c)(3)[Reserved]No 63.1(c)(4)Requirements for existing source that obtains an extension of complianceYes 63.1(c)(5)Notification requirements for an area source that increases HAP emissions to major source levelsYes 63.1(c)(6)ReclassificationYes 63.1(d)[Reserved]No 63.1(e)Applicability of permit program before a relevant standard has been setYes 63.2DefinitionsYesAdditional terms defined in § 63.861; when overlap between subparts A and MM of this part occurs, subpart MM takes precedence. 63.3Units and abbreviationsYes 63.4Prohibited activities and circumventionYes 63.5(a)Construction and reconstruction—applicabilityYes 63.5(b)(1)Upon construction, relevant standards for new sourcesYes 63.5(b)(2)[Reserved]No 63.5(b)(3)New construction/reconstructionYes 63.5(b)(4)Construction/reconstruction notificationYes 63.5(b)(5)Construction/reconstruction complianceYes 63.5(b)(6)Equipment addition or process changeYes 63.5(c)[Reserved]No 63.5(d)Application for approval of construction/reconstructionYes 63.5(e)Construction/reconstruction approvalYes 63.5(f)Construction/reconstruction approval based on prior State preconstruction reviewYes 63.6(a)(1)Compliance with standards and maintenance requirements—applicabilityYes 63.6(a)(2)Requirements for area source that increases emissions to become majorYes 63.6(b)Compliance dates for new and reconstructed sourcesYes 63.6(c)Compliance dates for existing sourcesYes, except for sources granted extensions under 63.863(c)Subpart MM specifically stipulates the compliance schedule for existing sources. 63.6(d)[Reserved]No 63.6(e)(1)(i)General duty to minimize emissionsNoSee § 63.860(d) for general duty requirement. 63.6(e)(1)(ii)Requirement to correct malfunctions ASAPNo 63.6(e)(1)(iii)Operation and maintenance requirements enforceable independent of emissions limitationsYes 63.6(e)(2)[Reserved]No 63.6(e)(3)Startup, shutdown, and malfunction plan (SSMP)No 63.6(f)(1)Compliance with nonopacity emissions standards except during SSMNo 63.6(f)(2)-(3)Methods for determining compliance with nonopacity emissions standardsYes 63.6(g)Compliance with alternative nonopacity emissions standardsYes 63.6(h)(1)Compliance with opacity and visible emissions (VE) standards except during SSMNo 63.6(h)(2)-(9)Compliance with opacity and VE standardsYesSubpart MM does not contain any opacity or VE standards; however, § 63.864 specifies opacity monitoring requirements. 63.6(i)Extension of compliance with emissions standardsYes 63.6(j)Exemption from compliance with emissions standardsYes 63.7(a)(1)Performance testing requirements—applicabilityYes 63.7(a)(2)Performance test datesYes 63.7(a)(3)Performance test requests by Administrator under CAA section 114Yes 63.7(a)(4)Notification of delay in performance testing due to force majeureYes 63.7(b)(1)Notification of performance testYes 63.7(b)(2)Notification of delay in conducting a scheduled performance testYes 63.7(c)Quality assurance programYes 63.7(d)Performance testing facilitiesYes 63.7(e)(1)Conduct of performance testsNoSee § 63.865. 63.7(e)(2)-(3)Conduct of performance testsYes 63.7(e)(4)Testing under section 114Yes 63.7(f)Use of an alternative test methodYes 63.7(g)Data analysis, recordkeeping, and reportingYes 63.7(h)Waiver of performance testsYes§ 63.865(c)(1) specifies the only exemption from performance testing allowed under subpart MM. 63.8(a)(1)Monitoring requirements—applicabilityYesSee § 63.864. 63.8(a)(2)Performance SpecificationsYes 63.8(a)(3)[Reserved]No 63.8(a)(4)Monitoring with flaresNoThe use of flares to meet the standards in subpart MM is not anticipated. 63.8(b)(1)Conduct of monitoringYesSee § 63.864. 63.8(b)(2)-(3)Specific requirements for installing and reporting on monitoring systemsYes 63.8(c)(1)Operation and maintenance of CMSYesSee § 63.864. 63.8(c)(1)(i)General duty to minimize emissions and CMS operationNo 63.8(c)(1)(ii)Reporting requirements for SSM when action not described in SSMPYes 63.8(c)(1)(iii)Requirement to develop SSM plan for CMSNo 63.8(c)(2)-(3)Monitoring system installationYes 63.8(c)(4)CMS requirementsYes 63.8(c)(5)Continuous opacity monitoring system (COMS) minimum proceduresYes 63.8(c)(6)Zero and high level calibration check requirementsYes 63.8(c)(7)-(8)Out-of-control periodsYes 63.8(d)(1)-(2)CMS quality control programYesSee § 63.864. 63.8(d)(3)Written procedures for CMSNoSee § 63.864(f). 63.8(e)(1)Performance evaluation of CMSYes 63.8(e)(2)Notification of performance evaluationYes 63.8(e)(3)Submission of site-specific performance evaluation test planYes 63.8(e)(4)Conduct of performance evaluation and performance evaluation datesYes 63.8(e)(5)Reporting performance evaluation resultsYes 63.8(f)Use of an alternative monitoring methodYes 63.8(g)Reduction of monitoring dataYes 63.9(a)Notification requirements—applicability and general informationYes 63.9(b)Initial notificationsYes 63.9(c)Request for extension of complianceYes 63.9(d)Notification that source subject to special compliance requirementsYes 63.9(e)Notification of performance testYes 63.9(f)Notification of opacity and VE observationsYesSubpart MM does not contain any opacity or VE standards; however, § 63.864 specifies opacity monitoring requirements. 63.9(g)(1)Additional notification requirements for sources with CMSYes 63.9(g)(2)Notification of compliance with opacity emissions standardYesSubpart MM does not contain any opacity or VE emissions standards; however, § 63.864 specifies opacity monitoring requirements. 63.9(g)(3)Notification that criterion to continue use of alternative to relative accuracy testing has been exceededYes 63.9(h)Notification of compliance statusYes 63.9(i)Adjustment to time periods or postmark deadlines for submittal and review of required communicationsYes 63.9(j)Change in information already providedYes 63.9(k)Electronic reporting proceduresYesOnly as specified in § 63.9(j). 63.10(a)Recordkeeping requirements—applicability and general informationYesSee § 63.866. 63.10(b)(1)Records retentionYes 63.10(b)(2)(i)Recordkeeping of occurrence and duration of startups and shutdownsNo 63.10(b)(2)(ii)Recordkeeping of failures to meet a standardNoSee § 63.866(d) for recordkeeping of (1) date, time and duration; (2) listing of affected source or equipment, and an estimate of the quantity of each regulated pollutant emitted over the standard; and (3) actions to minimize emissions and correct the failure. 63.10(b)(2)(iii)Maintenance recordsYes 63.10(b)(2)(iv)-(v)Actions taken to minimize emissions during SSMNo 63.10(b)(2)(vi)Recordkeeping for CMS malfunctionsYes 63.10(b)(2)(vii)-(xiv)Other CMS requirementsYes 63.10(b)(3)Records retention for sources not subject to relevant standardYesApplicability requirements are given in § 63.860. 63.10(c)(1)-(14)Additional recordkeeping requirements for sources with CMSYes 63.10(c)(15)Use of SSM planNo 63.10(d)(1)General reporting requirementsYes 63.10(d)(2)Reporting results of performance testsYes 63.10(d)(3)Reporting results of opacity or VE observationsYesSubpart MM does not include any opacity or VE standards; however, § 63.864 specifies opacity monitoring requirements. 63.10(d)(4)Progress reportsYes 63.10(d)(5)(i)Periodic startup, shutdown, and malfunction reportsNoSee § 63.867(c)(3) for malfunction reporting requirements. 63.10(d)(5)(ii)Immediate startup, shutdown, and malfunction reportsNoSee § 63.867(c)(3) for malfunction reporting requirements. 63.10(e)(1)Additional reporting requirements for sources with CMS—GeneralYes 63.10(e)(2)Reporting results of CMS performance evaluationsYes 63.10(e)(3)(i)-(iv)Requirement to submit excess emissions and CMS performance report and/or summary report and frequency of reportingNo§ 63.867(c)(1) and (3) require submittal of the excess emissions and CMS performance report and/or summary report on a semiannual basis. 63.10(e)(3)(v)General content and submittal dates for excess emissions and monitoring system performance reportsYes 63.10(e)(3)(vi)Specific summary report contentNo§ 63.867(c)(1) specifies the summary report content. 63.10(e)(3)(vii)-(viii)Conditions for submitting summary report versus detailed excess emission reportNo§ 63.867(c)(1) and (3) specify the conditions for submitting the summary report or detailed excess emissions and CMS performance report. 63.10(e)(4)Reporting continuous opacity monitoring system data produced during a performance testYes 63.10(f)Waiver of recordkeeping and reporting requirementsYes 63.11Control device requirements for flaresNoThe use of flares to meet the standards in subpart MM is not anticipated. 63.12State authority and delegationsYes 63.13Addresses of State air pollution control agencies and EPA Regional OfficesYes 63.14Incorporations by referenceYes 63.15Availability of information and confidentialityYes 63.16Requirements for Performance Track member facilitiesYes
[66 FR 3193, Jan. 12, 2001, as amended at 66 FR 16408, Mar. 26, 2001; 82 FR 47353, Oct. 11, 2017; 85 FR 73896, Nov. 19, 2020]