- Table 6 to Subpart O of Part 63—Applicability of General Provisions to This Subpart
As specified in § 63.360, the parts of the General Provisions that apply to you are shown in the following table:
Citation | Subject | Applies to subpart O | § 63.1(a)(1) | Applicability | Yes, additional terms defined in § 63.361; when overlap between subparts A and O occurs, subpart O takes precedence. | § 63.1(a)(2)-(3) | Yes. | § 63.1(a)(4) | Yes. Subpart O clarifies the applicability of each paragraph in subpart A to facilities subject to subpart O. | § 63.1(a)(5) | [Reserved] | No. | § 63.1(a)(6)-(8) | Yes. | § 63.1(a)(9) | [Reserved] | § 63.1(a)(10)-(14) | Yes. | § 63.1(b)(1)-(2) | Yes. | § 63.1(b)(3) | No. | § 63.1(c)(1) | No. Subpart O clarifies the applicability of each paragraph in subpart A to facilities subject to subpart O in this table. | § 63.1(c)(2) | Yes. | § 63.1(c)(3) | [Reserved] | No. | § 63.1(c)(4) | Yes. | § 63.1(c)(5) | No. § 63.360 specifies applicability. | § 63.1(c)(6) | Yes. | § 63.1(d) | [Reserved] | No. | § 63.1(e) | Yes. | § 63.2 | Definitions | Yes, additional terms defined in § 63.361; when overlap between subparts A and O occurs, subpart O takes precedence. | § 63.3 | Units and abbreviations | Yes, other units used in subpart O are defined in the text of subpart O. | § 63.4(a)(1)-(3) | Prohibited activities | Yes. | § 63.5(a) | Construction/Reconstruction | No. § 63.366(b)(1) contains applicability requirements for constructed or reconstructed facilities. | § 63.5(b)(1) | Yes. | § 63.5(b)(2) | [Reserved] | § 63.5(b)(3) | No. See § 63.366(b)(2). | § 63.5(b)(4)-(6) | Yes. | § 63.5(c) | [Reserved] | § 63.5(d)(1)-(2) | No. See § 63.366(b)(3). | § 63.5(d)(3)-(4) | Yes. | § 63.5(e) | Yes. | § 63.5(f)(1)-(2) | No. See § 63.366(b)(4). | § 63.6(a) | Applicability | Yes. | § 63.6(b)-(c) | No. § 63.360(j) specifies compliance dates for facilities. | § 63.6(d) | [Reserved] | § 63.6(e)(1)(i) | No. | § 63.6(e)(1)(ii) | Requirement to correct malfunctions ASAP | No. | § 63.6(e)(1)(iii) | Yes. | § 63.6(e)(2) | [Reserved] | No. | § 63.6(e)(3) | SSM Plan Requirements | No. | § 63.6(f)(1) | SSM exemption | No. | § 63.6(f)(2)(i) | Methods for Determining Compliance | Yes. | § 63.6(f)(2)(ii) | No. § 63.363 specifies parameters for determining compliance. | § 63.6(f)(2)(iii)-(iv) | Yes. | § 63.6(f)(2)(v) | No. | § 63.6(f)(3) | Yes. | § 63.6(g) | Alternative Standard | Yes. | § 63.6(h) | Compliance with opacity and visible emission standards | No. Subpart O does not contain any opacity or visible emission standards. | § 63.6(i)(1)-(14), and (16) | Compliance Extension | Yes. | § 63.6(j) | Presidential Compliance Exemption | Yes. | § 63.7(a) | Applicability and Performance Test Dates | Yes. | § 63.7(b) | Notification of Performance Test | Yes. | § 63.7(c) | Quality Assurance/Test Plan | Yes. | § 63.7(d) | Testing Facilities | Yes. | § 63.7(e)(1) | SSM exemption | No. | § 63.7(e)(2)-(4) | Conduct of Performance Tests | Yes. § 63.365 also contains test methods specific to facilities subject to the emissions standards. | § 63.7(f) | Alternative Test Method | Yes. | § 63.7(g) | Performance Test Data Analysis | Yes, except this subpart specifies how and when the performance test and performance evaluation results are reported. | § 63.7(h) | Waiver of Tests | Yes. | § 63.8(a)(1) | Applicability of Monitoring Requirements | Yes. | § 63.8(a)(2) | Performance Specifications | Yes. | § 63.8(a)(3) | [Reserved] | No. | § 63.8(a)(4) | Monitoring with Flares | Yes. | § 63.8(b)(1) | Monitoring | Yes. | § 63.8(b)(2)-(3) | Multiple Effluents and Multiple Monitoring Systems | Yes. | § 63.8(c)(1)(i) | General duty to minimize emissions and CMS operation | No. | § 63.8(c)(1)(ii) | No. A startup, shutdown, and malfunction plan is not required for these standards. | § 63.8(c)(1)(iii) | Requirement to develop SSM Plan for CMS | No. | § 63.8(c)(2)-(3) | Yes. | § 63.8(c)(4)-(5) | No. Frequency of monitoring measurements is provided in § 63.364; opacity monitors are not required for these standards. | § 63.8(c)(6) | No. Performance specifications are contained in § 63.365. | § 63.8(c)(7)(i)(A)-(B) | No. Performance specifications are contained in § 63.365. | § 63.8(c)(7)(i)(C) | No. Opacity monitors are not required for these standards. | § 63.8(c)(7)(ii) | No. Performance specifications are contained in § 63.365. | § 63.8(c)(8) | No. | § 63.8(d)(1)-(2) | Yes. | § 63.8(d)(3) | Written procedures for CMS | No. | § 63.8(e)(1) | CMS Performance Evaluation | Yes, but only applies for CEMS, except this subpart specifies how and when the performance evaluation results are reported. | § 63.8(e)(2) | Yes. | § 63.8(e)(3) | Yes. | § 63.8(e)(4) | Yes. | § 63.8(e)(5)(i) | Yes. | § 63.8(e)(5)(ii) | No. Opacity monitors are not required for these standards. | § 63.8(f)(1)-(5) | Yes. | § 63.8(f)(6) | No. | § 63.8(g)(1) | Yes. | § 63.8(g)(2) | No. | § 63.8(g)(3)-(5) | Yes. | § 63.9(a) | Notification requirements | Yes. | § 63.9(b)(1)-(i) | Yes. | § 63.9(b)(1)(ii)-(iii) | Initial Notifications | No. § 63.366(c)(1)(i) contains language for facilities that increase usage such that the source becomes subject to the emissions standards. | § 63.9(b)(2)-(3) | Initial Notifications | Yes. § 63.366(c)(3) contains additional information to be included in the initial report for existing and new facilities. | § 63.9(b)(4)-(5) | Initial Notifications | No. § 63.366(c)(1)(ii) and (iii) contains requirements for new or reconstructed facilities subject to the emissions standards. | § 63.9(c) | Request for Compliance Extension | Yes. | § 63.9(d) | Notification of Special Compliance Requirements for New Sources | No. | § 63.9(e) | Notification of Performance Test | Yes. | § 63.9(f) | Notification of VE/Opacity Test | No. Opacity monitors are not required for these standards. | § 63.9(g)(1) | Additional Notifications When Using CMS | Yes. | § 63.9(g)(2)-(3) | Additional Notifications When Using CMS | No. Opacity monitors and relative accuracy testing are not required for these standards. | § 63.9(h)(1)-(3) | Notification of Compliance Status | Yes, except § 63.9(h)(5) does not apply because § 63.366(c)(2) instructs facilities to submit actual data. | § 63.9(i) | Adjustment of Submittal Deadlines | Yes. | § 63.9(j) | Change in previous information | Yes. | § 63.9(k) | Electronic reporting procedures | Yes, as specified in § 63.9(j). | § 63.10(a) | Recordkeeping/Reporting | Yes. | § 63.10(b)(1) | Recordkeeping/Reporting | Yes. | § 63.10(b)(2)(i) | Recordkeeping for startup and shutdown | No. See 63.367(f) for recordkeeping requirements. | § 63.10(b)(2)(ii) | Recordkeeping for SSM and failures to meet standards | No. See 63.367(f) for recordkeeping requirements. | § 63.10(b)(2)(iii) | Records related to maintenance of air pollution control equipment | Yes. | § 63.10(b)(2)(iv)-(v) | Actions taken to minimize emissions during SSM | No. | § 63.10(b)(2)(vi) | CMS Records | Yes. | § 63.10(b)(2)(vii)-(ix) | Records | Yes. | § 63.10(b)(2)(x)-(xi) | CMS Records | Yes. | § 63.10(b)(2)(xii) | Records | Yes. | § 63.10(b)(2)(xiii) | Records | Yes. | § 63.10(b)(2)(xiv) | Records | Yes. | § 63.10(b)(3) | Records | Yes. | § 63.10(c)(1)-(14) | Records | Yes. | § 63.10(c)(15) | Use of SSM Plan | No. | § 63.10(d)(1) | General Reporting Requirements | Yes. | § 63.10(d)(2) | Report of Performance Test Results | No. This subpart specifies how and when the performance test results are reported. | § 63.10(d)(3) | Reporting Opacity or VE Observations | No. Subpart O does not contain opacity or visible emissions standards. | § 63.10(d)(4) | Progress Reports | Yes. | § 63.10(d)(5) | SSM Reports | No. See § 63.366 for malfunction reporting requirements. | § 63.10(e)(1) | Additional CEMS Reports | Yes. | § 63.10(e)(2)(i) | Additional CMS Reports | Yes, except this subpart specifies how and when the performance evaluation results are reported. | § 63.10(e)(2)(ii) | Additional COMS Reports | No. Opacity monitors are not required for these standards. | § 63.10(e)(3)(i)-(iv) | Reports | Yes. | § 63.10(e)(3)(v) | Excess Emissions Reports | No. § 63.366(b) and (c) specify contents and submittal dates for excess emissions and monitoring system performance reports. | § 63.10(e)(3)(vi)-(viii) | Excess Emissions Report and Summary Report | Yes. | § 63.10(e)(4) | Reporting COMS data | No. Opacity monitors are not required for these standards. | § 63.10(f) | Waiver for Recordkeeping/Reporting | Yes. | § 63.11 | Control device requirements for flares and work practice requirements for equipment leaks | Yes. | § 63.12 | Delegation | Yes. | § 63.13 | Addresses | Yes. | § 63.14 | Incorporation by Reference | Yes. | § 63.15 | Availability of Information | Yes. |
---|