- Table 20 to Subpart G of Part 63—Wastewater—Periodic Reporting Requirements for Control Devices Subject to § 63.139 Used To Comply With §§ 63.13 Through 63.139

Table 20 to Subpart G of Part 63—Wastewater—Periodic Reporting Requirements for Control Devices Subject to § 63.139 Used To Comply With §§ 63.13 Through 63.139

Control device Reporting requirements (1) Thermal Incinerator. Report all daily average a temperatures that are outside the range established in the NCS b or operating permit and all operating days when insufficient monitoring data are collected. c(2) Catalytic Incinerator(i) Report all daily average a upstream temperatures that are outside the range established in the NCS b or operating permit. (ii) Report all daily average a temperature differences across the catalyst bed that are outside the range established in the NCS b or operating permit. (iii) Report all operating days when insufficient monitoring data are collected. c(3) Boiler or Process Heater with a design heat input capacity less than 44 megawatts and vent stream is not mixed with the primary fuelReport all daily average a firebox temperatures that are outside the range established in the NCS b or operating permit and all operating days when insufficient monitoring data are collected. c(4a) Flare (if meeting the requirements of § 63.139(c)(3))Report the duration of all periods when all pilot flames are absent. (4b) Flare (if meeting the requirements of § 63.108)The reporting requirements are specified in § 63.108(l) of subpart F of this part. (5) CondenserReport all daily average a exit temperatures that are outside the range established in the NCS b or operating permit and all operating days when insufficient monitoring data are collected. c(6) Carbon Adsorber (Regenerative)(i) Report all carbon bed regeneration cycles when the total regeneration stream mass or volumetric flow is outside the range established in the NCS b or operating permit. (ii) Report all carbon bed regeneration cycles during which the temperature of the carbon bed after regeneration is outside the range established in the NCS b or operating permit. (iii) Report all operating days when insufficient monitoring data are collected c. (iv) For each regenerative adsorber that is regenerated offsite subject to the requirements in § 63.139(d)(5) report the date of each instance when breakthrough, as defined in § 63.101, is detected between the first and second adsorber and the adsorber is not replaced according to § 63.139(d)(5)(iii)(A). (7) Carbon Adsorber (Non-Regenerative)(i) Report all operating days when inspections not done according to the schedule developed as specified in table 13 of this subpart. (ii) Report all operating days when carbon has not been replaced at the frequency specified in table 13 of this subpart. (iii) For each nonregenerative adsorber subject to the requirements in § 63.139(d)(5), report the date of each instance when breakthrough, as defined in § 63.101, is detected between the first and second adsorber and the adsorber is not replaced according to § 63.139(d)(5)(iii)(A). (8) All Control Devices(i) Report the times and durations of all periods when the vent stream is diverted through a bypass line or the monitor is not operating, or (ii) Report all monthly inspections that show the valves are moved to the diverting position or the seal has been changed. (iii) For each source as defined in § 63.101, beginning no later than the compliance dates specified in § 63.100(k)(10), report the start date, start time, duration in hours, estimate of the volume of gas in standard cubic feet, the concentration of organic HAP in the gas in parts per million by volume and the resulting mass emissions of organic HAP in pounds that bypass a control device. For periods when the flow indicator is not operating, report the start date, start time, and duration in hours. (9) Thermal Incinerator, Catalytic Incinerator, Boiler, Process Heater, Condenser, or Carbon Adsorber using a continuous organic monitoring device as specified in § 63.143(e)(2)(i) Report all daily average a concentration levels or readings that are outside the range established in the NCS or operating permit. c
(ii) Report all operating days when insufficient monitoring data are collected. c

a The daily average is the average of all values recorded during the operating day, as specified in § 63.147(d).

b NCS = Notification of Compliance Status described in § 63.152.

c The periodic reports shall include the duration of periods when monitoring data are not collected for each excursion as defined in § 63.152(c)(2)(ii)(A).

[89 FR 43219, May 16, 2024]