Subpart B. Subpart B—Non-Federal Oil and Gas Rights
Purpose and Scope
Definitions
Previously Exempt Operations
Temporary Access Permits
Accessing Oil and Gas Rights From a Surface Location Outside the System Unit Boundary
- SECTION § 9.70 - Do I need an operations permit for accessing oil and gas rights from outside the System unit boundary?
- SECTION § 9.71 - What information must I submit to the NPS?
- SECTION § 9.72 - How will the NPS act on my submission?
- SECTION § 9.73 - If I don't need an operations permit, are there still requirements that I must meet?
Operations Permit: Application Contents
- SECTION § 9.80 - Who must apply for an operations permit?
- SECTION § 9.81 - May I use previously submitted information?
- SECTION § 9.82 - What must I include in my application?
- SECTION § 9.83 - What information must be included in all applications?
- SECTION § 9.84 - Existing conditions and proposed area of operations.
- SECTION § 9.85 - Environmental conditions and mitigation actions.
- SECTION § 9.86 - Spill control and emergency preparedness plan.
- SECTION § 9.87 - What additional information must be included if I am proposing geophysical exploration?
- SECTION § 9.88 - What additional information must be included if I am proposing drilling operations?
- SECTION § 9.89 - What additional information must be included if I am proposing well stimulation operations, including hydraulic fracturing?
- SECTION § 9.90 - What additional information must be included if I am proposing production operations?
Operations Permit: Application Review Process
- SECTION § 9.100 - How will NPS process my application?
- SECTION § 9.101 - How will the NPS conduct initial review?
- SECTION § 9.102 - How will the NPS conduct formal review?
- SECTION § 9.103 - What standards must be met to approve my operations permit?
- SECTION § 9.104 - What final actions may the Regional Director take on my operations permit?
- SECTION § 9.105 - What is the approval process for operations in Big Cypress National Preserve?
Operating Standards
- SECTION § 9.110 - What are the purposes and functions of NPS operating standards?
- SECTION § 9.111 - What general facility design and management standards must I meet?
- SECTION § 9.112 - What hydrologic standards must I meet?
- SECTION § 9.113 - What safety standards must I meet?
- SECTION § 9.114 - What lighting and visual standards must I meet?
- SECTION § 9.115 - What noise reduction standards must I meet?
- SECTION § 9.116 - What reclamation and protection standards must I meet?
- SECTION § 9.117 - What additional operating standards apply to geophysical operations?
- SECTION § 9.118 - What additional operating standards apply to drilling, stimulation, and production operations?
General Terms and Conditions
Access to Oil and Gas Rights
Financial Assurance
- SECTION § 9.140 - Do I have to provide financial assurance to the NPS?
- SECTION § 9.141 - How does the NPS establish the amount of financial assurance?
- SECTION § 9.142 - Will the NPS adjust my financial assurance?
- SECTION § 9.143 - When will the NPS release my financial assurance?
- SECTION § 9.144 - Under what circumstances will the NPS retain my financial assurance?
Modification to an Operation
Change of Operator
Well Plugging
Prohibitions and Penalties
Reconsideration and Appeals
- SECTION § 9.190 - Can I, as operator, request reconsideration of NPS decisions?
- SECTION § 9.191 - How does the NPS process my request for reconsideration?
- SECTION § 9.192 - Can I appeal the Regional Director's decision?
- SECTION § 9.193 - Will filing a request for reconsideration or appeal stop the NPS from taking action under this subpart?
- SECTION § 9.194 - What if the original decision was made by the Superintendent?
Public Participation
Information Collection