Subpart B. Subpart B—Design, Equipment, and Installation
- § 157.08 - Applicability of subpart B.
- § 157.09 - Segregated ballast.
- § 157.10 - Segregated ballast tanks and crude oil washing systems for certain new vessels.
- § 157.10a - Segregated ballast tanks, crude oil washing systems, and dedicated clean ballast tanks for certain new and existing vessels of 40,000 DWT or more.
- § 157.10b - Segregated ballast tanks, dedicated clean ballast tanks, and special ballast arrangements for tank vessels transporting Outer Continental Shelf oil.
- § 157.10c - Segregated ballast tanks, crude oil washing systems, and dedicated clean ballast tanks for certain new and existing tankships of 20,000 to 40,000 DWT.
- § 157.10d - Double hulls on tank vessels.
- § 157.11 -
- § 157.12 - Oil discharge monitoring and control system.
- § 157.12a - Definitions.
- § 157.12b - Implementation requirements.
- § 157.12c - Construction, maintenance, security, calibration, and training.
- § 157.12d - Technical specifications.
- § 157.12e - Certificate of approval.
- § 157.12f - Workshop functional test requirements.
- § 157.12g - Plan approval requirements.
- § 157.13 - Designated observation area.
- § 157.14 - Pump-room bottom protection.
- § 157.15 - Slop tanks in tank vessels.
- § 157.17 - Oil residue (sludge) tank.
- § 157.19 - Cargo tank arrangement and size.
- § 157.20 - Accidental oil outflow performance.
- § 157.21 - Subdivision and stability.
- § 157.22 - Intact stability requirements.
- § 157.23 - Cargo and ballast system information.
- § 157.24 - Submission of calculations, plans, and specifications.
- § 157.24a - Submission of calculations, plans, and specifications for existing vessels installing segregated ballast tanks.