Subpart E. Subpart E—Explosives
Storage—Surface and Underground
Storage—Surface Only
Storage—Underground Only
Transportation—Surface and Underground
USE—SURFACE AND UNDERGROUND
- SECTION § 57.6300 - Control of blasting operations.
- SECTION § 57.6301 - Blasthole obstruction check.
- SECTION § 57.6302 - Separation of explosive material.
- SECTION § 57.6303 - Initiation preparation.
- SECTION § 57.6304 - Primer protection.
- SECTION § 57.6305 - Unused explosive material.
- SECTION § 57.6306 - Loading, blasting, and security.
- SECTION § 57.6307 - Drill stem loading.
- SECTION § 57.6308 - Initiation systems.
- SECTION § 57.6309 - Fuel oil requirements for ANFO.
- SECTION § 57.6310 - Misfire waiting period.
- SECTION § 57.6311 - Handling of misfires.
- SECTION § 57.6312 - Secondary blasting.
Electric Blasting—Surface and Underground
- SECTION § 57.6400 - Compatibility of electric detonators.
- SECTION § 57.6401 - Shunting.
- SECTION § 57.6402 - Deenergized circuits near detonators.
- SECTION § 57.6403 - Branch circuits.
- SECTION § 57.6404 - Separation of blasting circuits from power source.
- SECTION § 57.6405 - Firing devices.
- SECTION § 57.6406 - Duration of current flow.
- SECTION § 57.6407 - Circuit testing.
Nonelectric Blasting—Surface and Underground
Extraneous Electricity—Surface and Underground
Equipment/Tools—Surface and Underground
Maintenance—Surface and Underground
General Requirements—Surface and Underground
General Requirements—Underground Only