Subpart E. Subpart E—Explosives
Storage
- SECTION § 56.6100 - Separation of stored explosive material.
- SECTION § 56.6101 - Areas around explosive material storage facilities.
- SECTION § 56.6102 - Explosive material storage practices.
- SECTION § 56.6130 - Explosive material storage facilities.
- SECTION § 56.6131 - Location of explosive material storage facilities.
- SECTION § 56.6132 - Magazine requirements.
- SECTION § 56.6133 - Powder chests.
Transportation
- SECTION § 56.6300 - Control of blasting operations.
- SECTION § 56.6301 - Blasthole obstruction check.
- SECTION § 56.6302 - Separation of explosive material.
- SECTION § 56.6303 - Initiation preparation.
- SECTION § 56.6304 - Primer protection.
- SECTION § 56.6305 - Unused explosive material.
- SECTION § 56.6306 - Loading, blasting, and security.
- SECTION § 56.6307 - Drill stem loading.
- SECTION § 56.6308 - Initiation systems.
- SECTION § 56.6309 - Fuel oil requirements for ANFO.
- SECTION § 56.6310 - Misfire waiting period.
- SECTION § 56.6311 - Handling of misfires.
- SECTION § 56.6312 - Secondary blasting.
Electric Blasting
- SECTION § 56.6400 - Compatibility of electric detonators.
- SECTION § 56.6401 - Shunting.
- SECTION § 56.6402 - Deenergized circuits near detonators.
- SECTION § 56.6403 - Branch circuits.
- SECTION § 56.6404 - Separation of blasting circuits from power source.
- SECTION § 56.6405 - Firing devices.
- SECTION § 56.6406 - Duration of current flow.
- SECTION § 56.6407 - Circuit testing.
Nonelectric Blasting
Extraneous Electricity
Equipment/Tools
Maintenance
General Requirements