Subpart E. Subpart E—Oil and Gas Well-Completion Operations
- § 250.500 - General requirements.
- § 250.501 - Definition.
- § 250.502 - [Reserved]
- § 250.503 - Emergency shutdown system.
- § 250.504 - Hydrogen sulfide.
- § 250.505 - Subsea completions.
- §§ 250.506-250.508 - §[Reserved]
- § 250.509 - Well-completion structures on fixed platforms.
- § 250.510 - Diesel engine air intakes.
- § 250.511 - Traveling-block safety device.
- § 250.512 - Field well-completion rules.
- § 250.513 - Approval and reporting of well-completion operations.
- § 250.514 - Well-control fluids, equipment, and operations.
- §§ 250.515-250.517 - §[Reserved]
- § 250.518 - Tubing and wellhead equipment.
Casing Pressure Management
- SECTION § 250.519 - What are the requirements for casing pressure management?
- SECTION § 250.520 - How often do I have to monitor for casing pressure?
- SECTION § 250.521 - When do I have to perform a casing diagnostic test?
- SECTION § 250.522 - How do I manage the thermal effects caused by initial production on a newly completed or recompleted well?
- SECTION § 250.523 - When do I have to repeat casing diagnostic testing?
- SECTION § 250.524 - How long do I keep records of casing pressure and diagnostic tests?
- SECTION § 250.525 - When am I required to take action from my casing diagnostic test?
- SECTION § 250.526 - What do I submit if my casing diagnostic test requires action?
- SECTION § 250.527 - What must I include in my notification of corrective action?
- SECTION § 250.528 - What must I include in my casing pressure request?
- SECTION § 250.529 - What are the terms of my casing pressure request?
- SECTION § 250.530 - What if my casing pressure request is denied?
- SECTION § 250.531 - When does my casing pressure request approval become invalid?