Subpart B. Subpart B—Selection Procedures, Award Criteria
- § 636.201 - What selection procedures and award criteria may be used?
- § 636.202 - When are two-phase design-build selection procedures appropriate?
- § 636.203 - What are the elements of two-phase selection procedures for competitive proposals?
- § 636.204 - What items may be included in a phase-one solicitation?
- § 636.205 - Can past performance be used as an evaluation criteria?
- § 636.206 - How do I evaluate offerors who do not have a record of relevant past performance?
- § 636.207 - Is there a limit on short listed firms?
- § 636.208 - May I use my existing prequalification procedures with design-build contracts?
- § 636.209 - What items must be included in a phase-two solicitation?
- § 636.210 - What requirements apply to projects which use the modified design-build procedure?
- § 636.211 - When and how should tradeoffs be used?
- § 636.212 -