View all text of Subpart C [§ 450.101 - § 450.189]
§ 450.151 - Work shift and rest requirements.
(a) General. For any launch or reentry, an operator must document and implement rest requirements that ensure safety-critical personnel are physically and mentally capable of performing all assigned tasks.
(b) Work shifts and deviation approval process. An operator's rest requirements must address the following:
(1) Duration of each work shift and the process for extending this shift, including the maximum allowable length of any extension;
(2) Number of consecutive work shift days allowed before rest is required;
(3) Minimum rest period required—
(i) Between each work shift, including the period of rest required immediately before the flight countdown work shift; and
(ii) After the maximum number of work shift days allowed; and
(4) Approval process for any deviation from the rest requirements.
(c) Application requirement. An applicant must submit rest rules that demonstrate compliance with the requirements of this section.