Collapse to view only § 8342. Repealed.

§ 8341. Existing electric powerplants
(a) Certification by powerplants of coal capabilityAt any time, the owner or operator of an existing electric powerplant may certify to the Secretary, for purposes of subsection (b)—
(1) whether or not such powerplant has or previously had the technical capability to use coal or another alternate fuel as a primary energy source;
(2) whether or not such powerplant could have the technical capability to use coal or another alternate fuel as a primary energy source without having—
(A) substantial physical modification of the powerplant, or
(B) substantial reduction in the rated capacity of the powerplant; and
(3) whether or not it is financially feasible to use coal or another alternate fuel as a primary energy source in such a powerplant.
(b) Authority of Secretary to prohibit where coal or alternate fuel capability exists
(c) Authority of Secretary to prohibit excessive use in mixtures
(d) Amendment of subsection (a) and (c) certifications
(Pub. L. 95–620, title III, § 301, as added Pub. L. 97–35, title X, § 1021(a), Aug. 13, 1981, 95 Stat. 614.)
§ 8342. Repealed. Pub. L. 100–42, § 1(a)(2), May 21, 1987, 101 Stat. 310
§ 8343. Rules relating to case-by-case and category prohibitions
(a) Case-by-case prohibitions
(1) Except to the extent authorized by subsection (b), the Secretary shall prohibit any powerplant from using natural gas or petroleum under the authority granted him under section 8341(b) or (c) of this title only by means of a final order issued by him which shall be limited to the particular powerplant involved.
(2) The Secretary may issue such a final order only with respect to a powerplant which is not, at the time the proposed order is issued, covered by a final rule issued under section 1
1 So in original. Probably should be “subsection”.
(b).
(b) Prohibitions applicable to categories of facilities
(1) The Secretary may prohibit, by rule, the use of natural gas or petroleum under section 8341(b) of this title in existing electric powerplants.
(2) Each powerplant to be covered by any final rule issued under this subsection shall be specifically identified in the proposed rule published under section 8411(b) of this title.
(3) In prescribing any final rule under this subsection, the Secretary shall take into account any special circumstances or characteristics of each category of powerplants (such as the intermittent use, size, age, or geographic location of such powerplants). Any such rules shall not apply in the case of any existing electric powerplant with respect to which a comparable prohibition was issued by order.
(Pub. L. 95–620, title III, § 303, Nov. 9, 1978, 92 Stat. 3306; Pub. L. 100–42, § 1(c)(9), May 21, 1987, 101 Stat. 312.)