Collapse to view only § 7651h. Repowered sources

§ 7651. Findings and purposes
(a) Findings
The Congress finds that—
(1) the presence of acidic compounds and their precursors in the atmosphere and in deposition from the atmosphere represents a threat to natural resources, ecosystems, materials, visibility, and public health;
(2) the principal sources of the acidic compounds and their precursors in the atmosphere are emissions of sulfur and nitrogen oxides from the combustion of fossil fuels;
(3) the problem of acid deposition is of national and international significance;
(4) strategies and technologies for the control of precursors to acid deposition exist now that are economically feasible, and improved methods are expected to become increasingly available over the next decade;
(5) current and future generations of Americans will be adversely affected by delaying measures to remedy the problem;
(6) reduction of total atmospheric loading of sulfur dioxide and nitrogen oxides will enhance protection of the public health and welfare and the environment; and
(7) control measures to reduce precursor emissions from steam-electric generating units should be initiated without delay.
(b) Purposes
(July 14, 1955, ch. 360, title IV, § 401, as added Pub. L. 101–549, title IV, § 401, Nov. 15, 1990, 104 Stat. 2584.)
§ 7651a. DefinitionsAs used in this subchapter:
(1) The term “affected source” means a source that includes one or more affected units.
(2) The term “affected unit” means a unit that is subject to emission reduction requirements or limitations under this subchapter.
(3) The term “allowance” means an authorization, allocated to an affected unit by the Administrator under this subchapter, to emit, during or after a specified calendar year, one ton of sulfur dioxide.
(4) The term “baseline” means the annual quantity of fossil fuel consumed by an affected unit, measured in millions of British Thermal Units (“mmBtu’s”), calculated as follows:
(A) For each utility unit that was in commercial operation prior to January 1, 1985, the baseline shall be the annual average quantity of mmBtu’s consumed in fuel during calendar years 1985, 1986, and 1987, as recorded by the Department of Energy pursuant to Form 767. For any utility unit for which such form was not filed, the baseline shall be the level specified for such unit in the 1985 National Acid Precipitation Assessment Program (NAPAP) Emissions Inventory, Version 2, National Utility Reference File (NURF) or in a corrected data base as established by the Administrator pursuant to paragraph (3).1
1 So in original. The reference to “paragraph (3)” probably should be to “subparagraph (C)”.
For nonutility units, the baseline is the NAPAP Emissions Inventory, Version 2. The Administrator, in the Administrator’s sole discretion, may exclude periods during which a unit is shutdown for a continuous period of four calendar months or longer, and make appropriate adjustments under this paragraph. Upon petition of the owner or operator of any unit, the Administrator may make appropriate baseline adjustments for accidents that caused prolonged outages.
(B) For any other nonutility unit that is not included in the NAPAP Emissions Inventory, Version 2, or a corrected data base as established by the Administrator pursuant to paragraph (3),1 the baseline shall be the annual average quantity, in mmBtu consumed in fuel by that unit, as calculated pursuant to a method which the administrator shall prescribe by regulation to be promulgated not later than eighteen months after November 15, 1990.
(C) The Administrator shall, upon application or on his own motion, by December 31, 1991, supplement data needed in support of this subchapter and correct any factual errors in data from which affected Phase II units’ baselines or actual 1985 emission rates have been calculated. Corrected data shall be used for purposes of issuing allowances under the 2
2 So in original. Probably should be “this”.
subchapter. Such corrections shall not be subject to judicial review, nor shall the failure of the Administrator to correct an alleged factual error in such reports be subject to judicial review.
(5) The term “capacity factor” means the ratio between the actual electric output from a unit and the potential electric output from that unit.
(6) The term “compliance plan” means, for purposes of the requirements of this subchapter, either—
(A) a statement that the source will comply with all applicable requirements under this subchapter, or
(B) where applicable, a schedule and description of the method or methods for compliance and certification by the owner or operator that the source is in compliance with the requirements of this subchapter.
(7) The term “continuous emission monitoring system” (CEMS) means the equipment as required by section 7651k of this title, used to sample, analyze, measure, and provide on a continuous basis a permanent record of emissions and flow (expressed in pounds per million British thermal units (lbs/mmBtu), pounds per hour (lbs/hr) or such other form as the Administrator may prescribe by regulations under section 7651k of this title).
(8) The term “existing unit” means a unit (including units subject to section 7411 of this title) that commenced commercial operation before November 15, 1990. Any unit that commenced commercial operation before November 15, 1990, which is modified, reconstructed, or repowered after November 15, 1990, shall continue to be an existing unit for the purposes of this subchapter. For the purposes of this subchapter, existing units shall not include simple combustion turbines, or units which serve a generator with a nameplate capacity of 25MWe or less.
(9) The term “generator” means a device that produces electricity and which is reported as a generating unit pursuant to Department of Energy Form 860.
(10) The term “new unit” means a unit that commences commercial operation on or after November 15, 1990.
(11) The term “permitting authority” means the Administrator, or the State or local air pollution control agency, with an approved permitting program under part B 3
3 See References in Text note below.
of title III of the Act.
(12) The term “repowering” means replacement of an existing coal-fired boiler with one of the following clean coal technologies: atmospheric or pressurized fluidized bed combustion, integrated gasification combined cycle, magnetohydrodynamics, direct and indirect coal-fired turbines, integrated gasification fuel cells, or as determined by the Administrator, in consultation with the Secretary of Energy, a derivative of one or more of these technologies, and any other technology capable of controlling multiple combustion emissions simultaneously with improved boiler or generation efficiency and with significantly greater waste reduction relative to the performance of technology in widespread commercial use as of November 15, 1990. Notwithstanding the provisions of section 7651h(a) of this title, for the purpose of this subchapter, the term “repowering” shall also include any oil and/or gas-fired unit which has been awarded clean coal technology demonstration funding as of January 1, 1991, by the Department of Energy.
(13) The term “reserve” means any bank of allowances established by the Administrator under this subchapter.
(14) The term “State” means one of the 48 contiguous States and the District of Columbia.
(15) The term “unit” means a fossil fuel-fired combustion device.
(16) The term “actual 1985 emission rate”, for electric utility units means the annual sulfur dioxide or nitrogen oxides emission rate in pounds per million Btu as reported in the NAPAP Emissions Inventory, Version 2, National Utility Reference File. For nonutility units, the term “actual 1985 emission rate” means the annual sulfur dioxide or nitrogen oxides emission rate in pounds per million Btu as reported in the NAPAP Emission Inventory, Version 2.
(17)
(A) The term “utility unit” means—
(i) a unit that serves a generator in any State that produces electricity for sale, or
(ii) a unit that, during 1985, served a generator in any State that produced electricity for sale.
(B) Notwithstanding subparagraph (A), a unit described in subparagraph (A) that—
(i) was in commercial operation during 1985, but
(ii) did not, during 1985, serve a generator in any State that produced electricity for sale shall not be a utility unit for purposes of this subchapter.
(C) A unit that cogenerates steam and electricity is not a “utility unit” for purposes of this subchapter unless the unit is constructed for the purpose of supplying, or commences construction after November 15, 1990, and supplies, more than one-third of its potential electric output capacity and more than 25 megawatts electrical output to any utility power distribution system for sale.
(18) The term “allowable 1985 emissions rate” means a federally enforceable emissions limitation for sulfur dioxide or oxides of nitrogen, applicable to the unit in 1985 or the limitation applicable in such other subsequent year as determined by the Administrator if such a limitation for 1985 does not exist. Where the emissions limitation for a unit is not expressed in pounds of emissions per million Btu, or the averaging period of that emissions limitation is not expressed on an annual basis, the Administrator shall calculate the annual equivalent of that emissions limitation in pounds per million Btu to establish the allowable 1985 emissions rate.
(19) The term “qualifying phase I technology” means a technological system of continuous emission reduction which achieves a 90 percent reduction in emissions of sulfur dioxide from the emissions that would have resulted from the use of fuels which were not subject to treatment prior to combustion.
(20) The term “alternative method of compliance” means a method of compliance in accordance with one or more of the following authorities:
(A) a substitution plan submitted and approved in accordance with subsections 4
4 So in original. Probably should be “section”.
7651c(b) and (c) of this title;
(B) a Phase I extension plan approved by the Administrator under section 7651c(d) of this title, using qualifying phase I technology as determined by the Administrator in accordance with that section; or
(C) repowering with a qualifying clean coal technology under section 7651h of this title.
(21) The term “commenced” as applied to construction of any new electric utility unit means that an owner or operator has undertaken a continuous program of construction or that an owner or operator has entered into a contractual obligation to undertake and complete, within a reasonable time, a continuous program of construction.
(22) The term “commenced commercial operation” means to have begun to generate electricity for sale.
(23) The term “construction” means fabrication, erection, or installation of an affected unit.
(24) The term “industrial source” means a unit that does not serve a generator that produces electricity, a “nonutility unit” as defined in this section, or a process source as defined in section 7651i(e) 5
5 So in original. Probably should be section “7651i(d)”.
of this title.
(25) The term “nonutility unit” means a unit other than a utility unit.
(26) The term “designated representative” means a responsible person or official authorized by the owner or operator of a unit to represent the owner or operator in matters pertaining to the holding, transfer, or disposition of allowances allocated to a unit, and the submission of and compliance with permits, permit applications, and compliance plans for the unit.
(27) The term “life-of-the-unit, firm power contractual arrangement” means a unit participation power sales agreement under which a utility or industrial customer reserves, or is entitled to receive, a specified amount or percentage of capacity and associated energy generated by a specified generating unit (or units) and pays its proportional amount of such unit’s total costs, pursuant to a contract either—
(A) for the life of the unit;
(B) for a cumulative term of no less than 30 years, including contracts that permit an election for early termination; or
(C) for a period equal to or greater than 25 years or 70 percent of the economic useful life of the unit determined as of the time the unit was built, with option rights to purchase or re-lease some portion of the capacity and associated energy generated by the unit (or units) at the end of the period.
(28) The term “basic Phase II allowance allocations” means:
(A) For calendar years 2000 through 2009 inclusive, allocations of allowances made by the Administrator pursuant to section 7651b of this title and subsections (b)(1), (3), and (4); (c)(1), (2), (3), and (5); (d)(1), (2), (4), and (5); (e); (f); (g)(1), (2), (3), (4), and (5); (h)(1); (i) and (j) of section 7651d of this title.
(B) For each calendar year beginning in 2010, allocations of allowances made by the Administrator pursuant to section 7651b of this title and subsections (b)(1), (3), and (4); (c)(1), (2), (3), and (5); (d)(1), (2), (4) and (5); (e); (f); (g)(1), (2), (3), (4), and (5); (h)(1) and (3); (i) and (j) of section 7651d of this title.
(29) The term “Phase II bonus allowance allocations” means, for calendar year 2000 through 2009, inclusive, and only for such years, allocations made by the Administrator pursuant to section 7651b of this title, subsections (a)(2), (b)(2), (c)(4), (d)(3) (except as otherwise provided therein), and (h)(2) of section 7651d of this title, and section 7651e of this title.
(July 14, 1955, ch. 360, title IV, § 402, as added Pub. L. 101–549, title IV, § 401, Nov. 15, 1990, 104 Stat. 2585.)
§ 7651b. Sulfur dioxide allowance program for existing and new units
(a) Allocations of annual allowances for existing and new units
(1)1
1
For the emission limitation programs under this subchapter, the Administrator shall allocate annual allowances for the unit, to be held or distributed by the designated representative of the owner or operator of each affected unit at an affected source in accordance with this subchapter, in an amount equal to the annual tonnage emission limitation calculated under section 7651c, 7651d, 7651e, 7651h, or 7651i of this title except as otherwise specifically provided elsewhere in this subchapter. Except as provided in sections 7651d(a)(2), 7651d(a)(3), 7651h and 7651i of this title, beginning
(b) Allowance transfer system
(c) Interpollutant trading
(d) Allowance tracking system
(1) The Administrator shall promulgate, not later than 18 months after November 15, 1990, a system for issuing, recording, and tracking allowances, which shall specify all necessary procedures and requirements for an orderly and competitive functioning of the allowance system. All allowance allocations and transfers shall, upon recordation by the Administrator, be deemed a part of each unit’s permit requirements pursuant to section 7651g of this title, without any further permit review and revision.
(2) In order to insure electric reliability, such regulations shall not prohibit or affect temporary increases and decreases in emissions within utility systems, power pools, or utilities entering into allowance pool agreements, that result from their operations, including emergencies and central dispatch, and such temporary emissions increases and decreases shall not require transfer of allowances among units nor shall it require recordation. The owners or operators of such units shall act through a designated representative. Notwithstanding the preceding sentence, the total tonnage of emissions in any calendar year (calculated at the end thereof) from all units in such a utility system, power pool, or allowance pool agreements shall not exceed the total allowances for such units for the calendar year concerned.
(e) New utility units
(f) Nature of allowances
(g) Prohibition
(h) Competitive bidding for power supply
(i) Applicability of antitrust laws
(1) Nothing in this section affects—
(A) the applicability of the antitrust laws to the transfer, use, or sale of allowances, or
(B) the authority of the Federal Energy Regulatory Commission under any provision of law respecting unfair methods of competition or anticompetitive acts or practices.
(2) As used in this section, “antitrust laws” means those Acts set forth in section 12 of title 15.
(j) Public Utility Holding Company Act
(July 14, 1955, ch. 360, title IV, § 403, as added Pub. L. 101–549, title IV, § 401, Nov. 15, 1990, 104 Stat. 2589.)
§ 7651c. Phase I sulfur dioxide requirements
(a) Emission limitations
(1) After January 1, 1995, each source that includes one or more affected units listed in table A is an affected source under this section. After January 1, 1995, it shall be unlawful for any affected unit (other than an eligible phase I unit under subsection (d)(2)) to emit sulfur dioxide in excess of the tonnage limitation stated as a total number of allowances in table A for phase I, unless (A) the emissions reduction requirements applicable to such unit have been achieved pursuant to subsection (b) or (d), or (B) the owner or operator of such unit holds allowances to emit not less than the unit’s total annual emissions, except that, after January 1, 2000, the emissions limitations established in this section shall be superseded by those established in section 7651d of this title. The owner or operator of any unit in violation of this section shall be fully liable for such violation including, but not limited to, liability for fulfilling the obligations specified in section 7651j of this title.
(2) Not later than December 31, 1991, the Administrator shall determine the total tonnage of reductions in the emissions of sulfur dioxide from all utility units in calendar year 1995 that will occur as a result of compliance with the emissions limitation requirements of this section, and shall establish a reserve of allowances equal in amount to the number of tons determined thereby not to exceed a total of 3.50 million tons. In making such a determination, the Administrator shall compute for each unit subject to the emissions limitation requirements of this section the difference between:
(A) the product of its baseline multiplied by the lesser of each unit’s allowable 1985 emissions rate and its actual 1985 emissions rate, divided by 2,000, and
(B) the product of each unit’s baseline multiplied by 2.50 lbs/mmBtu divided by 2,000,
and sum the computations. The Administrator shall adjust the foregoing calculation to reflect projected calendar year 1995 utilization of the units subject to the emissions limitations of this subchapter that the Administrator finds would have occurred in the absence of the imposition of such requirements. Pursuant to subsection (d), the Administrator shall allocate allowances from the reserve established hereinunder until the earlier of such time as all such allowances in the reserve are allocated or December 31, 1999.
(3) In addition to allowances allocated pursuant to paragraph (1), in each calendar year beginning in 1995 and ending in 1999, inclusive, the Administrator shall allocate for each unit on Table A that is located in the States of Illinois, Indiana, or Ohio (other than units at Kyger Creek, Clifty Creek and Joppa Steam), allowances in an amount equal to 200,000 multiplied by the unit’s pro rata share of the total number of allowances allocated for all units on Table A in the 3 States (other than units at Kyger Creek, Clifty Creek, and Joppa Steam) pursuant to paragraph (1). Such allowances shall be excluded from the calculation of the reserve under paragraph (2).
(b) SubstitutionsThe owner or operator of an affected unit under subsection (a) may include in its section 7651g of this title permit application and proposed compliance plan a proposal to reassign, in whole or in part, the affected unit’s sulfur dioxide reduction requirements to any other unit(s) under the control of such owner or operator. Such proposal shall specify—
(1) the designation of the substitute unit or units to which any part of the reduction obligations of subsection (a) shall be required, in addition to, or in lieu of, any original affected units designated under such subsection;
(2) the original affected unit’s baseline, the actual and allowable 1985 emissions rate for sulfur dioxide, and the authorized annual allowance allocation stated in table A;
(3) calculation of the annual average tonnage for calendar years 1985, 1986, and 1987, emitted by the substitute unit or units, based on the baseline for each unit, as defined in section 7651a(d) 1
1 So in original. Probably should be section “7651a(4)”.
of this title, multiplied by the lesser of the unit’s actual or allowable 1985 emissions rate;
(4) the emissions rates and tonnage limitations that would be applicable to the original and substitute affected units under the substitution proposal;
(5) documentation, to the satisfaction of the Administrator, that the reassigned tonnage limits will, in total, achieve the same or greater emissions reduction than would have been achieved by the original affected unit and the substitute unit or units without such substitution; and
(6) such other information as the Administrator may require.
(c) Administrator’s action on substitution proposals
(1) The Administrator shall take final action on such substitution proposal in accordance with section 7651g(c) of this title if the substitution proposal fulfills the requirements of this subsection. The Administrator may approve a substitution proposal in whole or in part and with such modifications or conditions as may be consistent with the orderly functioning of the allowance system and which will ensure the emissions reductions contemplated by this subchapter. If a proposal does not meet the requirements of subsection (b), the Administrator shall disapprove it. The owner or operator of a unit listed in table A shall not substitute another unit or units without the prior approval of the Administrator.
(2) Upon approval of a substitution proposal, each substitute unit, and each source with such unit, shall be deemed affected under this subchapter, and the Administrator shall issue a permit to the original and substitute affected source and unit in accordance with the approved substitution plan and section 7651g of this title. The Administrator shall allocate allowances for the original and substitute affected units in accordance with the approved substitution proposal pursuant to section 7651b of this title. It shall be unlawful for any source or unit that is allocated allowances pursuant to this section to emit sulfur dioxide in excess of the emissions limitation provided for in the approved substitution permit and plan unless the owner or operator of each unit governed by the permit and approved substitution plan holds allowances to emit not less than the units 2
2 So in original. Probably should be “unit’s”.
total annual emissions. The owner or operator of any original or substitute affected unit operated in violation of this subsection shall be fully liable for such violation, including liability for fulfilling the obligations specified in section 7651j of this title
. If a substitution proposal is disapproved, the Administrator shall allocate allowances to the original affected unit or units in accordance with subsection (a).
(d) Eligible phase I extension units
(1) The owner or operator of any affected unit subject to an emissions limitation requirement under this section may petition the Administrator in its permit application under section 7651g of this title for an extension of 2 years of the deadline for meeting such requirement, provided that the owner or operator of any such unit holds allowances to emit not less than the unit’s total annual emissions for each of the 2 years of the period of extension. To qualify for such an extension, the affected unit must either employ a qualifying phase I technology, or transfer its phase I emissions reduction obligation to a unit employing a qualifying phase I technology. Such transfer shall be accomplished in accordance with a compliance plan, submitted and approved under section 7651g of this title, that shall govern operations at all units included in the transfer, and that specifies the emissions reduction requirements imposed pursuant to this subchapter.
(2) Such extension proposal shall—
(A) specify the unit or units proposed for designation as an eligible phase I extension unit;
(B) provide a copy of an executed contract, which may be contingent upon the Administrator approving the proposal, for the design engineering, and construction of the qualifying phase I technology for the extension unit, or for the unit or units to which the extension unit’s emission reduction obligation is to be transferred;
(C) specify the unit’s or units’ baseline, actual 1985 emissions rate, allowable 1985 emissions rate, and projected utilization for calendar years 1995 through 1999;
(D) require CEMS on both the eligible phase I extension unit or units and the transfer unit or units beginning no later than January 1, 1995; and
(E) specify the emission limitation and number of allowances expected to be necessary for annual operation after the qualifying phase I technology has been installed.
(3) The Administrator shall review and take final action on each extension proposal in order of receipt, consistent with section 7651g of this title, and for an approved proposal shall designate the unit or units as an eligible phase I extension unit. The Administrator may approve an extension proposal in whole or in part, and with such modifications or conditions as may be necessary, consistent with the orderly functioning of the allowance system, and to ensure the emissions reductions contemplated by the 3
3 So in original. Probably should be “this”.
subchapter.
(4) In order to determine the number of proposals eligible for allocations from the reserve under subsection (a)(2) and the number of allowances remaining available after each proposal is acted upon, the Administrator shall reduce the total number of allowances remaining available in the reserve by the number of allowances calculated according to subparagraphs (A), (B) and (C) until either no allowances remain available in the reserve for further allocation or all approved proposals have been acted upon. If no allowances remain available in the reserve for further allocation before all proposals have been acted upon by the Administrator, any pending proposals shall be disapproved. The Administrator shall calculate allowances equal to—
(A) the difference between the lesser of the average annual emissions in calendar years 1988 and 1989 or the projected emissions tonnage for calendar year 1995 of each eligible phase I extension unit, as designated under paragraph (3), and the product of the unit’s baseline multiplied by an emission rate of 2.50 lbs/mmBtu, divided by 2,000;
(B) the difference between the lesser of the average annual emissions in calendar years 1988 and 1989 or the projected emissions tonnage for calendar year 1996 of each eligible phase I extension unit, as designated under paragraph (3), and the product of the unit’s baseline multiplied by an emission rate of 2.50 lbs/mmBtu, divided by 2,000; and
(C) the amount by which (i) the product of each unit’s baseline multiplied by an emission rate of 1.20 lbs/mmBtu, divided by 2,000, exceeds (ii) the tonnage level specified under subparagraph (E) of paragraph (2) of this subsection multiplied by a factor of 3.
(5) Each eligible Phase I extension unit shall receive allowances determined under subsection (a)(1) or (c) of this section. In addition, for calendar year 1995, the Administrator shall allocate to each eligible Phase I extension unit, from the allowance reserve created pursuant to subsection (a)(2), allowances equal to the difference between the lesser of the average annual emissions in calendar years 1988 and 1989 or its projected emissions tonnage for calendar year 1995 and the product of the unit’s baseline multiplied by an emission rate of 2.50 lbs/mmBtu, divided by 2,000. In calendar year 1996, the Administrator shall allocate for each eligible unit, from the allowance reserve created pursuant to subsection (a)(2) of this section, allowances equal to the difference between the lesser of the average annual emissions in calendar years 1988 and 1989 or its projected emissions tonnage for calendar year 1996 and the product of the unit’s baseline multiplied by an emission rate of 2.50 lbs/mmBtu, divided by 2,000. It shall be unlawful for any source or unit subject to an approved extension plan under this subsection to emit sulfur dioxide in excess of the emissions limitations provided for in the permit and approved extension plan, unless the owner or operator of each unit governed by the permit and approved plan holds allowances to emit not less than the unit’s total annual emissions.
(6) In addition to allowances specified in paragraph (5), the Administrator shall allocate for each eligible Phase I extension unit employing qualifying Phase I technology, for calendar years 1997, 1998, and 1999, additional allowances, from any remaining allowances in the reserve created pursuant to subsection (a)(2), following the reduction in the reserve provided for in paragraph (4), not to exceed the amount by which (A) the product of each eligible unit’s baseline times an emission rate of 1.20 lbs/mmBtu, divided by 2,000, exceeds (B) the tonnage level specified under subparagraph (E) of paragraph (2) of this subsection.
(7) After January 1, 1997, in addition to any liability under this chapter, including under section 7651j of this title, if any eligible phase I extension unit employing qualifying phase I technology or any transfer unit under this subsection emits sulfur dioxide in excess of the annual tonnage limitation specified in the extension plan, as approved in paragraph (3) of this subsection, the Administrator shall, in the calendar year following such excess, deduct allowances equal to the amount of such excess from such unit’s annual allowance allocation.
(e) Allocation of allowances
(1) In the case of a unit that receives authorization from the Governor of the State in which such unit is located to make reductions in the emissions of sulfur dioxide prior to calendar year 1995 and that is part of a utility system that meets the following requirements: (A) the total coal-fired generation within the utility system as a percentage of total system generation decreased by more than 20 percent between January 1, 1980, and December 31, 1985; and (B) the weighted capacity factor of all coal-fired units within the utility system averaged over the period from January 1, 1985, through December 31, 1987, was below 50 percent, the Administrator shall allocate allowances under this paragraph for the unit pursuant to this subsection. The Administrator shall allocate allowances for a unit that is an affected unit pursuant to section 7651d of this title (but is not also an affected unit under this section) and part of a utility system that includes 1 or more affected units under section 7651d of this title for reductions in the emissions of sulfur dioxide made during the period 1995–1999 if the unit meets the requirements of this subsection and the requirements of the preceding sentence, except that for the purposes of applying this subsection to any such unit, the prior year concerned as specified below, shall be any year after January 1, 1995 but prior to January 1, 2000.
(2) In the case of an affected unit under this section described in subparagraph (A),4
4 So in original. Probably should be “paragraph (1)”.
the allowances allocated under this subsection for early reductions in any prior year may not exceed the amount which (A) the product of the unit’s baseline multiplied by the unit’s 1985 actual sulfur dioxide emission rate (in lbs. per mmBtu), divided by 2,000, exceeds (B) the allowances specified for such unit in Table A. In the case of an affected unit under section 7651d of this title described in subparagraph (A),4 the allowances awarded under this subsection for early reductions in any prior year may not exceed the amount by which (i) the product of the quantity of fossil fuel consumed by the unit (in mmBtu) in the prior year multiplied by the lesser of 2.50 or the most stringent emission rate (in lbs. per mmBtu) applicable to the unit under the applicable implementation plan, divided by 2,000, exceeds (ii) the unit’s actual tonnage of sulfur dioxide emission for the prior year concerned. Allowances allocated under this subsection for units referred to in subparagraph (A) 4 may be allocated only for emission reductions achieved as a result of physical changes or changes in the method of operation made after November 15, 1990, including changes in the type or quality of fossil fuel consumed.
(3) In no event shall the provisions of this paragraph 5
5 So in original. Probably should be “subsection”.
be interpreted as an event of force majeur 6
6 So in original. Probably should be “majeure”.
or a commercial impractibility 7
7 So in original. Probably should be “impracticability”.
or in any other way as a basis for excused nonperformance by a utility system under a coal sales contract in effect before November 15, 1990.

Table A.—Affected Sources and Units in Phase I and Their Sulfur Dioxide Allowances (tons)

State

Plant Name

Generator

Phase I Allowances

Alabama

Colbert

1

2

3

4

5

13,570

15,310

15,400

15,410

37,180

E.C. Gaston

1

2

3

4

5

18,100

18,540

18,310

19,280

59,840

Florida

Big Bend

1

2

3

28,410

27,100

26,740

Crist

6

7

19,200

31,680

Georgia

Bowen

1

2

3

4

56,320

54,770

71,750

71,740

Hammond

1

2

3

4

8,780

9,220

8,910

37,640

J. McDonough

1

2

19,910

20,600

Wansley

1

2

70,770

65,430

Yates

1

2

3

4

5

6

7

7,210

7,040

6,950

8,910

9,410

24,760

21,480

Illinois

Baldwin

1

2

3

42,010

44,420

42,550

Coffeen

1

2

11,790

35,670

Grand Tower

4

5,910

Hennepin

2

18,410

Joppa Steam

1

2

3

4

5

6

12,590

10,770

12,270

11,360

11,420

10,620

Kincaid

1

2

31,530

33,810

Meredosia

3

13,890

Vermilion

2

8,880

Indiana

Bailly

7

8

(f) Energy conservation and renewable energy
(1) DefinitionsAs used in this subsection:
(A) Qualified energy conservation measure
(B) Qualified renewable energy
(C) Electric utility
(2) Allowances for emissions avoided through energy conservation and renewable energy
(A) In general
(B) Requirements for issuanceThe Administrator shall allocate allowances to an electric utility under this subsection only if all of the following requirements are met:
(i) Such electric utility is paying for the qualified energy conservation measures or qualified renewable energy directly or through purchase from another person.
(ii) The emissions of sulfur dioxide avoided through the use of qualified energy conservation measures or qualified renewable energy are quantified in accordance with regulations promulgated by the Administrator under this subsection.
(iii)(I) Such electric utility has adopted and is implementing a least cost energy conservation and electric power plan which evaluates a range of resources, including new power supplies, energy conservation, and renewable energy resources, in order to meet expected future demand at the lowest system cost.(II) The qualified energy conservation measures or qualified renewable energy, or both, are consistent with that plan.(III) Electric utilities subject to the jurisdiction of a State regulatory authority must have such plan approved by such authority. For electric utilities not subject to the jurisdiction of a State regulatory authority such plan shall be approved by the entity with rate-making authority for such utility.
(iv) In the case of qualified energy conservation measures undertaken by a State regulated electric utility, the Secretary of Energy certifies that the State regulatory authority with jurisdiction over the electric rates of such electric utility has established rates and charges which ensure that the net income of such electric utility after implementation of specific cost effective energy conservation measures is at least as high as such net income would have been if the energy conservation measures had not been implemented. Upon the date of any such certification by the Secretary of Energy, all allowances which, but for this paragraph, would have been allocated under subparagraph (A) before such date, shall be allocated to the electric utility. This clause is not a requirement for qualified renewable energy.
(v) Such utility or any subsidiary of the utility’s holding company owns or operates at least one affected unit.
(C) Period of applicability
(D) Determination of avoided emissions
(i)8
8 So in original. There is no cl. (ii).
Application
In order to receive allowances under this subsection, an electric utility shall make an application which—(I) designates the qualified energy conservation measures implemented and the qualified renewable energy sources used for purposes of avoiding emissions,9
9 So in original. The comma probably should be a semicolon.
(II) calculates, in accordance with subparagraphs (F) and (G), the number of tons of emissions avoided by reason of the implementation of such measures or the use of such renewable energy sources; and(III) demonstrates that the requirements of subparagraph (B) have been met.
 Such application for allowances by a State-regulated electric utility shall require approval by the State regulatory authority with jurisdiction over such electric utility. The authority shall review the application for accuracy and compliance with this subsection and the rules under this subsection. Electric utilities whose retail rates are not subject to the jurisdiction of a State regulatory authority shall apply directly to the Administrator for such approval.
(E) Avoided emissions from qualified energy conservation measuresFor the purposes of this subsection, the emission tonnage deemed avoided by reason of the implementation of qualified energy conservation measures for any calendar year shall be a tonnage equal to the product of multiplying—
(i) the kilowatt hours that would otherwise have been supplied by the utility during such year in the absence of such qualified energy conservation measures, by
(ii) 0.004,
and dividing by 2,000.
(F) Avoided emissions from the use of qualified renewable energyThe emissions tonnage deemed avoided by reason of the use of qualified renewable energy by an electric utility for any calendar year shall be a tonnage equal to the product of multiplying—
(i) the actual kilowatt hours generated by, or purchased from, qualified renewable energy, by
(ii) 0.004,
and dividing by 2,000.
(G) Prohibitions
(i) No allowances shall be allocated under this subsection for the implementation of programs that are exclusively informational or educational in nature.
(ii) No allowances shall be allocated for energy conservation measures or renewable energy that were operational before January 1, 1992.
(3) Savings provision
(4) Regulations
(g) Conservation and Renewable Energy Reserve
(h) Alternative allowance allocation for units in certain utility systems with optional baseline
(1) Optional baseline for units in certain systemsIn the case of a unit subject to the emissions limitation requirements of this section which (as of November 15, 1990)—
(A) has an emission rate below 1.0 lbs/mmBtu,
(B) has decreased its sulfur dioxide emissions rate by 60 percent or greater since 1980, and
(C) is part of a utility system which has a weighted average sulfur dioxide emissions rate for all fossil fueled-fired units below 1.0 lbs/mmBtu,
at the election of the owner or operator of such unit, the unit’s baseline may be calculated (i) as provided under section 7651a(d) 1 of this title, or (ii) by utilizing the unit’s average annual fuel consumption at a 60 percent capacity factor. Such election shall be made no later than March 1, 1991.
(2) Allowance allocation
(July 14, 1955, ch. 360, title IV, § 404, as added Pub. L. 101–549, title IV, § 401, Nov. 15, 1990, 104 Stat. 2592.)
§ 7651d. Phase II sulfur dioxide requirements
(a) Applicability
(1) After January 1, 2000, each existing utility unit as provided below is subject to the limitations or requirements of this section. Each utility unit subject to an annual sulfur dioxide tonnage emission limitation under this section is an affected unit under this subchapter. Each source that includes one or more affected units is an affected source. In the case of an existing unit that was not in operation during calendar year 1985, the emission rate for a calendar year after 1985, as determined by the Administrator, shall be used in lieu of the 1985 rate. The owner or operator of any unit operated in violation of this section shall be fully liable under this chapter for fulfilling the obligations specified in section 7651j of this title.
(2) In addition to basic Phase II allowance allocations, in each year beginning in calendar year 2000 and ending in calendar year 2009, inclusive, the Administrator shall allocate up to 530,000 Phase II bonus allowances pursuant to subsections (span)(2), (c)(4), (d)(3)(A) and (B), and (h)(2) of this section and section 7651e of this title. Not later than June 1, 1998, the Administrator shall calculate, for each unit granted an extension pursuant to section 7651h of this title the difference between (A) the number of allowances allocated for the unit in calendar year 2000, and (B) the product of the unit’s baseline multiplied by 1.20 lbs/mmBtu, divided by 2000, and sum the computations. In each year, beginning in calendar year 2000 and ending in calendar year 2009, inclusive, the Administrator shall deduct from each unit’s basic Phase II allowance allocation its pro rata share of 10 percent of the sum calculated pursuant to the preceding sentence.
(3) In addition to basic Phase II allowance allocations and Phase II bonus allowance allocations, beginning January 1, 2000, the Administrator shall allocate for each unit listed on Table A in section 7651c of this title (other than units at Kyger Creek, Clifty Creek, and Joppa Steam) and located in the States of Illinois, Indiana, Ohio, Georgia, Alabama, Missouri, Pennsylvania, West Virginia, Kentucky, or Tennessee allowances in an amount equal to 50,000 multiplied by the unit’s pro rata share of the total number of basic allowances allocated for all units listed on Table A (other than units at Kyger Creek, Clifty Creek, and Joppa Steam). Allowances allocated pursuant to this paragraph shall not be subject to the 8,900,000 ton limitation in
(span) Units equal to, or above, 75 MWe and 1.20 lbs/mmBtu
(1) Except as otherwise provided in paragraph (3), after January 1, 2000, it shall be unlawful for any existing utility unit that serves a generator with nameplate capacity equal to, or greater, than 75 MWe and an actual 1985 emission rate equal to or greater than 1.20 lbs/mmBtu to exceed an annual sulfur dioxide tonnage emission limitation equal to the product of the unit’s baseline multiplied by an emission rate equal to 1.20 lbs/mmBtu, divided by 2,000, unless the owner or operator of such unit holds allowances to emit not less than the unit’s total annual emissions.
(2) In addition to allowances allocated pursuant to paragraph (1) and section 7651span(a)(1) of this title as basic Phase II allowance allocations, beginning January 1, 2000, and for each calendar year thereafter until and including 2009, the Administrator shall allocate annually for each unit subject to the emissions limitation requirements of paragraph (1) with an actual 1985 emissions rate greater than 1.20 lbs/mmBtu and less than 2.50 lbs/mmBtu and a baseline capacity factor of less than 60 percent, allowances from the reserve created pursuant to subsection (a)(2) in an amount equal to 1.20 lbs/mmBtu multiplied by 50 percent of the difference, on a Btu basis, between the unit’s baseline and the unit’s fuel consumption at a 60 percent capacity factor.
(3) After January 1, 2000, it shall be unlawful for any existing utility unit with an actual 1985 emissions rate equal to or greater than 1.20 lbs/mmBtu whose annual average fuel consumption during 1985, 1986, and 1987 on a Btu basis exceeded 90 percent in the form of lignite coal which is located in a State in which, as of July 1, 1989, no county or portion of a county was designated nonattainment under section 7407 of this title for any pollutant subject to the requirements of section 7409 of this title to exceed an annual sulfur dioxide tonnage limitation equal to the product of the unit’s baseline multiplied by the lesser of the unit’s actual 1985 emissions rate or its allowable 1985 emissions rate, divided by 2,000, unless the owner or operator of such unit holds allowances to emit not less than the unit’s total annual emissions.
(4) After January 1, 2000, the Administrator shall allocate annually for each unit, subject to the emissions limitation requirements of paragraph (1), which is located in a State with an installed electrical generating capacity of more than 30,000,000 kw in 1988 and for which was issued a prohibition order or a proposed prohibition order (from burning oil), which unit subsequently converted to coal between January 1, 1980 and December 31, 1985, allowances equal to the difference between (A) the product of the unit’s annual fuel consumption, on a Btu basis, at a 65 percent capacity factor multiplied by the lesser of its actual or allowable emissions rate during the first full calendar year after conversion, divided by 2,000, and (B) the number of allowances allocated for the unit pursuant to paragraph (1): Provided, That the number of allowances allocated pursuant to this paragraph shall not exceed an annual total of five thousand. If necessary to meeting the restriction imposed in the preceding sentence the Administrator shall reduce, pro rata, the annual allowances allocated for each unit under this paragraph.
(c) Coal or oil-fired units below 75 MWe and above 1.20 lbs/mmBtu
(1) Except as otherwise provided in paragraph (3), after January 1, 2000, it shall be unlawful for a coal or oil-fired existing utility unit that serves a generator with nameplate capacity of less than 75 MWe and an actual 1985 emission rate equal to, or greater than, 1.20 lbs/mmBtu and which is a unit owned by a utility operating company whose aggregate nameplate fossil fuel steam-electric capacity is, as of December 31, 1989, equal to, or greater than, 250 MWe to exceed an annual sulfur dioxide emissions limitation equal to the product of the unit’s baseline multiplied by an emission rate equal to 1.20 lbs/mmBtu, divided by 2,000, unless the owner or operator of such unit holds allowances to emit not less than the unit’s total annual emissions.
(2) After January 1, 2000, it shall be unlawful for a coal or oil-fired existing utility unit that serves a generator with nameplate capacity of less than 75 MWe and an actual 1985 emission rate equal to, or greater than, 1.20 lbs/mmBtu (excluding units subject to section 7411 of this title or to a federally enforceable emissions limitation for sulfur dioxide equivalent to an annual rate of less than 1.20 lbs/mmBtu) and which is a unit owned by a utility operating company whose aggregate nameplate fossil fuel steam-electric capacity is, as of December 31, 1989, less than 250 MWe, to exceed an annual sulfur dioxide tonnage emissions limitation equal to the product of the unit’s baseline multiplied by the lesser of its actual 1985 emissions rate or its allowable 1985 emissions rate, divided by 2,000, unless the owner or operator of such unit holds allowances to emit not less than the unit’s total annual emissions.
(3) After January 1, 2000, it shall be unlawful for any existing utility unit with a nameplate capacity below 75 MWe and an actual 1985 emissions rate equal to, or greater than, 1.20 lbs/mmBtu which became operational on or before December 31, 1965, which is owned by a utility operating company with, as of December 31, 1989, a total fossil fuel steam-electric generating capacity greater than 250 MWe, and less than 450 MWe which serves fewer than 78,000 electrical customers as of November 15, 1990, to exceed an annual sulfur dioxide emissions tonnage limitation equal to the product of its baseline multiplied by the lesser of its actual or allowable 1985 emission rate, divided by 2,000, unless the owner or operator holds allowances to emit not less than the units 1
1 So in original. Probably should be “unit’s”.
total annual emissions. After January 1, 2010, it shall be unlawful for each unit subject to the emissions limitation requirements of this paragraph to exceed an annual emissions tonnage limitation equal to the product of its baseline multiplied by an emissions rate of 1.20 lbs/mmBtu, divided by 2,000, unless the owner or operator holds allowances to emit not less than the unit’s total annual emissions.
(4) In addition to allowances allocated pursuant to paragraph (1) and section 7651span(a)(1) of this title as basic Phase II allowance allocations, beginning January 1, 2000, and for each calendar year thereafter until and including 2009, inclusive, the Administrator shall allocate annually for each unit subject to the emissions limitation requirements of paragraph (1) with an actual 1985 emissions rate equal to, or greater than, 1.20 lbs/mmBtu and less than 2.50 lbs/mmBtu and a baseline capacity factor of less than 60 percent, allowances from the reserve created pursuant to subsection (a)(2) in an amount equal to 1.20 lbs/mmBtu multiplied by 50 percent of the difference, on a Btu basis, between the unit’s baseline and the unit’s fuel consumption at a 60 percent capacity factor.
(5) After January 1, 2000, it shall be unlawful for any existing utility unit with a nameplate capacity below 75 MWe and an actual 1985 emissions rate equal to, or greater than, 1.20 lbs/mmBtu which is part of an electric utility system which, as of November 15, 1990, (A) has at least 20 percent of its fossil-fuel capacity controlled by flue gas desulfurization devices, (B) has more than 10 percent of its fossil-fuel capacity consisting of coal-fired units of less than 75 MWe, and (C) has large units (greater than 400 MWe) all of which have difficult or very difficult FGD Retrofit Cost Factors (according to the Emissions and the FGD Retrofit Feasibility at the 200 Top Emitting Generating Stations, prepared for the United States Environmental Protection Agency on January 10, 1986) to exceed an annual sulfur dioxide emissions tonnage limitation equal to the product of its baseline multiplied by an emissions rate of 2.5 lbs/mmBtu, divided by 2,000, unless the owner or operator holds allowances to emit not less than the unit’s total annual emissions. After January 1, 2010, it shall be unlawful for each unit subject to the emissions limitation requirements of this paragraph to exceed an annual emissions tonnage limitation equal to the product of its baseline multiplied by an emissions rate of 1.20 lbs/mmBtu, divided by 2,000, unless the owner or operator holds for use allowances to emit not less than the unit’s total annual emissions.
(d) Coal-fired units below 1.20 lbs/mmBtu
(1) After January 1, 2000, it shall be unlawful for any existing coal-fired utility unit the lesser of whose actual or allowable 1985 sulfur dioxide emissions rate is less than 0.60 lbs/mmBtu to exceed an annual sulfur dioxide tonnage emission limitation equal to the product of the unit’s baseline multiplied by (A) the lesser of 0.60 lbs/mmBtu or the unit’s allowable 1985 emissions rate, and (B) a numerical factor of 120 percent, divided by 2,000, unless the owner or operator of such unit holds allowances to emit not less than the unit’s total annual emissions.
(2) After January 1, 2000, it shall be unlawful for any existing coal-fired utility unit the lesser of whose actual or allowable 1985 sulfur dioxide emissions rate is equal to, or greater than, 0.60 lbs/mmBtu and less than 1.20 lbs/mmBtu to exceed an annual sulfur dioxide tonnage emissions limitation equal to the product of the unit’s baseline multiplied by (A) the lesser of its actual 1985 emissions rate or its allowable 1985 emissions rate, and (B) a numerical factor of 120 percent, divided by 2,000, unless the owner or operator of such unit holds allowances to emit not less than the unit’s total annual emissions.
(3)
(A) In addition to allowances allocated pursuant to paragraph (1) and section 7651span(a)(1) of this title as basic Phase II allowance allocations, at the election of the designated representative of the operating company, beginning January 1, 2000, and for each calendar year thereafter until and including 2009, the Administrator shall allocate annually for each unit subject to the emissions limitation requirements of paragraph (1) allowances from the reserve created pursuant to subsection (a)(2) in an amount equal to the amount by which (i) the product of the lesser of 0.60 lbs/mmBtu or the unit’s allowable 1985 emissions rate multiplied by the unit’s baseline adjusted to reflect operation at a 60 percent capacity factor, divided by 2,000, exceeds (ii) the number of allowances allocated for the unit pursuant to paragraph (1) and section 7651span(a)(1) of this title as basic Phase II allowance allocations.
(B) In addition to allowances allocated pursuant to paragraph (2) and section 7651span(a)(1) of this title as basic Phase II allowance allocations, at the election of the designated representative of the operating company, beginning January 1, 2000, and for each calendar year thereafter until and including 2009, the Administrator shall allocate annually for each unit subject to the emissions limitation requirements of paragraph (2) allowances from the reserve created pursuant to subsection (a)(2) in an amount equal to the amount by which (i) the product of the lesser of the unit’s actual 1985 emissions rate or its allowable 1985 emissions rate multiplied by the unit’s baseline adjusted to reflect operation at a 60 percent capacity factor, divided by 2,000, exceeds (ii) the number of allowances allocated for the unit pursuant to paragraph (2) and section 7651span(a)(1) of this title as basic Phase II allowance allocations.
(C) An operating company with units subject to the emissions limitation requirements of this subsection may elect the allocation of allowances as provided under subparagraphs (A) and (B). Such election shall apply to the annual allowance allocation for each and every unit in the operating company subject to the emissions limitation requirements of this subsection. The Administrator shall allocate allowances pursuant to subparagraphs (A) and (B) only in accordance with this subparagraph.
(4) Notwithstanding any other provision of this section, at the election of the owner or operator, after January 1, 2000, the Administrator shall allocate in lieu of allocation, pursuant to paragraph (1), (2), (3), (5), or (6),2
2 So in original. This subsection does not contain a paragraph (6).
allowances for a unit subject to the emissions limitation requirements of this subsection which commenced commercial operation on or after January 1, 1981 and before December 31, 1985, which was subject to, and in compliance with, section 7411 of this title in an amount equal to the unit’s annual fuel consumption, on a Btu basis, at a 65 percent capacity factor multiplied by the unit’s allowable 1985 emissions rate, divided by 2,000.
(5) For the purposes of this section, in the case of an oil- and gas-fired unit which has been awarded a clean coal technology demonstration grant as of January 1, 1991, by the United States Department of Energy, beginning January 1, 2000, the Administrator shall allocate for the unit allowances in an amount equal to the unit’s baseline multiplied by 1.20 lbs/mmBtu, divided by 2,000.
(e) Oil and gas-fired units equal to or greater than 0.60 lbs/mmBtu and less than 1.20 lbs/mmBtu
(f) Oil and gas-fired units less than 0.60 lbs/mmBtu
(1) After January 1, 2000, it shall be unlawful for any oil and gas-fired existing utility unit the lesser of whose actual or allowable 1985 emission rate is less than 0.60 lbs/mmBtu and whose average annual fuel consumption during the period 1980 through 1989 on a Btu basis was 90 percent or less in the form of natural gas to exceed an annual sulfur dioxide tonnage emissions limitation equal to the product of the unit’s baseline multiplied by (A) the lesser of 0.60 lbs/mmBtu or the unit’s allowable 1985 emissions, and (B) a numerical factor of 120 percent, divided by 2,000, unless the owner or operator of such unit holds allowances to emit not less than the unit’s total annual emissions.
(2) In addition to allowances allocated pursuant to paragraph (1) as basic Phase II allowance allocations and section 7651span(a)(1) of this title, beginning January 1, 2000, the Administrator shall,3
3 So in original. The words “the Administrator shall,” probably should not appear.
in the case of any unit operated by a utility that furnishes electricity, electric energy, steam, and natural gas within an area consisting of a city and 1 contiguous county, and in the case of any unit owned by a State authority, the output of which unit is furnished within that same area consisting of a city and 1 contiguous county, the Administrator shall allocate for each unit in the utility its pro rata share of 7,000 allowances and for each unit in the State authority its pro rata share of 2,000 allowances.
(g) Units that commence operation between 1986 and December 31, 1995
(1) After January 1, 2000, it shall be unlawful for any utility unit that has commenced commercial operation on or after January 1, 1986, but not later than September 30, 1990 to exceed an annual tonnage emission limitation equal to the product of the unit’s annual fuel consumption, on a Btu basis, at a 65 percent capacity factor multiplied by the unit’s allowable 1985 sulfur dioxide emission rate (converted, if necessary, to pounds per mmBtu), divided by 2,000 unless the owner or operator of such unit holds allowances to emit not less than the unit’s total annual emissions.
(2) After January 1, 2000, the Administrator shall allocate allowances pursuant to section 7651span of this title to each unit which is listed in table B of this paragraph in an annual amount equal to the amount specified in table B.

TABLE B

Unit

Allowances

Brandon Shores

8,907

Miller 4

9,197

TNP One 2

4,000

Zimmer 1

18,458

Spruce 1

7,647

Clover 1

2,796

Clover 2

2,796

Twin Oak 2

1,760

Twin Oak 1

9,158

Cross 1

6,401

Malakoff 1

1,759

Notwithstanding any other paragraph of this subsection, for units subject to this paragraph, the Administrator shall not allocate allowances pursuant to any other paragraph of this subsection, Provided 4

4 So in original. Probably should not be capitalized.
that the owner or operator of a unit listed on Table B may elect an allocation of allowances under another paragraph of this subsection in lieu of an allocation under this paragraph.

(3) Beginning January 1, 2000, the Administrator shall allocate to the owner or operator of any utility unit that commences commercial operation, or has commenced commercial operation, on or after October 1, 1990, but not later than December 31, 1992 allowances in an amount equal to the product of the unit’s annual fuel consumption, on a Btu basis, at a 65 percent capacity factor multiplied by the lesser of 0.30 lbs/mmBtu or the unit’s allowable sulfur dioxide emission rate (converted, if necessary, to pounds per mmBtu), divided by 2,000.
(4) Beginning January 1, 2000, the Administrator shall allocate to the owner or operator of any utility unit that has commenced construction before December 31, 1990 and that commences commercial operation between January 1, 1993 and December 31, 1995, allowances in an amount equal to the product of the unit’s annual fuel consumption, on a Btu basis, at a 65 percent capacity factor multiplied by the lesser of 0.30 lbs/mmBtu or the unit’s allowable sulfur dioxide emission rate (converted, if necessary, to pounds per mmBtu), divided by 2,000.
(5) After January 1, 2000, it shall be unlawful for any existing utility unit that has completed conversion from predominantly gas fired existing operation to coal fired operation between January 1, 1985 and December 31, 1987, for which there has been allocated a proposed or final prohibition order pursuant to section 301(span) 5
5 See References in Text note below.
of the Powerplant and Industrial Fuel Use Act of 1978 (42 U.S.C. 8301 et seq,6
6 So in original. Probably should be “seq.,”.
repealed 1987) to exceed an annual sulfur dioxide tonnage emissions limitation equal to the product of the unit’s annual fuel consumption, on a Btu basis, at a 65 percent capacity factor multiplied by the lesser of 1.20 lbs/mmBtu or the unit’s allowable 1987 sulfur dioxide emissions rate, divided by 2,000, unless the owner or operator of such unit has obtained allowances equal to its actual emissions.
(6)
(A)7
7 So in original. No subpar. (B) has been enacted.
Unless the Administrator has approved a designation of such facility under section 7651i of this title, the provisions of this subchapter shall not apply to a “qualifying small power production facility” or “qualifying cogeneration facility” (within the meaning of section 796(17)(C) or 796(18)(B) of title 16) or to a “new independent power production facility” as defined in section 7651o of this title except 8
8 So in original. Probably should be preceded by a comma.
that clause (iii) 9
9 So in original. Probably means clause “(C)”.
of such definition in section 7651o of this title shall not apply for purposes of this paragraph if, as of November 15, 1990,
(i) an applicable power sales agreement has been executed;
(ii) the facility is the subject of a State regulatory authority order requiring an electric utility to enter into a power sales agreement with, purchase capacity from, or (for purposes of establishing terms and conditions of the electric utility’s purchase of power) enter into arbitration concerning, the facility;
(iii) an electric utility has issued a letter of intent or similar instrument committing to purchase power from the facility at a previously offered or lower price and a power sales agreement is executed within a reasonable period of time; or
(iv) the facility has been selected as a winning bidder in a utility competitive bid solicitation.
(h) Oil and gas-fired units less than 10 percent oil consumed
(1) After January 1, 2000, it shall be unlawful for any oil- and gas-fired utility unit whose average annual fuel consumption during the period 1980 through 1989 on a Btu basis exceeded 90 percent in the form of natural gas to exceed an annual sulfur dioxide tonnage limitation equal to the product of the unit’s baseline multiplied by the unit’s actual 1985 emissions rate divided by 2,000 unless the owner or operator of such unit holds allowances to emit not less than the unit’s total annual emissions.
(2) In addition to allowances allocated pursuant to paragraph (1) and section 7651span(a)(1) of this title as basic Phase II allowance allocations, beginning January 1, 2000, and for each calendar year thereafter until and including 2009, the Administrator shall allocate annually for each unit subject to the emissions limitation requirements of paragraph (1) allowances from the reserve created pursuant to subsection (a)(2) of this section in an amount equal to the unit’s baseline multiplied by 0.050 lbs/mmBtu, divided by 2,000.
(3) In addition to allowances allocated pursuant to paragraph (1) and section 7651span(a)(1) of this title, beginning January 1, 2010, the Administrator shall allocate annually for each unit subject to the emissions limitation requirements of paragraph (1) allowances in an amount equal to the unit’s baseline multiplied by 0.050 lbs/mmBtu, divided by 2,000.
(i) Units in high growth States
(1) In addition to allowances allocated pursuant to this section and section 7651span(a)(1) of this title as basic Phase II allowance allocations, beginning January 1, 2000, the Administrator shall allocate annually allowances for each unit, subject to an emissions limitation requirement under this section, and located in a State that—
(A) has experienced a growth in population in excess of 25 percent between 1980 and 1988 according to State Population and Household Estimates, With Age, Sex, and Components of Change: 1981–1988 allocated by the United States Department of Commerce, and
(B) had an installed electrical generating capacity of more than 30,000,000 kw in 1988,
in an amount equal to the difference between (A) the number of allowances that would be allocated for the unit pursuant to the emissions limitation requirements of this section applicable to the unit adjusted to reflect the unit’s annual average fuel consumption on a Btu basis of any three consecutive calendar years between 1980 and 1989 (inclusive) as elected by the owner or operator and (B) the number of allowances allocated for the unit pursuant to the emissions limitation requirements of this section: Provided, That the number of allowances allocated pursuant to this subsection shall not exceed an annual total of 40,000. If necessary to meeting the 40,000 allowance restriction imposed under this subsection the Administrator shall reduce, pro rata, the additional annual allowances allocated to each unit under this subsection.
(2) Beginning January 1, 2000, in addition to allowances allocated pursuant to this section and section 7651span(a)(1) of this title as basic Phase II allowance allocations, the Administrator shall allocate annually for each unit subject to the emissions limitation requirements of subsection (span)(1), (A) the lesser of whose actual or allowable 1980 emissions rate has declined by 50 percent or more as of November 15, 1990, (B) whose actual emissions rate is less than 1.2 lbs/mmBtu as of January 1, 2000, (C) which commenced operation after January 1, 1970, (D) which is owned by a utility company whose combined commercial and industrial kilowatt-hour sales have increased by more than 20 percent between calendar year 1980 and November 15, 1990, and (E) whose company-wide fossil-fuel sulfur dioxide emissions rate has declined 40 per centum or more from 1980 to 1988, allowances in an amount equal to the difference between (i) the number of allowances that would be allocated for the unit pursuant to the emissions limitation requirements of subsection (span)(1) adjusted to reflect the unit’s annual average fuel consumption on a Btu basis for any three consecutive years between 1980 and 1989 (inclusive) as elected by the owner or operator and (ii) the number of allowances allocated for the unit pursuant to the emissions limitation requirements of subsection (span)(1) of this section: Provided, That the number of allowances allocated pursuant to this paragraph shall not exceed an annual total of 5,000. If necessary to meeting the 5,000-allowance restriction imposed in the last clause of the preceding sentence the Administrator shall reduce, pro rata, the additional allowances allocated to each unit pursuant to this paragraph.
(j) Certain municipally owned power plants
(July 14, 1955, ch. 360, title IV, § 405, as added Puspan. L. 101–549, title IV, § 401, Nov. 15, 1990, 104 Stat. 2605.)
§ 7651e. Allowances for States with emissions rates at or below 0.80 lbs/mmBtu
(a) Election of Governor
(b) Notification of Administrator
(c) Allowances after January 1, 2010
(July 14, 1955, ch. 360, title IV, § 406, as added Pub. L. 101–549, title IV, § 401, Nov. 15, 1990, 104 Stat. 2613.)
§ 7651f. Nitrogen oxides emission reduction program
(a) Applicability
(b) Emission limitations
(1) Not later than eighteen months after November 15, 1990, the Administrator shall by regulation establish annual allowable emission limitations for nitrogen oxides for the types of utility boilers listed below, which limitations shall not exceed the rates listed below: Provided, That the Administrator may set a rate higher than that listed for any type of utility boiler if the Administrator finds that the maximum listed rate for that boiler type cannot be achieved using low NOx burner technology. The maximum allowable emission rates are as follows:
(A) for tangentially fired boilers, 0.45 lb/mmBtu;
(B) for dry bottom wall-fired boilers (other than units applying cell burner technology), 0.50 lb/mmBtu.
After January 1, 1995, it shall be unlawful for any unit that is an affected unit on that date and is of the type listed in this paragraph to emit nitrogen oxides in excess of the emission rates set by the Administrator pursuant to this paragraph.
(2) Not later than January 1, 1997, the Administrator shall, by regulation, establish allowable emission limitations on a lb/mmBtu, annual average basis, for nitrogen oxides for the following types of utility boilers:
(A) wet bottom wall-fired boilers;
(B) cyclones;
(C) units applying cell burner technology;
(D) all other types of utility boilers.
The Administrator shall base such rates on the degree of reduction achievable through the retrofit application of the best system of continuous emission reduction, taking into account available technology, costs and energy and environmental impacts; and which is comparable to the costs of nitrogen oxides controls set pursuant to subsection (b)(1). Not later than January 1, 1997, the Administrator may revise the applicable emission limitations for tangentially fired and dry bottom, wall-fired boilers (other than cell burners) to be more stringent if the Administrator determines that more effective low NOx burner technology is available: Provided, That, no unit that is an affected unit pursuant to section 7651c of this title and that is subject to the requirements of subsection (b)(1), shall be subject to the revised emission limitations, if any.
(c) Revised performance standards
(1)2
2 So in original. No par. (2) has been enacted.
Not later than January 1, 1993, the Administrator shall propose revised standards of performance to section 7411 of this title for nitrogen oxides emissions from fossil-fuel fired steam generating units, including both electric utility and nonutility units. Not later than January 1, 1994, the Administrator shall promulgate such revised standards of performance. Such revised standards of performance shall reflect improvements in methods for the reduction of emissions of oxides of nitrogen.
(d) Alternative emission limitationsThe permitting authority shall, upon request of an owner or operator of a unit subject to this section, authorize an emission limitation less stringent than the applicable limitation established under subsection (b)(1) or (b)(2) upon a determination that—
(1) a unit subject to subsection (b)(1) cannot meet the applicable limitation using low NOx burner technology; or
(2) a unit subject to subsection (b)(2) cannot meet the applicable rate using the technology on which the Administrator based the applicable emission limitation.
The permitting authority shall base such determination upon a showing satisfactory to the permitting authority, in accordance with regulations established by the Administrator not later than eighteen months after November 15, 1990, that the owner or operator—
(1) has properly installed appropriate control equipment designed to meet the applicable emission rate;
(2) has properly operated such equipment for a period of fifteen months (or such other period of time as the Administrator determines through the regulations), and provides operating and monitoring data for such period demonstrating that the unit cannot meet the applicable emission rate; and
(3) has specified an emission rate that such unit can meet on an annual average basis.
The permitting authority shall issue an operating permit for the unit in question, in accordance with section 7651g of this title and part B 3
3 See References in Text note below.
of title III—
(i) that permits the unit during the demonstration period referred to in subparagraph (2) above, to emit at a rate in excess of the applicable emission rate;
(ii) at the conclusion of the demonstration period to revise the operating permit to reflect the alternative emission rate demonstrated in paragraphs (2) and (3) above.
Units subject to subsection (b)(1) for which an alternative emission limitation is established shall not be required to install any additional control technology beyond low NOx burners. Nothing in this section shall preclude an owner or operator from installing and operating an alternative NOx control technology capable of achieving the applicable emission limitation. If the owner or operator of a unit subject to the emissions limitation requirements of subsection (b)(1) demonstrates to the satisfaction of the Administrator that the technology necessary to meet such requirements is not in adequate supply to enable its installation and operation at the unit, consistent with system reliability, by January 1, 1995, then the Administrator shall extend the deadline for compliance for the unit by a period of 15 months. Any owner or operator may petition the Administrator to make a determination under the previous sentence. The Administrator shall grant or deny such petition within 3 months of submittal.
(e) Emissions averaging
(July 14, 1955, ch. 360, title IV, § 407, as added Pub. L. 101–549, title IV, § 401, Nov. 15, 1990, 104 Stat. 2613.)
§ 7651g. Permits and compliance plans
(a) Permit program
The provisions of this subchapter shall be implemented, subject to section 7651b of this title, by permits issued to units subject to this subchapter (and enforced) in accordance with the provisions of subchapter V, as modified by this subchapter. Any such permit issued by the Administrator, or by a State with an approved permit program, shall prohibit—
(1) annual emissions of sulfur dioxide in excess of the number of allowances to emit sulfur dioxide the owner or operator, or the designated representative of the owners or operators, of the unit hold for the unit,
(2) exceedances of applicable emissions rates,
(3) the use of any allowance prior to the year for which it was allocated, and
(4) contravention of any other provision of the permit.
Permits issued to implement this subchapter shall be issued for a period of 5 years, notwithstanding subchapter V. No permit shall be issued that is inconsistent with the requirements of this subchapter, and subchapter V as applicable.
(b) Compliance plan
Each initial permit application shall be accompanied by a compliance plan for the source to comply with its requirements under this subchapter. Where an affected source consists of more than one affected unit, such plan shall cover all such units, and for purposes of section 7661a(c) of this title, such source shall be considered a “facility”. Nothing in this section regarding compliance plans or in subchapter V shall be construed as affecting allowances. Except as provided under subsection (c)(1)(B), submission of a statement by the owner or operator, or the designated representative of the owners and operators, of a unit subject to the emissions limitation requirements of sections 7651c, 7651d, and 7651f of this title, that the unit will meet the applicable emissions limitation requirements of such sections in a timely manner or that, in the case of the emissions limitation requirements of sections 7651c and 7651d of this title, the owners and operators will hold allowances to emit not less than the total annual emissions of the unit, shall be deemed to meet the proposed and approved compliance planning requirements of this section and subchapter V, except that, for any unit that will meet the requirements of this subchapter by means of an alternative method of compliance authorized under section 7651c(b), (c), (d), or (f) of this title 1
1 So in original. Probably should be followed by a comma.
section 7651f(d) or (e) of this title, section 7651h of this title and section 7651i of this title, the proposed and approved compliance plan, permit application and permit shall include, pursuant to regulations promulgated by the Administrator, for each alternative method of compliance a comprehensive description of the schedule and means by which the unit will rely on one or more alternative methods of compliance in the manner and time authorized under this subchapter. Recordation by the Administrator of transfers of allowances shall amend automatically all applicable proposed or approved permit applications, compliance plans and permits. The Administrator may also require—
(1) for a source, a demonstration of attainment of national ambient air quality standards, and
(2) from the owner or operator of two or more affected sources, an integrated compliance plan providing an overall plan for achieving compliance at the affected sources.
(c) First phase permits
The Administrator shall issue permits to affected sources under sections 7651c and 7651f of this title.
(1) Permit application and compliance plan
(A) Not later than 27 months after November 15, 1990, the designated representative of the owners or operators, or the owner and operator, of each affected source under sections 7651c and 7651f of this title shall submit a permit application and compliance plan for that source in accordance with regulations issued by the Administrator under paragraph (3). The permit application and the compliance plan shall be binding on the owner or operator or the designated representative of owners and operators for purposes of this subchapter and section 7651a(a) 2
2 So in original. Section 7651a of this title does not contain subsections.
of this title, and shall be enforceable in lieu of a permit until a permit is issued by the Administrator for the source.
(B) In the case of a compliance plan for an affected source under sections 7651c and 7651f of this title for which the owner or operator proposes to meet the requirements of that section by reducing utilization of the unit as compared with its baseline or by shutting down the unit, the owner or operator shall include in the proposed compliance plan a specification of the unit or units that will provide electrical generation to compensate for the reduced output at the affected source, or a demonstration that such reduced utilization will be accomplished through energy conservation or improved unit efficiency. The unit to be used for such compensating generation, which is not otherwise an affected unit under sections 7651c and 7651f of this title, shall be deemed an affected unit under section 7651c of this title, subject to all of the requirements for such units under this subchapter, except that allowances shall be allocated to such compensating unit in the amount of an annual limitation equal to the product of the unit’s baseline multiplied by the lesser of the unit’s actual 1985 emissions rate or its allowable 1985 emissions rate, divided by 2,000.
(2) EPA action on compliance plans
(3) Regulations; issuance of permits
(4) Fees
(d) Second phase permits
(1) To provide for permits for (A) new electric utility steam generating units required under section 7651b(e) of this title to have allowances, (B) affected units or sources under section 7651d of this title, and (C) existing units subject to nitrogen oxide emission reductions under section 7651f of this title, each State in which one or more such units or sources are located shall submit in accordance with subchapter V, a permit program for approval as provided by that subchapter. Upon approval of such program, for the units or sources subject to such approved program the Administrator shall suspend the issuance of permits as provided in subchapter V.
(2) The owner or operator or the designated representative of each affected source under section 7651d of this title shall submit a permit application and compliance plan for that source to the permitting authority, not later than January 1, 1996.
(3) Not later than December 31, 1997, each State with an approved permit program shall issue permits to the owner or operator, or the designated representative of the owners and operators, of affected sources under section 7651d of this title that satisfy the requirements of subchapter V and this subchapter and that submitted to such State a permit application and compliance plan pursuant to paragraph (2). In the case of a State without an approved permit program by July 1, 1996, the Administrator shall, not later than January 1, 1998, issue a permit to the owner or operator or the designated representative of each such affected source. In the case of affected sources for which applications and plans are timely received under paragraph (2), the permit application and the compliance plan, including amendments thereto, shall be binding on the owner or operator or the designated representative of the owners or operators and shall be enforceable as a permit for purposes of this subchapter and subchapter V until a permit is issued by the permitting authority for the affected source. The provisions of section 558(c) of title 5 (relating to renewals) shall apply to permits issued by a permitting authority under this subchapter and subchapter V.
(4) The permit issued in accordance with this subsection for an affected source shall provide that the affected units at the affected source may not emit an annual tonnage of sulfur dioxide in excess of the number of allowances to emit sulfur dioxide the owner or operator or designated representative hold for the unit.
(e) New units
(f) Units subject to certain other limits
(g) Amendment of application and compliance plan
(h) Prohibition
(1) It shall be unlawful for an owner or operator, or designated representative, required to submit a permit application or compliance plan under this subchapter to fail to submit such application or plan in accordance with the deadlines specified in this section or to otherwise fail to comply with regulations implementing this section.
(2) It shall be unlawful for any person to operate any source subject to this subchapter except in compliance with the terms and requirements of a permit application and compliance plan (including amendments thereto) or permit issued by the Administrator or a State with an approved permit program. For purposes of this subsection, compliance, as provided in section 7661c(f) of this title, with a permit issued under subchapter V which complies with this subchapter for sources subject to this subchapter shall be deemed compliance with this subsection as well as section 7661a(a) of this title.
(3) In order to ensure reliability of electric power, nothing in this subchapter or subchapter V shall be construed as requiring termination of operations of an electric utility steam generating unit for failure to have an approved permit or compliance plan, except that any such unit may be subject to the applicable enforcement provisions of section 7413 of this title.
(i) Multiple owners
(July 14, 1955, ch. 360, title IV, § 408, as added Pub. L. 101–549, title IV, § 401, Nov. 15, 1990, 104 Stat. 2616.)
§ 7651h. Repowered sources
(a) Availability
Not later than December 31, 1997, the owner or operator of an existing unit subject to the emissions limitation requirements of section 7651d(b) and (c) of this title may demonstrate to the permitting authority that one or more units will be repowered with a qualifying clean coal technology to comply with the requirements under section 7651d of this title. The owner or operator shall, as part of any such demonstration, provide, not later than January 1, 2000, satisfactory documentation of a preliminary design and engineering effort for such repowering and an executed and binding contract for the majority of the equipment to repower such unit and such other information as the Administrator may require by regulation. The replacement of an existing utility unit with a new utility unit using a repowering technology referred to in section 7651a(2) 1
1 So in original. Probably should be section “7651a(12)”.
of this title which is located at a different site, shall be treated as repowering of the existing unit for purposes of this subchapter, if—
(1) the replacement unit is designated by the owner or operator to replace such existing unit, and
(2) the existing unit is retired from service on or before the date on which the designated replacement unit enters commercial operation.
(b) Extension
(1) An owner or operator satisfying the requirements of subsection (a) shall be granted an extension of the emission limitation requirement compliance date for that unit from January 1, 2000, to December 31, 2003. The extension shall be specified in the permit issued to the source under section 7651g of this title, together with any compliance schedule and other requirements necessary to meet second phase requirements by the extended date. Any unit that is granted an extension under this section shall not be eligible for a waiver under section 7411(j) of this title, and shall continue to be subject to requirements under this subchapter as if it were a unit subject to section 7651d of this title.
(2) If (A) the owner or operator of an existing unit has been granted an extension under paragraph (1) in order to repower such unit with a clean coal unit, and (B) such owner or operator demonstrates to the satisfaction of the Administrator that the repowering technology to be utilized by such unit has been properly constructed and tested on such unit, but nevertheless has been unable to achieve the emission reduction limitations and is economically or technologically infeasible, such existing unit may be retrofitted or repowered with equipment or facilities utilizing another clean coal technology or other available control technology.
(c) Allowances
(1) For the period of the extension under this section, the Administrator shall allocate to the owner or operator of the affected unit, annual allowances for sulfur dioxide equal to the affected unit’s baseline multiplied by the lesser of the unit’s federally approved State Implementation Plan emissions limitation or its actual emission rate for 1995 in lieu of any other allocation. Such allowances may not be transferred or used by any other source to meet emission requirements under this subchapter. The source owner or operator shall notify the Administrator sixty days in advance of the date on which the affected unit for which the extension has been granted is to be removed from operation to install the repowering technology.
(2) Effective on that date, the unit shall be subject to the requirements of section 7651d of this title. Allowances for the year in which the unit is removed from operation to install the repowering technology shall be calculated as the product of the unit’s baseline multiplied by 1.20 lbs/mmBtu, divided by 2,000, and prorated accordingly, and are transferable.
(3) Allowances for such existing utility units for calendar years after the year the repowering is complete shall be calculated as the product of the existing unit’s baseline multiplied by 1.20 lbs/mmBtu, divided by 2,000.
(4) Notwithstanding the provisions of section 7651b(a) and (e) of this title, allowances shall be allocated under this section for a designated replacement unit which replaces an existing unit (as provided in the last sentence of subsection (a)) in lieu of any further allocations of allowances for the existing unit.
(5) For the purpose of meeting the aggregate emissions limitation requirement set forth in section 7651b(a)(1) of this title, the units with an extension under this subsection shall be treated in each calendar year during the extension period as holding allowances allocated under paragraph (3).
(d) Control requirements
(e) Expedited permitting
(f) Prohibition
(July 14, 1955, ch. 360, title IV, § 409, as added Pub. L. 101–549, title IV, § 401, Nov. 15, 1990, 104 Stat. 2619.)
§ 7651i. Election for additional sources
(a) Applicability
(b) Establishment of baseline
(c) Emission limitations
(d) Process sources
(e) Allowances and permits
(f) Limitation
(g) Implementation
(h) Small diesel refineries
The Administrator shall issue allowances to owners or operators of small diesel refineries who produce diesel fuel after October 1, 1993, meeting the requirements of subsection 1
1 So in original. Probably should be “section”.
7545(i) of this title.
(1) Allowance period
(2) Allowance determination
(3) Refinery eligibility
As used in this subsection, the term “small refinery” shall mean a refinery or portion of a refinery—
(A) which, as of November 15, 1990, has bona fide crude oil throughput of less than 18,250,000 barrels per year, as reported to the Department of Energy, and
(B) which, as of November 15, 1990, is owned or controlled by a refiner with a total combined bona fide crude oil throughput of less than 50,187,500 barrels per year, as reported to the Department of Energy.
(4) Limitation per refinery
(5) Limitation on total
(6) Required certification
(July 14, 1955, ch. 360, title IV, § 410, as added Pub. L. 101–549, title IV, § 401, Nov. 15, 1990, 104 Stat. 2621.)
§ 7651j. Excess emissions penalty
(a) Excess emissions penalty
(b) Excess emissions offset
(c) Penalty adjustment
(d) Prohibition
(e) Savings provision
(July 14, 1955, ch. 360, title IV, § 411, as added Pub. L. 101–549, title IV, § 401, Nov. 15, 1990, 104 Stat. 2623.)
§ 7651k. Monitoring, reporting, and recordkeeping requirements
(a) Applicability
(b) First phase requirements
(c) Second phase requirements
(d) Unavailability of emissions data
(e) Prohibition
(July 14, 1955, ch. 360, title IV, § 412, as added Pub. L. 101–549, title IV, § 401, Nov. 15, 1990, 104 Stat. 2624.)
§ 7651l. General compliance with other provisions

Except as expressly provided, compliance with the requirements of this subchapter shall not exempt or exclude the owner or operator of any source subject to this subchapter from compliance with any other applicable requirements of this chapter.

(July 14, 1955, ch. 360, title IV, § 413, as added Pub. L. 101–549, title IV, § 401, Nov. 15, 1990, 104 Stat. 2625.)
§ 7651m. Enforcement

It shall be unlawful for any person subject to this subchapter to violate any prohibition of, requirement of, or regulation promulgated pursuant to this subchapter shall be a violation of this chapter.1

1 So in original.
In addition to the other requirements and prohibitions provided for in this subchapter, the operation of any affected unit to emit sulfur dioxide in excess of allowances held for such unit shall be deemed a violation, with each ton emitted in excess of allowances held constituting a separate violation.

(July 14, 1955, ch. 360, title IV, § 414, as added Pub. L. 101–549, title IV, § 401, Nov. 15, 1990, 104 Stat. 2625.)
§ 7651n. Clean coal technology regulatory incentives
(a) “Clean coal technology” defined
(b) Revised regulations for clean coal technology demonstrations
(1) Applicability
(2) Temporary projects
(3) Permanent projects
(4) EPA regulations
(c) Exemption for reactivation of very clean units
(
§ 7651o. Contingency guarantee, auctions, reserve
(a) DefinitionsFor purposes of this section—
(1) The term “independent power producer” means any person who owns or operates, in whole or in part, one or more new independent power production facilities.
(2) The term “new independent power production facility” means a facility that—
(A) is used for the generation of electric energy, 80 percent or more of which is sold at wholesale;
(B) is nonrecourse project-financed (as such term is defined by the Secretary of Energy within 3 months of November 15, 1990);
(C) does not generate electric energy sold to any affiliate (as defined in section 79b(a)(11) 1
1 See References in Text note below.
of title 15) of the facility’s owner or operator unless the owner or operator of the facility demonstrates that it cannot obtain allowances from the affiliate; and
(D) is a new unit required to hold allowances under this subchapter.
(3) The term “required allowances” means the allowances required to operate such unit for so much of the unit’s useful life as occurs after January 1, 2000.
(b) Special reserve of allowancesWithin 36 months after November 15, 1990, the Administrator shall promulgate regulations establishing a Special Allowance Reserve containing allowances to be sold under this section. For purposes of establishing the Special Allowance Reserve, the Administrator shall withhold—
(1) 2.8 percent of the allocation of allowances for each year from 1995 through 1999 inclusive; and
(2) 2.8 percent of the basic Phase II allowance allocation of allowances for each year beginning in the year 2000
which would (but for this subsection) be issued for each affected unit at an affected source. The Administrator shall record such withholding for purposes of transferring the proceeds of the allowance sales under this subsection. The allowances so withheld shall be deposited in the Reserve under this section.
(c) Direct sale at $1,500 per ton
(1) Subaccount for direct sales
(2) Sales
(3) Entitlement to written guaranteeAny independent power producer that submits an application to the Administrator establishing that such independent power producer—
(A) proposes to construct a new independent power production facility for which allowances are required under this subchapter;
(B) will apply for financing to construct such facility after January 1, 1990, and before the date of the first auction under this section;
(C) has submitted to each owner or operator of an affected unit listed in table A (in section 7651c of this title) a written offer to purchase the required allowances for $750 per ton; and
(D) has not received (within 180 days after submitting offers to purchase under subparagraph (C)) an acceptance of the offer to purchase the required allowances,
shall, within 30 days after submission of such application, be entitled to receive the Administrator’s written guarantee (subject to the eligibility requirements set forth in paragraph (4)) that such required allowances will be made available for purchase from the Direct Sale Subaccount established under this subsection and at a guaranteed price. The guaranteed price at which such allowances shall be made available for purchase shall be $1,500 per ton, adjusted by the percentage, if any, by which the Consumer Price Index (as determined under section 7661a(b)(3)(B)(v) of this title) for the year in which the allowance is purchased exceeds the Consumer Price Index for the calendar year 1990.
(4) Eligibility requirementsThe guarantee issued by the Administrator under paragraph (3) shall be subject to a demonstration by the independent power producer, satisfactory to the Administrator, that—
(A) the independent power producer has—
(i) made good faith efforts to purchase the required allowances from the owners or operators of affected units to which allowances will be allocated, including efforts to purchase at annual auctions under this section, and from industrial sources that have elected to become affected units pursuant to section 7651i of this title; and
(ii) such bids and efforts were unsuccessful in obtaining the required allowances; and
(B) the independent power producer will continue to make good faith efforts to purchase the required allowances from the owners or operators of affected units and from industrial sources.
(5) Issuance of guaranteed allowances from Direct Sale Subaccount under this section
(6) Proceeds
(7) Termination of subaccount
(d) Auction sales
(1) Subaccount for auctions
(2) Annual auctions
(3) Proceeds
(A) Notwithstanding section 3302 of title 31 or any other provision of law, within 90 days of receipt, the Administrator shall transfer the proceeds from the auction under this section, on a pro rata basis, to the owners or operators of the affected units at an affected source from whom allowances were withheld under subsection (b). No funds transferred from a purchaser to a seller of allowances under this paragraph shall be held by any officer or employee of the United States or treated for any purpose as revenue to the United States or the Administrator.
(B) At the end of each year, any allowances offered for sale but not sold at the auction shall be returned without charge, on a pro rata basis, to the owner or operator of the affected units from whose allocation the allowances were withheld.
(4) Additional auction participants
(5) Recording by EPA
(e) Changes in sales, auctions, and withholding
(f) Termination of auctions
(July 14, 1955, ch. 360, title IV, § 416, as added Pub. L. 101–549, title IV, § 401, Nov. 15, 1990, 104 Stat. 2626.)