§ 791. Congressional declaration of purpose
The purposes of this chapter are (1) to provide for a means to assist in meeting the essential needs of the United States for fuels, in a manner which is consistent, to the fullest extent practicable, with existing national commitments to protect and improve the environment, and (2) to provide requirements for reports respecting energy resources.
(Pub. L. 93–319, § 1(b), June 22, 1974, 88 Stat. 246.)
§ 792. Coal conversion and allocation
(a) Powerplant and fuel burning installations
The Federal Energy Administrator—
(1) shall, by order, prohibit any powerplant, and
(2) may, by order, prohibit any major fuel burning installation, other than a powerplant,
from burning natural gas or petroleum products as its primary energy source, if the requirements of subsection (b) are met and if (A) the Federal Energy Administrator determines such powerplant or installation on June 22, 1974, had, or thereafter acquires or is designed with, the capability and necessary plant equipment to burn coal, or (B) such powerplant or installation is required to meet a design or construction requirement under subsection (c).
(b) Prerequisites to issuance or effectiveness of orders prohibiting use of natural gas or petroleum products as primary energy source
The requirements referred to in subsection (a) are as follows:
(1) An order under subsection (a) may not be issued with respect to a powerplant or installation unless the Federal Energy Administrator finds (A) that the burning of coal by such plant or installation, in lieu of petroleum products or natural gas, is practicable and consistent with the purposes of this chapter, (B) that coal and coal transportation facilities will be available during the period the order is in effect, and (C) in the case of a powerplant, that the prohibition under subsection (a) will not impair the reliability of service in the area served by such plant. Such an order shall be rescinded or modified to the extent the Federal Energy Administrator determines that any requirement described in subparagraph (A), (B), or (C) of this paragraph is no longer met; and such an order may at any time be modified if the Federal Energy Administrator determines that such order, as modified, complies with the requirements of this section.
(2)
(A) Before issuing an order under subsection (a) which is applicable to a powerplant or installation for a period ending on or before June 30, 1975, the Federal Energy Administrator (i) shall give notice to the public and afford interested persons an opportunity for written presentations of data, views, and arguments, (ii) shall consult with the Administrator of the Environmental Protection Agency, and (iii) shall take into account the likelihood that the powerplant or installation will be permitted to burn coal after June 30, 1975.
(B) An order described in subparagraph (A) of this paragraph shall not become effective until the date which the Administrator of the Environmental Protection Agency certifies pursuant to section 1857c–10(d)(1)(A) 1
1 See References in Text note below.
of title 42 is the earliest date that such plant or installation will be able to comply with the air pollution requirements which will be applicable to it. Such order shall not be effective for any period certified by the Administrator of the Environmental Protection Agency pursuant to section 1857c–10(d)(3)(B) 1 of title 42.(3)
(A) Before issuing an order under subsection (a) which is applicable to a powerplant or installation after June 30, 1975 (or modifying an order to which paragraph (2) applies, so as to apply such order to a powerplant or installation after such date), the Federal Energy Administrator shall give notice to the public and afford interested persons an opportunity for oral and written presentations of data, views, and arguments.
(B) An order (or modification thereof) described in subparagraph (A) of this paragraph shall not become effective until (i) the Administrator of the Environmental Protection Agency notifies the Federal Energy Administrator under section 1857c–10(d)(1)(B) 1 of title 42 that such plant or installation will be able on and after July 1, 1975, to burn coal and to comply with all applicable air pollution requirements without a compliance date extension under section 1857c–10(c) 1 of title 42, or (ii) if such notification is not given, the date which the Administrator of the Environmental Protection Agency certifies pursuant to section 1857c–10(d)(1)(B) 1 of title 42 is the earliest date that such plant or installation will be able to comply with all applicable requirements of such 1857c–10 1 of title 42. Such order (or modification) shall not be effective during any period certified by the Administrator of the Environmental Protection Agency under section 1857c–10(d)(3)(B) 1 of title 42.
(c) Construction and design of powerplants or other major fuel burning installations
(d) Allocation of coal
(e) Definitions
For purposes of this section:
(1) The term “powerplant” means a fossil-fuel fired electric generating unit which produces electric power for purposes of sale or exchange.
(2) The term “coal” includes coal derivatives.
(f) Expiration of authority; effective dates
(1) Authority to issue orders or rules under subsections (a) through (d) of this section shall expire at midnight, December 31, 1978. Such a rule or order may take effect at any time before January 1, 1985.
(2) Authority to amend, repeal, rescind, modify, or enforce such rules or orders shall expire at midnight, December 31, 1984; but the expiration of such authority shall not affect any administrative or judicial proceeding which relates to any act or omission which occurred prior to January 1, 1985.
(Pub. L. 93–319, § 2, June 22, 1974, 88 Stat. 246; Pub. L. 94–163, title I, § 101, Dec. 22, 1975, 89 Stat. 875; Pub. L. 95–70, § 7, July 21, 1977, 91 Stat. 277.)
§ 793. Protection of public health and environment
(a) Distribution of low sulfur fuel
(b) Study of chronic effects of sulfur oxide emissions among exposed populations
(c) Major Federal actions significantly affecting the quality of the human environment
(1) No action taken under the Clean Air Act [42 U.S.C. 7401 et seq.] shall be deemed a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.].
(2) No action under section 792 of this title for a period of one year after initiation of such action shall be deemed a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 [42 U.S.C. 4321 et seq.]. However, before any action under section 792 of this title that has a significant impact on the environment is taken, if practicable, or in any event within sixty days after such action is taken, an environmental evaluation with analysis equivalent to that required under section 102(2)(C) of the National Environmental Policy Act [42 U.S.C. 4332(2)(C)], to the greatest extent practicable within this time constraint, shall be prepared and circulated to appropriate Federal, State, and local government agencies and to the public for a thirty-day comment period after which a public hearing shall be held upon request to review outstanding environmental issues. Such an evaluation shall not be required where the action in question has been preceded by compliance with the National Environmental Policy Act by the appropriate Federal agency. Any action taken under section 792 of this title which will be in effect for more than a one-year period or any action to extend an action taken under section 792 of this title to a total period of more than one year shall be subject to the full provisions of the National Environmental Policy Act, notwithstanding any other provision of this chapter.
(d) Importation of hydroelectric energy
(Pub. L. 93–319, § 7, June 22, 1974, 88 Stat. 259; Pub. L. 96–88, title V, § 509(b), Oct. 17, 1979, 93 Stat. 695.)
§ 794. Energy conservation study
(a) Study of conservation methods
The Federal Energy Administrator shall conduct a study on potential methods of energy conservation and, not later than six months after June 22, 1974, shall submit to Congress a report on the results of such study. The study shall include, but not be limited to, the following:
(1) the energy conservation potential of restricting exports of fuels or energy-intensive products, or goods, including an analysis of balance-of-payments and foreign relations implications of any such restrictions;
(2) alternative requirements, incentives, or disincentives for increasing industrial recycling and resource recovery in order to reduce energy demand, including the economic costs and fuel consumption tradeoff which may be associated with such recycling and resource recovery in lieu of transportation and use of virgin materials; and
(3) means for incentives or disincentives to increase efficiency of industrial use of energy.
(b) Emergency mass transportation assistance plan
(c) Recommendations in plan
Such plan shall include, but shall not be limited to—
(1) recommendations for emergency temporary grants to assist States and local public bodies and agencies thereof in the payment of operating expenses incurred in connection with the provision of expanded mass transportation service in urban areas;
(2) recommendations for additional emergency assistance for the purchase of buses and rolling stock for fixed rail, including the feasibility of accelerating the timetable for such assistance under section 142(a)(2) of title 23 for the purpose of providing additional capacity for and encouraging increased use of public mass transportation systems;
(3) recommendations for a program of demonstration projects to determine the feasibility of fare-free and low-fare urban mass transportation systems, including reduced rates for elderly and handicapped persons during nonpeak hours of transportation;
(4) recommendations for additional emergency assistance for the construction of fringe and transportation corridor parking facilities to serve bus and other mass transportation passengers;
(5) recommendations on the feasibility of providing tax incentives for persons who use public mass transportation systems.
(Pub. L. 93–319, § 8, June 22, 1974, 88 Stat. 260.)
§ 795. Report to Congress by January 31, 1975
The Administrator of the Environmental Protection Agency shall report to Congress not later than January 31, 1975, on the implementation of sections 3 through 7 of the Energy Supply and Environmental Coordination Act of 1974.
(Pub. L. 93–319, § 9, June 22, 1974, 88 Stat. 261.)
§ 796. Reporting of energy information
(a) Authority of Federal Energy Administrator to request, acquire, and collect energy information; rules and regulations
(b) Powers of Federal Energy Administrator in obtaining energy information; verification of accuracy; compliance orders
(1) In order to obtain energy information for the purpose of carrying out the provisions of subsection (a), the Federal Energy Administrator is authorized—
(A) to require, by rule, any person who is engaged in the production, processing, refining, transportation by pipeline, or distribution (at other than the retail level) of energy resources to submit reports;
(B) to sign and issue subpenas for the attendance and testimony of witnesses and the production of books, records, papers, and other documents;
(C) to require any person, by general or special order, to submit answers in writing to interrogatories, requests for reports or for other information; and such answers or other submissions shall be made within such reasonable period, and under oath or otherwise, as the Federal Energy Administrator may determine; and
(D) to administer oaths.
(2) For the purpose of verifying the accuracy of any energy information requested, acquired, or collected by the Federal Energy Administrator, the Federal Energy Administrator, or any officer or employer 2
2 So in original. Probably should be “employee”.
duly designated by him, upon presenting appropriate credentials and a written notice from the Federal Energy Administrator to the owner, operator, or agent in charge, may—(A) enter, at reasonable times, any business premise or facility; and
(B) inspect, at reasonable times and in a reasonable manner, any such premise or facility, inventory and sample any stock of energy resources therein, and examine and copy books, records, papers, or other documents, relating to any such energy information.
(3) Any United States district court within the jurisdiction of which any inquiry is carried on may, upon petition by the Attorney General at the request of the Federal Energy Administrator, in the case of refusal to obey a subpena or order of the Federal Energy Administrator issued under this section, issue an order requiring compliance therewith; and any failure to obey the order of the court may be punished by the court as a contempt thereof.
(c) Development of initial report; quarterly reports; accounting practices
(1) The Federal Energy Administrator shall exercise the authorities granted to him under subsection (b)(1)(A) to develop, within thirty days after June 22, 1974, as full and accurate a measure as is reasonably practicable of—
(A) domestic reserves and production;
(B) imports; and
(C) inventories;
of crude oil, residual fuel oil, refined petroleum products, natural gas, and coal.
(2) For each calendar quarter beginning with the first complete calendar quarter following June 22, 1974, the Federal Energy Administrator shall develop and publish a report containing the following energy information:
(A) Imports of crude oil, residual fuel oil, refined petroleum products (by product), natural gas, and coal, identifying (with respect to each such oil, product, gas, or coal) country of origin, arrival point, quantity received, and the geographic distribution within the United States.
(B) Domestic reserves and production of crude oil, natural gas, and coal.
(C) Refinery activities, showing for each refinery within the United States (i) the amounts of crude oil run by such refinery, (ii) amounts of crude oil allocated to such refinery pursuant to regulations and orders of the Federal Energy Administrator, his delegate pursuant to the Emergency Petroleum Allocation Act of 1973 [15 U.S.C. 751 et seq.],1 or any other person authorized by law to issue regulations and orders with respect to the allocation of crude oil, (iii) percentage of refinery capacity utilized, and (iv) amounts of products refined from such crude oil.
(D) Report of inventories, on a national, regional, and State-by-State basis—
(i) of various refined petroleum products, related refiners, refineries, suppliers to refiners, share of market, and allocation fractions;
(ii) of various refined petroleum products, previous quarter deliveries and anticipated three-month available supplies;
(iii) of anticipated monthly supply of refined petroleum products, amount of set-aside for assignment by the State, anticipated State requirements, excess or shortfall of supply, and allocation fraction of base year; and
(iv) of LPG by State and owner: quantities stored, and existing capacities, and previous priorities on types, inventories of suppliers, and changes in supplier inventories.
(3) In order to carry out his responsibilities under subsection (a) of this section, the Federal Energy Administrator shall require, pursuant to subsection (b)(1)(A) of this section, that persons engaged, in whole or in part, in the production of crude oil or natural gas—
(A) keep energy information in accordance with the accounting practices developed pursuant to section 503 of the Energy Policy and Conservation Act [42 U.S.C. 6383], and
(B) submit reports with respect to energy information kept in accordance with such practices.
The Administrator shall file quarterly reports with the President and the Congress compiled from accounts kept in accordance with such section 503 and submitted to the Administrator in accordance with this paragraph. Such reports shall present energy information in the categories specified in subsection (c) of such section 503 to the extent that such information may be compiled from such accounts. Such energy information shall be collected and such quarterly reports made for each calendar quarter which begins 6 months after the date on which the accounting practices developed pursuant to such section 503 are made effective.
(d) Confidential information
(e) DefinitionsAs used in this section:
(1) The term “energy information” includes (A) all information in whatever form on (i) fuel reserves, exploration, extraction, and energy resources (including petrochemical feedstocks) wherever located; (ii) production, distribution, and consumption of energy and fuels wherever carried on; and (B) matters relating to energy and fuels, such as corporate structure and proprietary relationships, costs, prices, capital investment, and assets, and other matters directly related thereto, wherever they exist.
(2) The term “person” means any natural person, corporation, partnership, association, consortium, or any entity organized for a common business purpose, wherever situated, domiciled, or doing business, who directly or through other persons subject to their control does business in any part of the United States.
(3) The term “United States” when used in the geographical sense means the States, the District of Columbia, Puerto Rico, and the territories and possessions of the United States.
(f) Availability of energy information
(g) Independent nature of authority to gather energy information
(Pub. L. 93–319, § 11, June 22, 1974, 88 Stat. 262; Pub. L. 94–163, title V, §§ 505(a), 506, Dec. 22, 1975, 89 Stat. 960; Pub. L. 95–620, title VII, § 762(d), Nov. 9, 1978, 92 Stat. 3346; Pub. L. 108–271, § 8(b), July 7, 2004, 118 Stat. 814.)
§ 797. Enforcement
(a) Violations
(b) Penalties; injunctions; declaratory judgments
(1) Whoever violates any provision of subsection (a) shall be subject to a civil penalty of not more than $2,500 for each violation.
(2) Whoever willfully violates any provision of subsection (a) shall be fined not more than $5,000 for each violation.
(3) It shall be unlawful for any person to offer for sale or distribute in commerce any coal in violation of an order or regulation issued pursuant to section 792(d) of this title. Any person who knowingly and willfully violates this paragraph after having been subjected to a civil penalty for a prior violation of the same provision of any order or regulation issued pursuant to section 792(d) of this title shall be fined not more than $50,000, or imprisoned not more than six months, or both.
(4) Whenever it appears to the Federal Energy Administrator or any person authorized by the Federal Energy Administrator to exercise authority under section 792 of this title or section 796 of this title that any individual or organization has engaged, is engaged, or is about to engage in acts or practices constituting a violation of subsection (a) the Federal Energy Administrator or such person may request the Attorney General to bring a civil action to enjoin such acts or practices, and upon a proper showing, a temporary restraining order or a preliminary or permanent injunction shall be granted without bond. In such action, the court may also issue mandatory injunctions commanding any person to comply with any provision, the violation of which is prohibited by subsection (a).
(5) Any person suffering legal wrong because of any act or practice arising out of any violation of subsection (a) may bring a civil action for appropriate relief, including an action for a declaratory judgment or writ of injunction. United States district courts shall have jurisdiction of actions under this paragraph without regard to the amount in controversy. Nothing in this paragraph shall authorize any person to recover damages.
(Pub. L. 93–319, § 12, June 22, 1974, 88 Stat. 264.)
§ 798. Definitions
(a) For purposes of this chapter and the Clean Air Act [42 U.S.C. 7401 et seq.] the term “Federal Energy Administrator” means the Administrator of the Federal Energy Administration established by Federal Energy Administration Act of 1974 [15 U.S.C. 761 et seq.]; except that until such Administrator takes office and after such Administration ceases to exist, such term means any officer of the United States designated as Federal Energy Administrator by the President for purposes of this chapter and section 119 1
1 See References in Text note below.
of the Clean Air Act [42 U.S.C. 1857c–10].(b) For purposes of this chapter, the term “petroleum product” means crude oil, residual fuel oil, or any refined petroleum product (as defined in section 752(5) 1 of this title).
(Pub. L. 93–319, § 14, June 22, 1974, 88 Stat. 265.)