View all text of Subchapter III [§ 6921 - § 6939g]

§ 6925. Permits for treatment, storage, or disposal of hazardous waste
(a) Permit requirements
(b) Requirements of permit applicationEach application for a permit under this section shall contain such information as may be required under regulations promulgated by the Administrator, including information respecting—
(1) estimates with respect to the composition, quantities, and concentrations of any hazardous waste identified or listed under this subchapter, or combinations of any such hazardous waste and any other solid waste, proposed to be disposed of, treated, transported, or stored, and the time, frequency, or rate of which such waste is proposed to be disposed of, treated, transported, or stored; and
(2) the site at which such hazardous waste or the products of treatment of such hazardous waste will be disposed of, treated, transported to, or stored.
(c) Permit issuance
(1) Upon a determination by the Administrator (or a State, if applicable), of compliance by a facility for which a permit is applied for under this section with the requirements of this section and section 6924 of this title, the Administrator (or the State) shall issue a permit for such facilities. In the event permit applicants propose modification of their facilities, or in the event the Administrator (or the State) determines that modifications are necessary to conform to the requirements under this section and section 6924 of this title, the permit shall specify the time allowed to complete the modifications.
(2)
(A)
(i) Not later than the date four years after November 8, 1984, in the case of each application under this subsection for a permit for a land disposal facility which was submitted before such date, the Administrator shall issue a final permit pursuant to such application or issue a final denial of such application.
(ii) Not later than the date five years after November 8, 1984, in the case of each application for a permit under this subsection for an incinerator facility which was submitted before such date, the Administrator shall issue a final permit pursuant to such application or issue a final denial of such application.
(B) Not later than the date eight years after November 8, 1984, in the case of each application for a permit under this subsection for any facility (other than a facility referred to in subparagraph (A)) which was submitted before such date, the Administrator shall issue a final permit pursuant to such application or issue a final denial of such application.
(C) The time periods specified in this paragraph shall also apply in the case of any State which is administering an authorized hazardous waste program under section 6926 of this title. Interim status under subsection (e) shall terminate for each facility referred to in subparagraph (A)(ii) or (B) on the expiration of the five- or eight-year period referred to in subparagraph (A) or (B), whichever is applicable, unless the owner or operator of the facility applies for a final determination regarding the issuance of a permit under this subsection within—
(i) two years after November 8, 1984 (in the case of a facility referred to in subparagraph (A)(ii)), or
(ii) four years after November 8, 1984 (in the case of a facility referred to in subparagraph (B)).
(3) Any permit under this section shall be for a fixed term, not to exceed 10 years in the case of any land disposal facility, storage facility, or incinerator or other treatment facility. Each permit for a land disposal facility shall be reviewed five years after date of issuance or reissuance and shall be modified as necessary to assure that the facility continues to comply with the currently applicable requirements of this section and section 6924 of this title. Nothing in this subsection shall preclude the Administrator from reviewing and modifying a permit at any time during its term. Review of any application for a permit renewal shall consider improvements in the state of control and measurement technology as well as changes in applicable regulations. Each permit issued under this section shall contain such terms and conditions as the Administrator (or the State) determines necessary to protect human health and the environment.
(d) Permit revocation
(e) Interim status
(1) Any person who—
(A) owns or operates a facility required to have a permit under this section which facility—
(i) was in existence on November 19, 1980, or
(ii) is in existence on the effective date of statutory or regulatory changes under this chapter that render the facility subject to the requirement to have a permit under this section,
(B) has complied with the requirements of section 6930(a) of this title, and
(C) has made an application for a permit under this section,
shall be treated as having been issued such permit until such time as final administrative disposition of such application is made, unless the Administrator or other plaintiff proves that final administrative disposition of such application has not been made because of the failure of the applicant to furnish information reasonably required or requested in order to process the application. This paragraph shall not apply to any facility which has been previously denied a permit under this section or if authority to operate the facility under this section has been previously terminated.
(2) In the case of each land disposal facility which has been granted interim status under this subsection before November 8, 1984, interim status shall terminate on the date twelve months after November 8, 1984, unless the owner or operator of such facility—
(A) applies for a final determination regarding the issuance of a permit under subsection (c) for such facility before the date twelve months after November 8, 1984; and
(B) certifies that such facility is in compliance with all applicable groundwater monitoring and financial responsibility requirements.
(3) In the case of each land disposal facility which is in existence on the effective date of statutory or regulatory changes under this chapter that render the facility subject to the requirement to have a permit under this section and which is granted interim status under this subsection, interim status shall terminate on the date twelve months after the date on which the facility first becomes subject to such permit requirement unless the owner or operator of such facility—
(A) applies for a final determination regarding the issuance of a permit under subsection (c) for such facility before the date twelve months after the date on which the facility first becomes subject to such permit requirement; and
(B) certifies that such facility is in compliance with all applicable groundwater monitoring and financial responsibility requirements.
(f) Coal mining wastes and reclamation permits
(g) Research, development, and demonstration permits
(1) The Administrator may issue a research, development, and demonstration permit for any hazardous waste treatment facility which proposes to utilize an innovative and experimental hazardous waste treatment technology or process for which permit standards for such experimental activity have not been promulgated under this subchapter. Any such permit shall include such terms and conditions as will assure protection of human health and the environment. Such permits—
(A) shall provide for the construction of such facilities, as necessary, and for operation of the facility for not longer than one year (unless renewed as provided in paragraph (4)), and
(B) shall provide for the receipt and treatment by the facility of only those types and quantities of hazardous waste which the Administrator deems necessary for purposes of determining the efficacy and performance capabilities of the technology or process and the effects of such technology or process on human health and the environment, and
(C) shall include such requirements as the Administrator deems necessary to protect human health and the environment (including, but not limited to, requirements regarding monitoring, operation, insurance or bonding, financial reponsibility,1
1 So in original. Probably should be “responsibility”.
closure, and remedial action), and such requirements as the Administrator deems necessary regarding testing and providing of information to the Administrator with respect to the operation of the facility.
The Administrator may apply the criteria set forth in this paragraph in establishing the conditions of each permit without separate establishment of regulations implementing such criteria.
(2) For the purpose of expediting review and issuance of permits under this subsection, the Administrator may, consistent with the protection of human health and the environment, modify or waive permit application and permit issuance requirements established in the Administrator’s general permit regulations except that there may be no modification or waiver of regulations regarding financial responsibility (including insurance) or of procedures established under section 6974(b)(2) of this title regarding public participation.
(3) The Administrator may order an immediate termination of all operations at the facility at any time he determines that termination is necessary to protect human health and the environment.
(4) Any permit issued under this subsection may be renewed not more than three times. Each such renewal shall be for a period of not more than 1 year.
(h) Waste minimizationEffective September 1, 1985, it shall be a condition of any permit issued under this section for the treatment, storage, or disposal of hazardous waste on the premises where such waste was generated that the permittee certify, no less often than annually, that—
(1) the generator of the hazardous waste has a program in place to reduce the volume or quantity and toxicity of such waste to the degree determined by the generator to be economically practicable; and
(2) the proposed method of treatment, storage, or disposal is that practicable method currently available to the generator which minimizes the present and future threat to human health and the environment.
(i) Interim status facilities receiving wastes after July 26, 1982
(j) Interim status surface impoundments
(1) Except as provided in paragraph (2), (3), or (4), each surface impoundment in existence on November 8, 1984, and qualifying for the authorization to operate under subsection (e) of this section shall not receive, store, or treat hazardous waste after the date four years after November 8, 1984, unless such surface impoundment is in compliance with the requirements of section 6924(o)(1)(A) of this title which would apply to such impoundment if it were new.
(2) Paragraph (1) of this subsection shall not apply to any surface impoundment which (A) has at least one liner, for which there is no evidence that such liner is leaking; (B) is located more than one-quarter mile from an underground source of drinking water; and (C) is in compliance with generally applicable ground water monitoring requirements for facilities with permits under subsection (c) of this section.
(3) Paragraph (1) of this subsection shall not apply to any surface impoundment which (A) contains treated waste water during the secondary or subsequent phases of an aggressive biological treatment facility subject to a permit issued under section 1342 of title 33 (or which holds such treated waste water after treatment and prior to discharge); (B) is in compliance with generally applicable ground water monitoring requirements for facilities with permits under subsection (c) of this section; and (C)(i) is part of a facility in compliance with section 1311(b)(2) of title 33, or (ii) in the case of a facility for which no effluent guidelines required under section 1314(b)(2) of title 33 are in effect and no permit under section 1342(a)(1) of title 33 implementing section 1311(b)(2) of title 33 has been issued, is part of a facility in compliance with a permit under section 1342 of title 33, which is achieving significant degradation of toxic pollutants and hazardous constituents contained in the untreated waste stream and which has identified those toxic pollutants and hazardous constituents in the untreated waste stream to the appropriate permitting authority.
(4) The Administrator (or the State, in the case of a State with an authorized program), after notice and opportunity for comment, may modify the requirements of paragraph (1) for any surface impoundment if the owner or operator demonstrates that such surface impoundment is located, designed and operated so as to assure that there will be no migration of any hazardous constitutent 2
2 So in original. Probably should be “constituent”.
into ground water or surface water at any future time. The Administrator or the State shall take into account locational criteria established under section 6924(o)(7) of this title.
(5) The owner or operator of any surface impoundment potentially subject to paragraph (1) who has reason to believe that on the basis of paragraph (2), (3), or (4) such surface impoundment is not required to comply with the requirements of paragraph (1), shall apply to the Administrator (or the State, in the case of a State with an authorized program) not later than twenty-four months after November 8, 1984, for a determination of the applicability of paragraph (1) (in the case of paragraph (2) or (3)) or for a modification of the requirements of paragraph (1) (in the case of paragraph (4)), with respect to such surface impoundment. Such owner or operator shall provide, with such application, evidence pertinent to such decision, including:
(A) an application for a final determination regarding the issuance of a permit under subsection (c) of this section for such facility, if not previously submitted;
(B) evidence as to compliance with all applicable ground water monitoring requirements and the information and analysis from such monitoring;
(C) all reasonably ascertainable evidence as to whether such surface impoundment is leaking; and
(D) in the case of applications under paragraph (2) or (3), a certification by a registered professional engineer with academic training and experience in ground water hydrology that—
(i) under paragraph (2), the liner of such surface impoundment is designed, constructed, and operated in accordance with applicable requirements, such surface impoundment is more than one-quarter mile from an underground source of drinking water and there is no evidence such liner is leaking; or
(ii) under paragraph (3), based on analysis of those toxic pollutants and hazardous constituents that are likely to be present in the untreated waste stream, such impoundment satisfies the conditions of paragraph (3).
In the case of any surface impoundment for which the owner or operator fails to apply under this paragraph within the time provided by this paragraph or paragraph (6), such surface impoundment shall comply with paragraph (1) notwithstanding paragraph (2), (3), or (4). Within twelve months after receipt of such application and evidence and not later than thirty-six months after November 8, 1984, and after notice and opportunity to comment, the Administrator (or, if appropriate, the State) shall advise such owner or operator on the applicability of paragraph (1) to such surface impoundment or as to whether and how the requirements of paragraph (1) shall be modified and applied to such surface impoundment.
(6)
(A) In any case in which a surface impoundment becomes subject to paragraph (1) after November 8, 1984, due to the promulgation of additional listings or characteristics for the identification of hazardous waste under section 6921 of this title, the period for compliance in paragraph (1) shall be four years after the date of such promulgation, the period for demonstrations under paragraph (4) and for submission of evidence under paragraph (5) shall be not later than twenty-four months after the date of such promulgation, and the period for the Administrator (or if appropriate, the State) to advise such owners or operators under paragraph (5) shall be not later than thirty-six months after the date of promulgation.
(B) In any case in which a surface impoundment is initially determined to be excluded from the requirements of paragraph (1) but due to a change in condition (including the existence of a leak) no longer satisfies the provisions of paragraph (2), (3), or (4) and therefore becomes subject to paragraph (1), the period for compliance in paragraph (1) shall be two years after the date of discovery of such change of condition, or in the case of a surface impoundment excluded under paragraph (3) three years after such date of discovery.
(7)
(A) The Administrator shall study and report to the Congress on the number, range of size, construction, likelihood of hazardous constituents migrating into ground water, and potential threat to human health and the environment of existing surface impoundments excluded by paragraph (3) from the requirements of paragraph (1). Such report shall address the need, feasibility, and estimated costs of subjecting such existing surface impoundments to the requirements of paragraph (1).
(B) In the case of any existing surface impoundment or class of surface impoundments from which the Administrator (or the State, in the case of a State with an authorized program) determines hazardous constituents are likely to migrate into ground water, the Administrator (or if appropriate, the State) is authorized to impose such requirements as may be necessary to protect human health and the environment, including the requirements of section 6924(o) of this title which would apply to such impoundments if they were new.
(C) In the case of any surface impoundment excluded by paragraph (3) from the requirements of paragraph (1) which is subsequently determined to be leaking, the Administrator (or, if appropriate, the State) shall require compliance with paragraph (1), unless the Administrator (or, if appropriate, the State) determines that such compliance is not necessary to protect human health and the environment.
(8) In the case of any surface impoundment in which the liners and leak detection system have been installed pursuant to the requirements of paragraph (1) and in good faith compliance with section 6924(o) of this title and the Administrator’s regulations and guidance documents governing liners and leak detection systems, no liner or leak detection system which is different from that which was so installed pursuant to paragraph (1) shall be required for such unit by the Administrator when issuing the first permit under this section to such facility. Nothing in this paragraph shall preclude the Administrator from requiring installation of a new liner when the Administrator has reason to believe that any liner installed pursuant to the requirements of this subsection is leaking.
(9) In the case of any surface impoundment which has been excluded by paragraph (2) on the basis of a liner meeting the definition under paragraph (12)(A)(ii), at the closure of such impoundment the Administrator shall require the owner or operator of such impoundment to remove or decontaminate all waste residues, all contaminated liner material, and contaminated soil to the extent practicable. If all contaminated soil is not removed or decontaminated, the owner or operator of such impoundment shall be required to comply with appropriate post-closure requirements, including but not limited to ground water monitoring and corrective action.
(10) Any incremental cost attributable to the requirements of this subsection or section 6924(o) of this title shall not be considered by the Administrator (or the State, in the case of a State with an authorized program under section 1342 of title 33)—
(A) in establishing effluent limitations and standards under section 1311, 1314, 1316, 1317, or 1342 of title 33 based on effluent limitations guidelines and standards promulgated any time before twelve months after
(B) in establishing any other effluent limitations to carry out the provisions of section 1311, 1317, or 1342 of title 33 on or before October 1, 1986.
(11)
(A) If the Administrator allows a hazardous waste which is prohibited from one or more methods of land disposal under subsection (d), (e), or (g) of section 6924 of this title (or under regulations promulgated by the Administrator under such subsections) to be placed in a surface impoundment (which is operating pursuant to interim status) for storage or treatment, such impoundment shall meet the requirements that are applicable to new surface impoundments under section 6924(o)(1) of this title, unless such impoundment meets the requirements of paragraph (2) or (4).
(B) In the case of any hazardous waste which is prohibited from one or more methods of land disposal under subsection (d), (e), or (g) of section 6924 of this title (or under regulations promulgated by the Administrator under such subsection) the placement or maintenance of such hazardous waste in a surface impoundment for treatment is prohibited as of the effective date of such prohibition unless the treatment residues which are hazardous are, at a minimum, removed for subsequent management within one year of the entry of the waste into the surface impoundment.
(12)
(A) For the purposes of paragraph (2)(A) of this subsection, the term “liner” means—
(i) a liner designed, constructed, installed, and operated to prevent hazardous waste from passing into the liner at any time during the active life of the facility; or
(ii) a liner designed, constructed, installed, and operated to prevent hazardous waste from migrating beyond the liner to adjacent subsurface soil, ground water, or surface water at any time during the active life of the facility.
(B) For the purposes of this subsection, the term “aggressive biological treatment facility” means a system of surface impoundments in which the initial impoundment of the secondary treatment segment of the facility utilizes intense mechanical aeration to enhance biological activity to degrade waste water pollutants and
(i) the hydraulic retention time in such initial impoundment is no longer than 5 days under normal operating conditions, on an annual average basis;
(ii) the hydraulic retention time in such initial impoundment is no longer than thirty days under normal operating conditions, on an annual average basis: Provided, That the sludge in such impoundment does not constitute a hazardous waste as identified by the extraction procedure toxicity characteristic in effect on November 8, 1984; or
(iii) such system utilizes activated sludge treatment in the first portion of secondary treatment.
(C) For the purposes of this subsection, the term “underground source or 3
3 So in original. Probably should be “of”.
drinking water” has the same meaning as provided in regulations under the Safe Drinking Water Act (title XIV of the Public Health Service Act [42 U.S.C. 300f et seq.]).
(13) The Administrator may modify the requirements of paragraph (1) in the case of a surface impoundment for which the owner or operator, prior to October 1, 1984, has entered into, and is in compliance with, a consent order, decree, or agreement with the Administrator or a State with an authorized program mandating corrective action with respect to such surface impoundment that provides a degree of protection of human health and the environment which is at a minimum equivalent to that provided by paragraph (1).
(Pub. L. 89–272, title II, § 3005, as added Pub. L. 94–580, § 2, Oct. 21, 1976, 90 Stat. 2808; amended Pub. L. 95–609, § 7(h), Nov. 8, 1978, 92 Stat. 3082; Pub. L. 96–482, §§ 10, 11, Oct. 21, 1980, 94 Stat. 2338; Pub. L. 98–616, title II, §§ 211–213(a), (c), 214(a), 215, 224(b), 243(c), Nov. 8, 1984, 98 Stat. 3240–3243, 3253, 3261; Pub. L. 104–119, § 4(6), (7), Mar. 26, 1996, 110 Stat. 833.)